Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on June 26, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction Manager at Risk for Hidalgo County Courthouse Phase II

Closed
24-0077-07-17-09State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
You are hereby invited to submit a sealed bid for MGCCC - Athletic Performance Addition located at the Perkinston Campus of Mississippi Gulf Coast Community College, Perkinston, Mississippi. Bids will be received from contractors at the Maintenance, T
Solicitation # 3170036832
Solicitation number 3170036832 is an invitation for sealed bids to complete the Athletic Performance Addition at the Perkinston Campus of Mississippi Gulf Coast Community College in Perkinston, Mississippi. The project is managed by the MS Development Authority for the Board of Trustees of the college. Contractors must submit single stipulated sum bids for all work required by the contract documents, including drawings and specifications. Bids are due by 2:30 P.M. on Thursday, October 29, 2026, and can be submitted physically at the Maintenance, Transportation and Technology Services Center or electronically via the designated portal. The award process emphasizes responsiveness and responsibility, requiring bidders to provide security in the specified amount and form. Successful bidders must provide performance and payment bonds. Compliance with Mississippi state laws is mandatory, specifically regarding the Certificate of Responsibility. Resident contractors are granted preference over non-residents, and non-resident bidders must provide a copy of their own state's laws regarding the treatment of non-resident contractors. Bids remain valid for sixty days following the opening date, and inquiries should be directed to Heather Wantland.
MPTAP

POSTED

about 1 hour ago

DEADLINE

in about 23 hours
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, categorized under NAICS code 236220, focuses on basin improvements in California, specifically within the Riverside or Los Angeles project areas. The solicitation is designated as a set-aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. The response deadline is November 4, 2026, with the primary point of contact being Richie Tran. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise (DBE) Good Faith Effort (GFE) requirements to secure project financing. Bidders must demonstrate comprehensive outreach and recruitment activities, including posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit proof of these specific efforts within the bid package will result in the proposal being deemed non-responsive. While outreach documentation may be submitted up to three business days after the closing date, all other GFE requirements must be completed before the bid opening.
RT CONTRACTOR CORP

POSTED

about 3 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected the first, second, and third floors. The scope of work includes architectural repairs such as replacing and painting drywall and ceilings, installing new flooring and rubber wall bases, and performing necessary electrical repairs and vanity or cabinet replacements. The total period of performance is 105 days, with substantial completion required within 90 days of the Notice to Proceed and final completion within an additional 15 days. This opportunity is set aside for Small Businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, compliance with NFPA-101, OSHA, and EPA regulations, and adherence to Davis-Bacon Act wage rates. Contractors must provide a one-year guarantee on workmanship and maintain specific automobile liability insurance naming Adams and Associates, Inc. as an additional insured.
Grafton Job Corps

POSTED

about 3 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in utility rooms and hallways, along with the temporary disconnection and re-installation of HVAC equipment, water heaters, and furnaces. The project is set as a small business set-aside and is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposing contractors must provide a detailed proposal including relevant experience, a safe work method description covering project phasing and occupied-building protection, and itemized pricing by room and trade. Pricing must remain firm for 60 days and include separate costs for materials, labor, permits, and disposal. Awardees are required to provide payment and performance bonding for the full project value, as well as proof of liability and worker's compensation insurance, within ten days of award. Deliverables include a project schedule, safety plan, and a minimum one-year workmanship warranty upon final acceptance by CSD. Performance is expected to occur between February 1, 2024, and March 31, 2024.
Career Systems Development Corporation

POSTED

about 3 hours ago

DEADLINE

in 22 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
The P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut, is a comprehensive construction effort managed by J & J Contractors, Inc. The project spans 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. Key structural elements include reinforced concrete floors, grounding and lightning protection, intrusion detection systems, and specialized foundations utilizing rigid inclusions and load transfer mats. Additionally, the scope includes the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The comprehensive scope of work requires pricing for a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Site preparation is extensive, involving clearing, rock excavation, grading, and mitigation for impacts on existing wetlands. Infrastructure improvements consist of new access roads, paved loading areas, landscaping, and a full electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB certifications.
J & J Contractors, Inc

POSTED

about 3 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The Hidalgo County construction project seeks a Construction Manager at Risk for the development of the Hidalgo County Courthouse Phase II, with a solicitation posted on June 26, 2024, and a response deadline of July 17, 2024. The project has a substantial estimated value ranging from 50 million to 100 million dollars and falls under NAICS code 236220, indicating a focus on construction of commercial and institutional buildings. The procurement process emphasizes compliance with federal and state regulations, including mandatory federal contract provisions such as those outlined in FHWA-1273 for federal-aid construction, and 2 CFR Part 200 for federal awards, ensuring adherence to labor standards, nondiscrimination policies, safety protocols, and debarment certifications. The county also prioritizes equitable participation of Historically Underutilized Businesses (HUBs), requiring contractors to declare HUB involvement and subcontracting plans aiming for at least 30% HUB participation. The solicitation package includes comprehensive documentation to ensure legal and regulatory compliance, such as certifications regarding debarment, suspension, and ineligibility, as well as Title VI nondiscrimination assurances and property transfer clauses. Contractors must submit references evaluating past performance and complete conflict of interest questionnaires as part of their application. Additionally, the project emphasizes adherence to military standards for packaging and shipping when relevant, and incorporates provisions for federal funding compliance, including remedies for breach and termination clauses. The procurement process is managed through Hidalgo County’s purchasing department, with designated points of contact for assistance, and all documentation underscores the importance of transparency, equal opportunity, and regulatory adherence throughout the project lifecycle.

