Grace Neal Channel Construction Phase 3

Active
2027-001-IFBState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Mohave County Flood Control District is soliciting bids for Phase 3 of the Grace Neal Channel project, a regional flood control initiative designed to intercept upstream flows and convey them to the Mohave Wash. This phase involves excavation and lining of the channel from Eastview Road to Bank Street, reconstruction of the upper segment of Phase 1 from Roosevelt Street to Bank Street to enhance channel and culvert capacities, and the construction of a new channel segment from Eastview Road to the Summerhaven inlet. The design must accommodate 100-year flood flows based on the Grace Neal Channel Design Concept Report Update, operating under a supercritical flow regime, and must conform to detailed plans, specifications, and geotechnical requirements outlined in the contract documents including Attachment B (Plans), Attachment C (Drainage Design Report), and Attachment D (Specs). The work includes expanding an existing box culvert at Bank Street, installing safety rails, drainage ditches, offsite inlets, asphalt pavement replacement, curb and gutter, and concrete sidewalks. The project is funded through grants, including support from the Environmental Protection Agency, and is subject to federal compliance requirements such as Buy America, Davis-Bacon Act, and 2 CFR § 200.327, as well as state regulations including A.R.S. Title 34 for bonding and A.R.S. § 23-214(A) for immigration law compliance. The contract is issued as an Invitation for Bid with a submission deadline of August 5, 2026, and awards will be made to the lowest responsive and responsible bidder. Contract performance must be completed within 180 calendar days from the Notice to Proceed, with liquidated damages of $910 per day for delays. Contractors must provide performance and payment bonds as required by state law, maintain insurance coverage throughout the contract term and warranty periods, and comply with OSHA, ADA, and hazardous materials regulations. All materials, including gabions, Reno Mattresses Plus, and tied concrete block mats, must be shipped in collapsed, factory-banded forms with specific labeling requirements for dimensions, quantity, and color code. The contractor must submit as-built drawings and a point file for final acceptance and maintain financial records in accordance with GAAP for three years beyond contract completion, subject to audit by the County. The project enforces a 4% SBE/DBE participation goal, and contractors must demonstrate good-faith efforts to engage certified disadvantaged business enterprises. Payments will be processed within

General Info

Finish lining and construct Phase 3 stormwater channel in Kingman, Arizona, coordinating with local developer’s culverts.

Agency

Arizona → Flood Control DistrictView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

(6)

Grace Neal Channel Construction Phase 3 Special Provisions

PDFspecifications

EPA Grant Award CG-97T46001-0 for Mohave County Grace Neal Channel Phase 3

PDFaward

Mohave County IFB 2027-001 Grace Neal Channel Construction Phase 3

PDFifb

Davis-Bacon Wage Determination AZ20250058 for Mohave County Heavy Construction

PDFwage-determination

Grace Neal Channel Construction Phase 3 - Plans

PDFspecifications

Grace Neal Channel Phase 3 Drainage Design Report March 2025

PDFsow

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyArizona → Flood Control District
Contacts1 person available
OfficeKingman, AZ, 60111, US
Organization / Agency
Arizona → Flood Control District
View Agency Profile
Office AddressKingman, AZ, 60111, US
Contacts
Shelli WhaleyProcurement Officer I

Interested Companies (11)

Show more
Perco Rock
Cedar City, UT
B4 Enterprises
Cedar City, UT
Ferguson Waterworks
Oklahoma City, OK

See All 11 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Grace Neal Channel is located on the north side of the planned Grace Neal Parkway. Upstream flows will be intercepted by this regional channel and conveyed to the Mohave Wash. The regional channel has been split into four phases. Phase 1 was constructed in 2019. Phase 2 and 3 have been roughly excavated but not lined. A local developer, who owns property adjacent to Phase 3, has plans to cross the channel in two locations with RCB culverts to be constructed in coordination with this project. These box culverts are not part of this County project but the contractors are expected to work together during construction. Funds for the basin construction come from grants, supplemented by budgeted money from the Mohave County Flood Control District.

Similar Contracts

NAICS: 237990
New
SLED
Deaerator (DA) and Condensate System UpgradesThe Port of Seattle’s Aviation Project Management Group is forecasting an upcoming project to replace the Deaerator and Condensate tanks within the Central Mechanical Plant. This initiative aims to upgrade critical infrastructure supporting the facility’s steam and condensate systems, ensuring operational reliability and efficiency. The work involves the removal and installation of new equipment, requiring specialized skills in mechanical system integration, safety compliance, and industrial piping. The North American Industry Classification System code 237990 indicates this is classified under Other Heavy and Civil Engineering Construction, underscoring the scale and complexity of the undertaking. Primary point of contact for this forecast is Leila Gonzalez-Rigatto, reachable via phone or email, with Matthew Piccolo serving as the Project Manager. Although the solicitation number and set-aside details are not yet available, the posting date suggests the opportunity is in a preliminary stage, with formal bidding likely to follow. The project will be performed at the Central Mechanical Plant, though no specific city or state is listed in the address details. Interested parties are encouraged to monitor the provided UI link for upcoming solicitation documents, as this project will require experienced contractors familiar with industrial boiler room systems and large-scale mechanical replacements.
Aviation Project Management Group

POSTED

about 3 hours ago

DEADLINE

N/A
View Details