This Solicitation opportunity from California was posted on August 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Construction On State Highway In Orange County On Route 133 From 0.5 Mile South Of Irvine Boulevard Overcrossing To Route 133/241 Separation And On Route 241 From 0.4 Mile South Of Portola Parkway Overcrossing To 0.4 Mile South Of Windy Ridge Toll Plaza
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Contract 12-OT7304, issued by the California Department of Transportation, is a unit price construction project estimated at 24.5 million dollars. The scope involves extensive highway improvements in Orange County on Route 133, from 0.5 mile south of Irvine Boulevard Overcrossing to the Route 133/241 separation, and on Route 241, from 0.4 mile south of Portola Parkway Overcrossing to 0.4 mile south of Windy Ridge Toll Plaza. Key work includes replacing drainage systems, upgrading electrical and lighting systems, installing rubberized hot mix asphalt, and replacing guardrails with concrete barriers and crash cushions. The project also incorporates the installation of Transportation Management System elements, rumble strips, and comprehensive traffic control systems. Environmental requirements include a Stormwater Pollution Prevention Plan, invasive species control, and paleontological resources mitigation. The contractor must provide a designated on-site safety representative with specific professional certifications and at least three years of heavy construction safety experience. Compliance with Buy America requirements is mandatory for iron, steel, and manufactured products permanently incorporated into the project. Bidders must submit electronically sealed bids via the Bid Express website by 2:00 p.m. on September 24, 2026, including a security deposit of at least 10 percent of the bid. Deliverables include a Lead Compliance Plan, a Level 2 Critical Path Method Schedule, and various inspection reports. Acceptance of the work is based on visual inspections and parameter measurements as specified in the approved installation and test plan.
General Info
Place of Performance
Sacramento, CA, 95814, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from California Department of Transportation
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
