Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Texas was posted on August 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction of a Fuel Canopy for the Beaumont Municipal Transit System

Closed
DF0826-15State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
Lytton First Nation – Berm Construction
Solicitation # 24-3028C
Solicitation 24-3028C is for the construction of the Nohomeen Recovery Berm located at the Stein Subdivision in Stryen, Lytton, British Columbia, for the Lytton First Nation. The project involves significant earthworks and the installation of a retaining wall using lock block facing units with a minimum 28-day concrete strength of 20 MPa and a specific batter of 5 degrees. Key technical requirements include the use of Type I Engineered Fill and retained backfill, both compacted to 100 percent of the maximum density per ASTM D698 standards. The scope also includes the installation of 150mm perforated PVC toe and heel drains, vertical cleanouts, rodent guards, and a clear crush chimney drain, with NILEX 4545 non-woven geotextile required at soil interfaces. The project mandates strict environmental and cultural compliance, requiring adherence to Thompson-NOXLAND Regional District Bylaws and Department of Fisheries and Oceans Land Development Guidelines. Contractors must install silt fencing prior to excavation and ensure all soil removal is conducted by a company employing a qualified cultural assist. Quality assurance is managed through the Geotechnical Engineer of Record, who must approve the subgrade and wall bearing surface before wall construction begins. Additionally, the contractor is responsible for verifying wall batter every block course and limiting the use of heavy equipment to a minimum distance of 0.75 meters from the wall face. Responses to this solicitation are due by October 22, 2026.
Lytton First Nation

POSTED

2 days ago

DEADLINE

in 18 days
NAICS: 237990
New
SLED
Contract 26-2 Furnace Creek Tank Painting
Solicitation # Contract 26-2
The Womelsdorf-Robesonia Joint Authority is soliciting sealed bids for Contract 26-2, which involves the interior and exterior painting of the Furnace Creek Tank, a 1,500,000-gallon welded steel ground water storage tank measuring 68 feet in diameter and 56 feet in height. The scope of work includes foundation joint and crack repair, incidental weld repairs, and coordination with the contractor awarded Contract 26-1 for tank metals. All work is subject to oversight by a third-party paint inspector, and the project must be completed within 150 days from the Notice to Proceed. Bids must be submitted electronically via the PennBid program by 2:00 PM on October 21, 2026, and must include a bid bond or certified check for 10 percent of the bid price. This project is funded through a Penn VEST Drinking Water State Revolving Fund loan and must comply with the Build America, Buy America Act and American Iron and Steel requirements, meaning all iron, steel, and construction materials must be produced in the United States unless a waiver is granted. Additionally, the contract is subject to Davis-Bacon Wage Rates and requires various certifications, including Equal Employment Opportunity and Non-Segregated Facilities. Awarding will be based on the most advantageous bid. Once awarded, the contractor must provide performance and payment bonds within 15 days and submit a list of key personnel before starting construction. Payment is processed monthly via an Application for Payment reviewed by the Engineer.
Berks County

POSTED

2 days ago

DEADLINE

in 17 days
NAICS: 237990
New
SLED
2026-0011
Solicitation # 48935
The Cornerstone of Centerville South Phase I Public Improvements project is a civil and electrical construction solicitation issued by the City of Centerville, Ohio, with an engineer's estimate of $4,973,490.39. The scope of work includes the installation of conduits, structures, concrete drive aprons with curbs, seeding, mulching, and a design-build electrical component. The electrical portion requires the contractor to design and build the electrical service and associated conductors, including the installation of 22 decorative light fixtures, light pole bases, and specific connector kits. All work must adhere to the Ohio Building Code, N.E.C., N.F.P.A. Standard 70, and ODOT specifications, with a project completion date set for September 30, 2027. Bids are submitted as unit price proposals via Bid Express, with a final response deadline of October 13, 2026. The selection process evaluates the lowest and best bid based on project history, available resources, financial ability, and compliance with federal, state, and local laws, including Ohio Prevailing Wage and OSHA regulations. Required financial securities include a bid bond for the full amount of the bid or a 10 percent certified check, and a 100 percent performance bond upon award. Insurance requirements specify minimum coverage of $2,000,000 for Commercial General Liability, $1,000,000 for Auto, and $1,000,000 for Workers Compensation. Contract administration is managed by Oberer Construction Managers Ltd. on behalf of the City.
City of Centerville

POSTED

2 days ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
Pierpont Nuisance Sand Removal
Solicitation # P-130000901
The City of San Buenaventura is soliciting proposals for solicitation number P-130000901 to perform nuisance sand removal from City-owned portions of Pierpont Beach between San Pedro Lane and Greenock Lane. This recurring project occurs twice annually, once in May and once in November, to satisfy a legal Settlement Agreement. The scope of work involves grading, removing, and hauling excess beach sand from up to 27 beach access lanes and the frontage of up to 17 private properties. Contractors must excavate sand wedges to specified limits, ensuring they remain no deeper than 6 inches above structural footings with a slope no more than 1:1.75, and transport the material to designated deposit sites while avoiding the tidal zone. Proposals are due by October 20, 2026, at 4:00 PM PST, and must be submitted as a sealed hard copy to the Purchasing and Contracts Division in Ventura, California. The City will award the contract based on the perceived best fit and best value, evaluating proposals on a scale of 0.0 to 15.0. Key requirements include compliance with Cal-OSHA safety standards, the California Manual on Uniform Traffic Control Devices, and a Biological Resource Assessment. Additionally, state prevailing wages for Ventura County apply to all workers. While a faithful performance bond is not required, a bid security of at least 10 percent may be requested, and a 5 percent credit is available for qualified Small Local Businesses.
City of San Buenaventura

POSTED

2 days ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The City of Beaumont is soliciting bids under solicitation number DF0826-15 for the construction of a fuel canopy for the Beaumont Municipal Transit System located at 550 Milam Street, Beaumont, Texas. The project requires a qualified contractor to provide all labor, materials, equipment, and supervision necessary to complete the structure, with an expected performance period of twelve months and a possible six-month extension. A mandatory pre-bid meeting was scheduled for August 26, 2026, and the deadline for bid submission via the city's e-bids platform is September 3, 2026. The contract is expected to exceed 50,000 dollars and requires City Council approval for the award. Technical requirements include adherence to the BIC 2024 building code, AISC standards for structural steel, and compliance with ADA and Texas Accessibility Standards. Contractors must comply with the Davis-Bacon Act for prevailing wages and Buy America certifications for steel, iron, and manufactured products. Evaluation factors for the award include the company's operational history, financial standing, resource capacity, and at least three past performance references. Required submission documents include a non-collusion form, lobbying certifications for bids exceeding 100,000 dollars, and various federal and state compliance affidavits. Upon award, the contractor must provide a performance bond and a payment bond representing 100 percent of the contract amount.

General Info

City of Beaumont seeks bids for BMT fuel canopy construction by September 3, 2026.

Documents

5

DF0826-15 Construction of Fuel Canopy Formal Bid

PDF, High priority: read this firstifb
High

DF0826-15 Foundation Plan Structural Notes

PDF, High priority: read this firstspecifications
High

DF0826-15 Invitation to Bid - Fuel Canopy Construction Beaumont TX

PDF, High priority: read this firstitb
High

DF0826-15 Technical Specifications for Municipal Transit Canopy

PDF, High priority: read this firstspecifications
High

DF0826-15 Site Plan for City of Beaverton

PDF, Low prioritysite-plan
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City Of Beaumont
Contacts1 person available
OfficeTX, USA
Organization / AgencyTexas → City Of Beaumont
Office AddressTX, USA
Contacts

Full Description

Show more
The City of Beaumont is seeking bids from qualified Contractors to construct a canopy over the fueling area for the Beaumont Municipal Transit (BMT) System located at 550 Milam Street Beaumont, Texas 77701. A MANDATORY Pre-Bid meeting will be held on Wednesday, August 26, 2026, at 9:00 A.M. (CT) , at the Beaumont Municipal Transit Facility located at 550 Milam Street, Beaumont, TX 77701.

More opportunities from Texas → City Of Beaumont

Same awarding agency

NAICS: 237310
New
SLED
Street Rehabilitation Citywide - Phase VII
Solicitation # PW1027-03
The City of Beaumont is soliciting bids for the Street Rehabilitation Citywide - Phase VII project, identified as solicitation PW1027-03. The scope of work involves comprehensive roadway improvements, including milling existing asphalt, stabilizing the roadway base, performing full depth repairs, and resurfacing pavement with Hot Mix Asphalt Concrete. Additional requirements include the removal of concrete curb and gutter and the application of cement treatment. The project must be completed within 365 calendar days from the date specified in the Notice to Proceed. All work must adhere to the Americans with Disabilities Act Accessibility Guidelines and specific technical standards for prefabricated pavement markings. Bids must be submitted electronically via the IONWAVE platform by October 22, 2026, at 2:00 PM CT. A mandatory virtual pre-bid conference is scheduled for October 15, 2026. Required submission documents include a bid bond with a visible seal, a corporate resolution, a conflict of interest questionnaire, and an insurance requirement affidavit. The contract will be awarded to the lowest responsive and responsible bidder or the bidder providing the best value, with considerations for financial standing, past experience, and local bidder preference. The awarded contractor must provide performance and payment bonds within 14 days of the agreement and ensure a supervisor is present on-site at all times during construction.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 18 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS