Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on August 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction Manager at Risk for New Precinct 4 Maintenance Center

Closed
F2027007State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 04, 2026. A critical component of this contract is strict adherence to DBE Good Faith Effort (GFE) requirements to secure project financing. Bidders must demonstrate comprehensive outreach and recruitment, including posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must utilize the services of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to provide proof of these specific postings and agency utilizations within the bid package will result in the proposal being deemed non-responsive. Prime contractors are further required to flow these GFE obligations down to any subcontractors they award.
RT CONTRACTOR CORP

POSTED

about 13 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, along with an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofing, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 13 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located at 41901 Walnut Avenue in Greenfield, California. The project is scheduled for completion within 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and utility relocation; construction of the plant featuring a packaged Membrane Bioreactor system, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing wastewater treatment plant in service during the first two phases of construction. Managed by C. Overaa & Co., the solicitation encourages participation from small and disadvantaged businesses, including DBE, DVBE, MBE, WBE, and SBE certified firms. There is a specific local hiring goal requiring that 50 percent of the total construction workforce consist of residents from Monterey, San Benito, and Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are required to accept the standard Overaa agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026.
C. Overaa & Co.

POSTED

about 13 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements feature reinforced concrete floors, grounding and lightning protection, intrusion detection systems, and specialized foundation work using rigid inclusions and load transfer mats. The project encompasses a wide range of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Site work is extensive, requiring clearing, rock excavation, grading, and the mitigation of impacts on existing wetlands. Infrastructure improvements include the installation of primary and secondary electrical distribution systems, telecommunications, access roads, and paved loading areas. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026, by contacting the primary point of contact to receive the formal bid invitation and documents.
J & J Contractors, Inc

POSTED

about 13 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

Tarrant County is soliciting proposals for a Construction Manager at Risk (CMAR) to oversee the construction of the New Precinct 4 Maintenance Center located at 1005 Scotland Avenue, Azle, Texas. The project scope includes the development of an administration building, maintenance building, fleet building, fuel station with two 5,000-gallon tanks and four pumps, eight covered storage buildings totaling approximately 11,580 square feet, covered parking areas, and retaining walls. The CMAR will operate in two phases: Phase 1 focuses on preconstruction services, including estimating and the establishment of a Guaranteed Maximum Price (GMP), while Phase 2 covers the full construction, occupancy, and warranty phases. The project is governed by Texas Local Government Code Chapter 2269 and utilizes AIA contract forms, specifically A133-2019 and A201-2017. The selection process is a one-step method where proposals are evaluated based on construction management services (20%), project team staffing (20%), price proposal (35%), experience with similar projects (10%), safety records (10%), and references (5%). Mandatory requirements for the selected firm include providing payment and performance bonds from a Texas Department of Insurance licensed surety for contracts exceeding specific thresholds, adhering to Davis-Bacon Act prevailing wage rates, and complying with a 20% good faith target goal for Historically Underutilized Businesses (HUB). Technical specifications are provided by Parkhill, McAdams, WJHW, Inc., and Datacom Design Group, with comprehensive geotechnical reports and stability analyses already completed to guide foundation and retaining wall design. Final award decisions are made by the Tarrant County Commissioners Court.

General Info

Tarrant County seeks CMAR for Azle maintenance center construction with full execution and advisory responsibilities.

Documents

15

AIA Document A133-2019 - Agreement Between Owner and Construction Manager

PDF, High priority: read this firstcontract-document
High

AIA Document A201-2017 General Conditions of the Contract for Construction

PDF, High priority: read this firstcontract-document
High

Bond Requirements Document for Tarrant County Project

PDF, High priority: read this first3 pages · bond-requirements
High

F2027007 Construction Manager at Risk for New Precinct 4 Maintenance Center RFP

PDF, High priority: read this firstrfp
High

F2027007 Geotechnical Report Addendum W261337-A

PDF, High priority: read this firstgeotechnical-report
High

F2027007 Safety Record Questionnaire Form

PDF, High priority: read this firstsafety-record-questionnaire
High

F2027007 Statement of Work for New Precinct 4 Maintenance Center CMAR

PDF, High priority: read this firstsow
High

F2027007 Tarrant County Precinct 4 Maintenance Center Project Manual

PDF, High priority: read this firstproject-manual
High

F2027007 Volume 1 - Facilities Management RFP Instructions to Proposers

PDF, High priority: read this firstrfp
High

Geotechnical Engineering Report for Tarrant County PCT 4 Maintenance Center W261337

PDF, High priority: read this firstgeotechnical-report
High

Geotechnical Engineering Report for Tarrant County Precinct 4 Service Center

PDF, High priority: read this firstgeotechnical-report
High

Tarrant County General Terms and Conditions

PDF, High priority: read this first2 pages · terms-and-conditions
High

Tarrant County Special Terms and Conditions Standard Ver 3

PDF, High priority: read this first3 pages · special-terms-and-conditions
High

F2027007 Geotechnical Report for Tarrant County PCT 4 Maintenance Center

PDF, Low prioritygeotechnical-report
Low

Tarrant County Historically Underutilized Businesses (HUB) Policy May 2023

PDF, Low priority5 pages · policy
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Tarrant County
Contacts1 person available
OfficeTX, USA
Organization / AgencyTexas → Tarrant County
Office AddressTX, USA
Contacts
Gwen Peterson SeniorBuyer

Full Description

Show more
Tarrant County is seeking proposals from qualified construction firms to provide Construction Manager at Risk (CMAR) Services necessary for the construction of the New Precinct 4 Maintenance Center, located at 1005 Scotland Avenue, Azle TX 76020. The facility will include an Administration Building, Maintenance Building, Fleet Building, Covered Storage, Fuel Island, and Covered Parking Areas. The Construction Manager At Risk will assume the risk for construction of the project, at the contracted price as the general contractor, and provide consultation to the Owner regarding construction during and after any redesign of the project, in accordance with all applicable requirements of the project and all applicable laws. It is the intention of Tarrant County to select a Construction Manager At Risk using a one-step selection process. Please go to the “Attachments” tab to download all solicitation documents. Please go to the “Activities” tab for information regarding the Pre-Proposal Conference and Site-Walks. Technical Specifications Prepared by: Architect, Landscape Architect, Structural Engineer , MEP Engineer , Interior Designer: Parkhill 640 Taylor Street, Suite 1900 Fort Worth, TX 76102 Civil Engineer: McAdams 4400 State Hwy. 121, Suite 800 Lewisville, TX 75056 Audio/Video System: WJHW, Inc. 3424 Midcourt Road, Suite 124 Carrollton, TX 75006 IT/Security: Datacom Design Group 300 N. Coit Road Richardson, TX 75080

More opportunities from Texas → Tarrant County

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS