Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on October 29, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction of Long Term Equipment Maintenance Complex at Powidz Air Base,Poland

Closed
W912GB19X0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 14 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 14 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 14 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 14 hours ago

DEADLINE

in 10 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

AE

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

Response deadline changed from Nov 8, 2018 to Nov 26, 2018. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Fest NAU1 Europe
Contacts2 people available
OfficeAPO, AE, 09096, USA
Office AddressAPO, AE, 09096, USA
Contacts
Whittni C. HiscoxContract Specialist
David NealContracting Officer

Full Description

Show more
Sources Sought Announcement for Construction of Long Term Equipment Maintenance Complex at Powidz Air Base, Poland for USACE Europe District This announcement seeks information from industry which will be used for preliminary planning purposes. No proposals are being requested or accepted with this announcement. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. NO SOLICITATION, SPECIFICATIONS OR DRAWINGS ARE AVAILABLE AT THIS TIME. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS ANNOUNCEMENT OR ANY FOLLOW-UP INFORMATION REQUESTS. 1. AGENCY: United States Army Corps of Engineers (USACE) Europe District (NAU) 2. NAICS: 236220 Commercial and Institutional Building Construction 3. PLACE OF PERFORMANCE: Powidz Air Base, Poland 4. ANTICIPATED PROJECT TITLE: Long Term Equipment Maintenance Complex at Powidz Air Base, Poland 5. ACQUISITION INFORMATION: NAU anticipates soliciting and awarding a single Stand Along (C-Type) contract for the construction of the facilities at Long Term Equipment Maintenance Complex project at Powidz Air Base, Poland. Estimated magnitude of construction is between $100,000,000 and $250,000,000. The period of performance is anticipated to be 920 calendar days from issuance of the Notice to Proceed. This acquisition will be an unrestricted action under full and open competitive conditions, open to all eligible firms located in the North American Treaty Organization (NATO) member nations. Small and Small Disadvantaged Business requirements are waived for this project due to its location Outside of the Contiguous United States (OCONUS), which means that this procurement and administration of the ensuing contract will use United States (US) procurement laws and regulation, and all eligible firms located in the NATO nations are invited to take part in this requirement. 6. PROJECT DESCRIPTION: The work includes the construction of the facilities located at the Long Term Equipment Storage Maintenance Complex (LTESM-C) on Powidz Air Base, Poland. The site is approximately 39-hectares and is located in a remote area. It is anticipated that a man-camp may be required for this project along with a dedicated concrete batch plant. The complex consists of the following facilities and associated site work. - Vehicle Maintenance Building approximately 8,600 square meters - Five Controlled Humidity Warehouses with each warehouse approximately 12,000 square meters in size for a total of 60,000 square meters. - Two Vehicle Maintenance Storage Buildings totaling approximately 1,650 square meters - Washrack / Brake Test Facility Building approximately 1350 square meters - Small Administration Facility approximately 650 square meters along with an inspection canopy and Guard Shack. - Operational Storage Facility Building approximately 5,750 square meters - Vehicle Assembly Point Pavement approximately 20,550 square meters - Install Information Systems/Security System and Electronic Security System - Construct Site Concrete Paving approximately 179,250 square meters - POL Facility and Hazardous Material Storage Building - Supply a Wheel Mounted Crane Construct Vehicle Maintenance Building. The building is a two-story cast-in-place concrete frame structure with reinforced concrete masonry unit back-up walls and exterior insulated meal wall panels. It includes, but is not limited to: - Paint and blast booths with paint storage, mixing and ancillary equipment, drying/preparation areas, toilets and telecom room - 20 repair bays (10 per side) with two 30 ton overhead bridge cranes, exterior overhead canopies - Welding/machine shop, communications repair shop, battery storage room, and administration area - Breakroom, latrines, first aid and wellness rooms, corridors, stairways and an elevator - Upper level open and walled administration offices, conference room, training room and latrine - Metal roof deck, insulation and standing seam metal roofing - Exterior CMU with insulated metal panels - HVAC systems, compressed air system, lubrication system, domestic water, sanitary sewer, indirect waste and storm drains - Transformers, power distribution equipment, power supplies, lockable generator connections - Building Management System - Area Distribution Node, and telecommunications systems Construct five Controlled Humidity Warehouses. The warehouses are single story, high bay, pre-engineered structures with concrete floor slabs. Each warehouse includes, but is not limited to: - Vehicle storage, mechanical, electrical, telecomm and fire protection rooms, an office, unisex latrine and janitor's room - Metal roof deck, insulation and standing seam metal roofing with pre-engineered metal roof purlins - Masonry veneer base walls with insulated metal wall panels above attached to the pre-engineered structure - Translucent roof skylights with security bars to provide natural daylighting - Motorized overhead coiling doors at the ends of each bay - HVAC system, dehumidification system, roof intake vents, domestic water, sanitary sewer, trench drains, storm drains - Transformers, power distribution equipment, power supplies, lockable generator connections - Building Management System - Single telecommunications room and remote telecom cabinets Construct two Vehicle Maintenance Storage Buildings. The buildings are three sided, pre-engineered enclosures with concrete floor slabs. They include, but are not limited to: - Metal roof deck with standing seam metal roofing - Ground-face masonry base with uninsulated metal panels - Secure cage provided in half of a bay of one of the structures to store gas cylinders - Transformers, power distribution equipment, power supplies, lockable generator connections Construct Washrack/Brake Test Facility Building. The building is a single story, high bay pre-engineered structure with a concrete floor slab. It includes, but is not limited to: - Heated building with three bays - Two bays with elevated wash pads and one bay with wash pad on grade - Enclosed heated bay with a concrete pad at grade for brake testing - Two sided covered bay with concrete pad