General Info

Documents

14

2 CFR 200 Appendix II Required Contract Clauses for Federal Awards

PDF, High priority: read this first15 pages · contract-clauses
High

Construction Management at Risk Services Statement of Work

PDF, High priority: read this firstsow
High

Davis-Bacon Wage Determination TX20230255 Hidalgo County TX

PDF, High priority: read this firstwage-determination
High

FHWA Form 1273 - Required Contract Provisions for Federal-Aid Construction Contracts

PDF, High priority: read this first13 pages · contract-document
High

Hidalgo County Construction Contract C-XX-XXXX-XX-XX Draft Agreement

PDF, High priority: read this firstcontract-document
High

Insurance Requirements for Goods and Services Acquisition

PDF, High priority: read this firstinsurance-requirements
High

RFP 24-0077-07-17-09 Construction Manager at Risk for Hidalgo County Courthouse Phase II

PDF, High priority: read this firstrfp
High

RFQ No.24-0077 Requirements and Specifications for CMAR Services

PDF, High priority: read this first9 pages · rfq
High

Certification Regarding Debarment, Suspension and Ineligibility

PDF, Low priority1 page · certification
Low

Conflict of Interest Questionnaire for Local Government Vendor

PDF, Low priority2 pages · conflict-of-interest-questionnaire
Low

Hidalgo County Historically Underutilized Business (HUB) Declaration

PDF, Low priority1 page · hub-declaration
Low

Hidalgo County Reference Form

PDF, Low priority2 pages · reference-form
Low

Proposer's Affidavit of Non-Collusion for Hidalgo County RFP

PDF, Low priority1 page · proposers-affidavit
Low

Title VI Appendices - Contractor Assurances and Property Clauses

PDF, Low priority5 pages · appendices
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Hidalgo County
Contacts1 person available
OfficeN/A
Organization / AgencyTexas → Hidalgo County
Office AddressN/A
Contacts

Full Description

Show more
RELEASE DATE: Wednesday, June 26, 2024RE: HIDALGO COUNTY - REQUEST FOR PROPOSALSRFP NO.:24-0077-07-17-09 –Construction Manager at Risk for Hidalgo County Courthouse Phase IIDear Prospect Offeror:Hidalgo County Purchasing Department welcomes and appreciates your interest and participation. For your review and consideration, enclosed find the procurement packet for the aforementioned project. Modifications and new requirements have been added and implemented. Please ensure to carefully read and review all instructions, requirements and specifications. All times referenced in this procurement packet are Central Standard Time – CST.If assistance is required, please do not hesitate to call the Purchasing Department at +1 (555) 000-0000.Sincerely,Ignacio Amezcua, MBA, CTCM, CTCDHidalgo County Purchasing Director

More opportunities from Texas → Hidalgo County

Same awarding agency

NAICS: 562991
New
SLED
Turnkey Water Extraction and Related Services
Solicitation # 26-0569-11-04-03
Hidalgo County is soliciting proposals under RFP No. 26-0569-11-04-03 for turnkey water extraction and related services to support flood emergencies. The selected vendor must provide water trucks and pumps capable of reaching a minimum depth of 20 feet and a distance of 70 feet from the side embankment. Requirements include the ability to deploy between 6 and 24 vacuum trucks with capacities of 5,000 to 6,000 gallons simultaneously. Services may be requested 24 hours a day, 7 days a week, 365 days a year. The vendor is responsible for the disposal of black or brown water and must provide 24-hour periodic operational updates during engagements. All drivers must hold a valid Texas Commercial Driver’s License, and the vendor must maintain all necessary state and federal certifications. The award will be based on the most efficient and economical proposal, considering compliance, delivery speed, and the specific needs of the user department rather than price alone. The evaluation process involves a preliminary review, negotiations, and a request for a Best and Final Offer. Proposers must submit electronic responses via the designated portal by November 4, 2026, including a Proposer's Affidavit, references, and SAM.gov registration. The contract mandates compliance with various regulations, including the Davis Bacon Act for prevailing wages on projects exceeding 2,000 dollars, Title VI of the Civil Rights Act, and OSHA standards. Additionally, the contract incorporates federal requirements such as 2 CFR 200 and prohibitions on certain telecommunications equipment.
Septic Tank and Related Services

POSTED

about 4 hours ago

DEADLINE

in 7 days
View Details
NAICS: 562112
SLED
Biohazardous and Medical Waste Disposal Services and Supplies
Solicitation # 26-0557-11-06-07
Hidalgo County is soliciting bids under RFB No. 26-0557-11-06-07 for the provision of biohazardous and medical waste disposal services and supplies. The scope of work includes the collection, packaging, transportation, treatment, incineration, and disposal of regulated medical waste, biohazardous and infectious waste, formalin preserved tissue specimens, and applicable chemical waste materials for various county departments on an as-needed basis. The selected vendor must provide all necessary containers, liners, labels, and packaging materials, ensuring all operations comply with federal, state, and local laws. Key requirements include a minimum of three years of experience in medical waste disposal and active registration with the Texas Commission on Environmental Quality as a transporter of untreated medical waste. Responses are due by November 6, 2026, at 3:00 PM CST and can be submitted electronically via the portal or physically via hard copy and USB. Evaluation is based on price, performance, efficiency, and compliance with user department needs, though the county reserves the right to award the contract to the offer considered best in its interest rather than the lowest bidder. Required submission documents include a HUB declaration, proof of insurance, SAM.gov registration, and a signed certification regarding debarment. The contract incorporates various federal and state regulations, including the Nondiscrimination Civil Rights Act of 1964 and the Davis Bacon Act for prevailing wages on contracts exceeding 2,000 dollars.
Hazardous Waste Collection

POSTED

11 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS