Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

Construction - NUWCDIVNPT B68 Rm 136 Renovation Project

Active
N6660426Q0291Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract, titled "Construction - NUWCDIVNPT B68 Rm 136 Renovation Project," is issued by the Naval Undersea Warfare Center Division Newport under the Department of Defense and is set in Newport, Rhode Island. It is a total small business set-aside solicitation with the NAICS code 236220, covering construction services. The solicitation was posted on May 14, 2026, with a response deadline of June 12, 2026. Contractors interested in this opportunity must be registered and active in the SAM.gov system but do not need to be JCP certified to receive solicitation documents, which include drawings, specifications, and photos. Access to controlled attachments requires special authorization, limited to individuals holding data entry or administrator roles within their entity’s SAM.gov profile. Requests for access must be submitted through SAM.gov, providing justification, and are subject to review and approval by the contracting officer. Entities are responsible for proper management of the sensitive documents according to prescribed directives. Points of contact for the solicitation are Michael Ouellette and Alexander Olarte, and all related activities and document access requests must be handled via the official SAM.gov portal linked to the contract workspace.

General Info

Naval construction project in Newport, RI, small business set-aside, requires SAM.gov registration.

Agency

Department Of Defense → Nuwc Division Newport

NAICS

236220 - Commercial and Institutional Building Construction View NAICS

Place of Performance

Newport, RI, 02841, USA

Set-Aside

SBA

Documents

(7)

NUWC Division Newport Contractor Monthly Fuel Usage Log for Generators

PDFlog

Davis Bacon Wage Determination RI20260001 01/30/2026

PDFwage-determination

N66604-26-Q-0291 B68 Room 136 Renovation Solicitation

PDFrfq

Davis Bacon Wage Determination Rhode Island May 18 2026

PDFwage-determination

Amendment 0002 to Solicitation N6660426Q0291

PDFamendment

Hazmat Usage Log for Contractors

PDFhazmat-usage-log

NUWCDIVNPT Site Visit Instructions May 27, 2026

PDFsite-visit-instructions

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseCombined Synopsis
Amendment 2

Contract was updated

Amendment 3

Contract was updated

Posted

Combined Synopsis

Amendment 0

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Nuwc Division Newport
Contacts2 people available
OfficeNEWPORT, RI, 02841-1703, USA
Organization / Agency
Department Of Defense → Nuwc Division Newport
Office AddressNEWPORT, RI, 02841-1703, USA
Contacts

Full Description

Show more

PLEASE READ THIS ENTIRE NOTICE CAREFULLY AS IT CONSTITUES THE ONLY NOTICE THAT WILL BE ISSUED.


Amendment 0001 6/2/2026:
The purpose of this Amendment is to:


  1. Replace Attachment #3 with revised version dated 18 May 2026.
  2. Answer RFI 001 as seen below.

RFI 001


1. For the flex duct penetration through the exterior wall, will this require a full, top-to-bottom piece of the metal siding to be replaced, or will a partial repair be acceptable?


A1. Partial repair is approved. The Navy is seeking to eliminate any drafts once the duct work is removed. Penetration in wall shall be completely sealed.


2. Please provide pictures of the windows requiring new glazing. Please include interior and exterior photos and possibly an exterior photo of the entire wall, showing upper and lower windows. For interior, please ensure the hardware is captured.


A2. No new glazing is required.


3. During the site visit, it was observed that a leak capture system was in place. Please confirm if this roof leak has been repaired, or if the leak is still active.


A3. Leak is no longer active. No repairs to roof are required.


4. The solicitation documents included a Hazmat study of the building. Within this study, it indicates that lead paint is found on the white paint on drywall walls, white paint on the wood window sills, and the pale yellow paint on the concrete exterior wall under the drywall. For this project scope and limit of disturbance, there are no white drywall walls, no window sills, and the concrete exterior wall under the drywall will not be exposed. Is lead paint remediation required under the scope of work for only the Rm 136 renovations?


A4. See Revised Specifications (REV 1).


5. There is no spec for the glass for the windows. Will a spec section for the glass be made available?


A5. See Revised Specifications (REV 1).


6. Does the electrical subcontractor performing the electrical scope of work need to hold a Rhode Island electrical license, or will an out-of-state electrical license suffice for this project?


A6. Out-of-State is Allowed.


7.  Are electric man-lifts permitted for use on this project?


A7. Yes, however, it might be difficult getting a man lift in the area of work.


All other solicitation terms and conditions remain unchanged.



-------------------------------------------------------------------------------------------------------------------------------------------------------------------------


Please see N6660426Q0291 and all attachments for complete requirement details. 



Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active registration in SAM.GOV.


Interested parties should request access to drawings, specifications, and photos within the attachments section of this solicitation. NUWCDIVNPT will review and approved requests within SAM.GOV.


A controlled attachment requires special handling due to the information it contains. You must have a data entry or administrator role within the Contract Opportunities domain for an entity in SAM.gov in order to request access. If you do not have a proper role, you can request it from an existing entity administrator or have the existing administrator assign roles directly to you. If your entity does not have a direct employee, officer or board member appointed as the Entity Administrator, you will need to complete an Entity Administrator Appointment Letter.


You must request access to the attachment by clicking on its title and providing the reason you need access.


You will not receive immediate access to view the document. The contracting officer will review your request to grant or reject your access.


Your entity is responsible for managing the documents in accordance with prescribed directives.


https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=733b9d881bbc71506397ec21f54bcb0a



Please see Amendment 0002 attached. Additional Photos attached. 

Similar Contracts

NAICS: 236220
New
SLED
Swinerton Invitation for Prequalification of Qualified Subcontractors and Suppliers: Lockers, Signage, Final CleanSwinerton is inviting qualified subcontractors and suppliers to prequalify for a collaborative design-build project at the California State University Bakersfield campus. The project involves the design and construction of a new 56,500 gross square feet Energy and Innovation Building, which will feature offices, research and teaching laboratories, a capstone design lab, an event space with flexible design, and outdoor engagement areas. This public works project is subject to prevailing wage requirements and includes specific trade bid packages such as signage, final cleaning, and solid phenolic core lockers. There is a required Disabled Veteran Business Enterprise (DVBE) participation goal of 6%. Interested subcontractors must submit completed prequalification forms by July 2, 2026, with trade bid packages expected to be posted on June 12, 2026. Construction is anticipated to start on January 1, 2026, and is scheduled for completion by June 16, 2027. Required submittals include the Swinerton Builders Prequalification form and the Master Service Agreement. For further information or to prequalify, subcontractors are directed to contact the Swinerton Prequalification Team via the provided email. Relevant documents and updates can be accessed through Swinerton’s subcontractor prequalification portal.
CSU, Bakersfield

POSTED

about 23 hours ago

DEADLINE

in 16 days
View Details
NAICS: 236220
New
SLED
Lake Mountain School District Design-Build Services Centralized District Operations & Institutional FacilityThis contract involves awarding a single Design-Build team a turnkey project to provide comprehensive services including civil engineering, architectural and structural design, utility extension, permitting, procurement, and full construction for a new approximately 25,000 square foot pre-engineered steel institutional facility. The facility will be located on a seven-acre site owned by the Lake Mountain School District in Utah County and is intended to consolidate the district's centralized operations, administrative functions, public assembly spaces, technical departments, and specialized student services into one integrated campus. The successful offeror will hold single-point responsibility for all design and construction phases, ensuring coordination and completion under one contract. The procurement is managed by Alpine School District's Department of Purchasing on behalf of Lake Mountain School District, with the solicitation number LMSD06292026. Proposals must be submitted by 4:00 PM Mountain Time on June 29, 2026. The contract duration is project-based, with construction expected to begin on October 15, 2026, and substantial completion targeted for June 2027. The selection will be made based on the highest score that meets the procurement code criteria, emphasizing responsiveness and responsibility of the proposing Design-Build teams.
Utah

POSTED

about 23 hours ago

DEADLINE

in 13 days
View Details