at grade for vehicle scales - Metal roof deck, insulation and standing seam metal roofing with pre-engineered metal roof purlins - Masonry veneer base walls with insulated metal wall panels above attached to the pre-engineered structure - Translucent roof skylights to provide natural daylighting - HVAC systems, compressed air system, domestic water, and storm drains - Transformers, power distribution equipment, power supplies, lockable generator connections - Building Management System - Single telecommunications room Construct Administration Facility, Canopy, Guard Shack. The Administration Facility is a single story masonry building with a concrete floor slab. The structures include, but are not limited to: - Masonry bearing walls with a masonry veneer base and insulated metal panels - Metal roof deck, insulation and standing seam metal roofing steel roof trusses - Accommodations for ten personnel, staff latrine and small kitchenette, a process waiting area with a controlled exit vestibule - HVAC system, domestic water, sanitary sewer, indirect waste and storm drains - Transformers, power distribution equipment, power supplies, lockable generator connections - Building Management System - Single telecommunications room - Pre-fabricated guard booth - Search canopy that covers guard booth and entry lanes Construct Operational Storage Facility Building. The building is a combination of pre-engineered and conventional steel-framed construction with a concrete floor slab. It includes, but is not limited to: - Administration portion of the building constructed at grade level with steel frame and concrete masonry infill walls - Warehouse functions of the building constructed on a raised slab above grade with a pre-engineered metal building - Break room, latrines, a medical storage function and a cage storage area - Metal roof deck, insulation and standing seam metal roofing steel roof trusses - HVAC system, compressed air system, lubrication oil supplies, domestic water, sanitary sewer, indirect waste and storm drains - Transformers, power distribution equipment, power supplies, lockable generator connections - Building Management System - Telecommunications rooms Construct security features associated with the Fire Pump House Building. It includes, but is not limited to: - Telecommunication cabinet, fiber optic and copper cabling - Security controller with enclosure and tamper switch, telecom enclosure tamper switch, access control card reader and associated door hardware, security cameras, security network switch - Building interior and exterior signage - Fire Pump House Building will be installed as part of a separate contract Construct Site Features. Including but not limited to; - Site grading - Utilities - Security fence - Lighting - Concrete pavement Install information system, security system and electronic security system. Work includes, but is not limited to: - Sensors, operating consoles and other head-end equipment. - Assessment cameras, monitors, audio/video devices (monitors, sound subsystems, video projectors/recorders. Construct POL Facility and Hazardous Material Storage Buildings. Supply wheel mounted crane equipment. 7. SOURCES SOUGHT: The purpose of this source sought is to gain knowledge of interest, capabilities and qualifications of various members of industry. The Government must ensure there is adequate competition among potential pool of responsible contractors. Prior Government contract work is not required for submitting a response under this sources sought announcement. However, the contract award will be limited to firms within the NATO member nations. This requirement is applicable to the prime contractor, all subcontractors, joint venture partners, and all other individuals that will be working on this project. 8. RESPONSES: The Capabilities Statement for this sources sought is not intended to be a Request for Proposal nor Invitation for Bid, nor does it restrict the Government to an ultimate acquisition approach. It is to request statements regarding the company's ability to demonstrate existing-or-developed expertise and experience in relation to the areas specified herein. Any commercial brochures or currently existing marketing material may also be submitted with the Capabilities Statement. Submission of Capabilities statement is not a prerequisite to any potential future offerings, but participation will assist the Corps of Engineers in tailoring requirements to be consistent with industry capabilities. This synopsis is for information and planning purposes only and is neither to be construed as a commitment by the Government nor will the Government pay for information solicited. Respondents will not be notified of the results of the evaluation. 9. SUBMISSIONS: Capabilities Statement should include: - Firm's Name, address(es), English speaking point of contact, phone number and e-mail address - Firm's interest in proposing on the solicitation when it is issued - Firm's Cage Code and DUNS number. - Evidence of Bonding Capability: o For U.S. Firms provide the following: ? Name of Surety ? Capacity for single contract expressed in dollars o For all other NATO member country firms provide the following: ? List of current Bank Letters of Assurance (BLA) and Bank Letters of Guarantee (BLG) and the amounts for each ? Intended Bank that will be used to obtain the BLA and BLG for this contract - Firm's capability to perform contract(s) of this magnitude and complexity within the past 10 years to include the following information: o Brief description of projects (no more than five projects) o Customer name o Timeliness of performance o Customer satisfaction o Dollar value of the project - Firm's Joint Venture information or Teaming Arrangements they anticipate using for this project, if applicable o Include Cage Code or System for Award Management (SAM) information/registration, if available Please limit responses to 20 pages. 10. RESPONSES DUE: All interested contractors should submit responses via email by 1400 hours Central European Summer Time on 26 November 2018. Submit responses and information to Contract Specialist Whittni Hiscox at whittni.c.hiscox@usace.army.mil. No hard copies will be accepted. 11. QUESTIONS: Questions regarding this Sources Sought Announcement may be directed to Contract Specialist Whittni Hiscox at whittni.c.hiscox@usace.army.mil. Important Note: * Prior to award of a contract, Contractors are required to be registered in the System for Award Management (SAM) and that all information required is current and up to date. NOTE: SAM has a new requirement that firms must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated or renewed. Please allow enough time to fulfill this new requirement in SAM to avoid any delays with the entity registration or record maintenance. https://www.sam.gov/portal/SAM/#1 ****SOURCES SOUGHT FOR MARKET RESEARCH PURPOSES ONLY****

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS