Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Construction On State Highway In San Bernardino County In And Near Barstow From Stoddard Wells Road To Route 15/247 Separation

Active
20261030033State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation 08-1L0904 is a California Department of Transportation project for construction on State Highway 247 in San Bernardino County, extending from Stoddard Wells Road to the Route 15/247 Separation in and near Barstow. The estimated project cost is 9,600,000 dollars, with work to be completed within 130 working days. The scope of work primarily involves cold planing asphalt concrete pavement, applying rubberized hot mix asphalt, replacing asphalt concrete surfacing, and installing 12-inch rumble strips. Additional requirements include minor concrete work for curbs and sidewalks, temporary traffic control, water pollution control, earthwork, and the installation of electrical systems for signals, lighting, traffic monitoring stations, and flashing beacons. The contractor is also responsible for utility coordination and the specialized management, packaging, and labeling of treated wood waste and asbestos materials in accordance with California Code of Regulations. Bids must be submitted on a unit price basis by December 3, 2026. A critical evaluation factor is the Small Business Enterprise participation goal; bids that fail to meet this requirement are considered nonresponsive. Certified SBEs or non-small businesses subcontracting at least 25 percent of the work to SBEs may be eligible for a bid comparison preference of 5 percent or 50,000 dollars, whichever is applicable. The project mandates adherence to 2025 Standard Specifications and Standard Plans, with specific inspection and acceptance protocols for system performance and data link testing conducted through the District 8 TMC. Additionally, the contractor must designate an on-site safety representative and ensure all labor complies with prevailing wage rates determined by the California Department of Industrial Relations.

General Info

Place of Performance

Barstow, CA, USA

Set-Aside

NONE

Documents

2
PDF, High priority: read this first99 pages · ifb
High
PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Bid #08-1L0904: The project involves cold planing asphalt concrete pavement, applying rubberized hot mix asphalt (gap graded), replacing asphalt concrete surfacing, and performing minor concrete work. This includes construction on State Highway 247 in San Bernardino County, specifically in and near Barstow, extending from Stoddard Wells Road to the Route 15/247 Separation. The scope also covers temporary traffic control, water pollution control, environmental stewardship, earthwork, erosion control, surfacings and pavements, concrete curbs and sidewalks, traffic control devices, markings, and electrical work, including signal and lighting systems, traffic monitoring station systems, and flashing beacon systems. Utility coordination and management of treated wood waste and asbestos materials in bridges are also part of the project.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation activities including land surveying, site clearing, shoring, and subgrade roadbed work. Additional requirements encompass environmental services like storm water pollution prevention, traffic control, landscaping, and the supply of materials such as precast concrete, ready mix, and steel casing. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system. The deadline for responses is November 18, 2025, and project plans are available for review at Kiewit's Santa Fe Springs office.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 15 days
View Details

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Mendocino County At Leggett From 0.1 Mile North Of Route 1 To The Humboldt County Line Near Piercy
Solicitation # 01-0J9904
Solicitation 01-0J9904 is a construction project issued by the California Department of Transportation for work on State Highway Route 101 in Mendocino County. The project scope covers the segment from 0.1 mile north of Route 1 at Leggett to the Humboldt County line near Piercy, specifically between Post Mile T91.3 and T106.8. Key work activities include the placement of hot mix asphalt, replacement of signs, and improvements to drainage systems. The estimated cost for the project is 24 million dollars, with a required bid range of 140 to 200 working days. Bids are due by December 10, 2026, and job site activities must commence within 55 days of contract approval by the Attorney General. The contract is governed by 2025 Standard Specifications and Standard Plans, with specific modifications detailed in the Special Provisions. Compliance is required for Buy America/Build America standards, prevailing wage rates as determined by the California Department of Industrial Relations, and DVBE and small business submittal requirements. Contractors must designate an on-site safety representative and adhere to strict environmental and quality standards, including a seasonal restriction that limits work within drainage channels to the period between June 15 and October 15. Technical requirements include rigorous concrete quality assurance testing and specific marking and identification standards for precast barriers, steel segments, and laminated wood box posts.
Highway, Street, and Bridge Construction

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS