Construction of a Raymark Stormwater Pumping Station

Closed
W912WJ22B0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in 20 days

General Info

Contract Value

$19,766,155.05

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Stratford, CT, 06614, USA

Set-Aside

NONE

Award Issued Date

Documents

15

W912WJ22B0007 - Solicitation, Offer, and Award (Construction)

PDF, High priority: read this firstifb
High

Amendment+W912WJ22B0007-0001.pdf

PDF

Amendment+W912WJ22B0007-0002.pdf

PDF

Amendment_W912WJ22B0007_0003.pdf

PDF

Amendment+W912WJ22B0007-0004.pdf

PDF

Amendment+W912WJ22B0007-0005.pdf

PDF

Amendment_W912WJ22B0007_0005_Raymark+PS+00D-003+Rev-1.pdf

PDF

Amendment_W912WJ22B0007_0005_Raymark+PS+01A-602+Rev-1.pdf

PDF

Amendment_W912WJ22B0007_0005_Raymark+Stormwater+Lift+Station+Specification.pdf

PDF

Amendment+W912WJ22B0007-0006.pdf

PDF

Bid+Abstract.pdf

PDF

Drawings.pdf

PDF

Site+Visit+Meetup+Location.pdf

PDF

Specs.pdf

PDF

W912WJ22C0007.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

14 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice title changed.

Notice updated

The notice description changed.

Notice updated

The notice title changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The point of contact changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Feb 24, 2022 to Mar 3, 2022.

Deadline changed

Response deadline changed from Mar 3, 2022 to Mar 11, 2022.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New England
Contacts1 person available
OfficeCONCORD, MA, 01742-2751, USA
Office AddressCONCORD, MA, 01742-2751, USA

Full Description

Show more
*** SOLICITAITON IS ISSUED ***

More opportunities from Department Of Defense → W2SD Endist New England

Same awarding agency

NAICS: 237310
New
Federal
Guardrail Installation, Mansfield Hollow Lake, Mansfield, CT
Solicitation # W912WJ27QA003
Solicitation W912WJ27QA003 is a Request for Quotations issued by the Department of Defense, W2SD Endist New England, for the installation of approximately 250 linear feet of new pressure-treated wooden guardrail at the Mansfield Hollow Dam in Mansfield Center, Connecticut. This firm-fixed-price contract is a total small business set-aside under NAICS code 237310, with an estimated construction magnitude between $25,000 and $100,000. The project requires the contractor to provide all equipment, materials, and labor, ensuring posts are set three feet below and three feet above finished grade, spaced every six feet on center and secured with carriage bolts. The period of performance is 210 calendar days from the notice to proceed, with work hours restricted to Monday through Friday, 7:00 AM to 3:30 PM. To be considered responsive, vendors must maintain an active registration in SAM.gov and submit a comprehensive quote including technical documentation, price, and past performance from the last three years. Key safety and compliance requirements include adherence to USACE EM 385-1-1 standards and the submission of an Accident Prevention Plan, Activity Hazard Analysis, and Site Safety and Health Officer designation letter within 21 days of the notice to proceed. Fieldwork cannot commence until all submittals are approved. Award will be based on the most advantageous offer considering price, technical capability, and past performance. Payments will be processed electronically through the Wide Area WorkFlow system.
Highway, Street, and Bridge Construction

POSTED

about 12 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
Federal
Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT
Solicitation # W912WJ26RA008
Solicitation W912WJ26RA008 is a firm-fixed-price construction project for the Phase A2 Chilled Water Plant Replacement and Site Utility Upgrades at the VA Medical Center in West Haven, Connecticut. The scope includes the demolition of the existing chilled water plant and the construction of a new multi-story facility featuring chillers, cooling towers, pumps, and a new fuel tank farm. Site utility upgrades involve replacing fire protection and domestic water mains, creating utility main loops for chilled water, steam, condensate, and fire protection, and installing redundant electrical feeders and new water storage tanks. The project must adhere to DVA Physical Security Resiliency Design Requirements and is expected to achieve USGBC LEED Silver certification. Because the work occurs within an active medical campus, strict coordination is required to minimize operational impacts. The estimated contract value ranges from 75 million to 150 million dollars. Award is based on a best-value tradeoff process, with non-price factors—Past Performance, Management Approach, and Small Business Participation—combined being significantly more important than price. A minimum small business participation rate of 10 percent is mandatory for eligibility. Due to campus integration needs, the government has issued several justifications for other than full and open competition to require brand-name products from Johnson Controls, Siemens, and Assa Abloy, as well as specific SCADA programming services from AMAZ Consulting. Proposals must be submitted electronically via the PIEE solicitation module in both native and PDF formats.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 17 days
View Details
NAICS: 237990
New
Federal
Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine
Solicitation # W912WJ27BA003
Solicitation W912WJ27BA003 is a sealed bid invitation for the maintenance and advance maintenance dredging of the Isle au Haut Thoroughfare Federal Navigation Project in Maine. This 100 percent small business set-aside project, under NAICS 237990, has an estimated value between 1 million and 3 million dollars. The scope of work involves the mechanical removal of approximately 3,355 cubic yards of highly compacted coarse sand, gravel, cobbles, and small boulders to achieve a depth of -7 feet Mean Lower Low Water, with an allowable overdepth bringing the maximum depth to -8 feet. All dredged material must be transported and disposed of at the Flake Island Ocean Disposal Site, located approximately 0.9 nautical miles northwest of the project site. Performance is restricted to an environmental window between September 15, 2026, and March 1, 2027, to protect benthic resources and federally managed species. The contractor is required to maintain a production rate of at least 4,000 cubic yards every 30 calendar days, operating 24 hours a day and seven days a week. Award will be based on the lowest price for the total estimated amount of mobilization and dredging line items, with a 10 percent price evaluation preference for HUBZone small business concerns. Key requirements include the provision of performance and payment bonds, the submission of a Contractor Quality Control Plan, and the hosting of a partnering session within 45 days of award. All proposals must be submitted electronically via the Procurement Integrity Enterprise Environment portal.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 21 days
View Details
NAICS: 238290
New
Federal
Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT
Solicitation # W912WJ27QA001
The U.S. Army Corps of Engineers New England District is soliciting quotes for the installation and commissioning of a new power system for the Dike B Operator unit at Mansfield Hollow Dam in Mansfield Center, Connecticut. This fixed-price project, estimated between $25,000 and $100,000, is a total set-aside for small businesses under NAICS code 238290. The scope of work includes site preparation, the construction of a reinforced concrete generator pad, installation of secure perimeter fencing, and the procurement and installation of a standalone propane-powered generator and fuel storage tank. Additionally, the contractor must perform final electrical integration into the existing sluice gate operator unit and control panel, including the installation of a 100 Amp NEMA 3R pedestal-mount panelboard and a 480V to 120/240V step-down transformer. The period of performance is 300 days from the Notice to Proceed, with work restricted to weekdays from 7:00 AM to 3:30 PM. All work must comply with the National Electric Code and the USACE Safety and Health Requirements Manual EM 385-1-1. To be considered responsive, vendors must have an active SAM.gov registration and submit a completed solicitation survey detailing their experience, certifications, and past performance from the last three years. Quotes are due by November 5, 2026, and will be evaluated based on technical capability, price, and past performance. Payment will be processed electronically through the Wide Area WorkFlow system.
Other Building Equipment Contractors

POSTED

5 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS