Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Consulting Services for Fire Hall No.1 Kitchen and Bunker Gear Room Expansion

Active
2026-92International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Brantford has issued Request for Proposals 2026-92 to secure professional consulting services for the expansion and renovation of the kitchen and bunker gear room at Fire Hall No. 1, located at 60 Clarence Street. The scope of work encompasses conceptual design, design development, tendering services, and construction contract administration. Key physical requirements include expanding the kitchen into the exterior wall patio space, relocating the bunker room into the current laundry and air compressor room, and relocating exterior utilities such as the gas meter. The project must adhere to the quality and aesthetic standards of previous interior renovations and comply with all applicable Ontario and Canadian federal laws. Proposals are due by October 14, 2026, and must be submitted electronically via the City's bidding system. The selection process involves a multi-stage evaluation where proponents must achieve a minimum benchmark of 70 points to proceed to pricing, with the final award based on the lowest cost per point. While a construction budget of 810,000 dollars is established, this does not include the consulting fees, which are to be quoted as lump sums for design and contract administration. The project is managed by the City's Facilities Capital Development department and is governed by the City's Purchasing Policy Bylaw 83-2025. Supporting technical data for the project includes a 2019 Building Condition Assessment and a 2009 Designated Substances Survey identifying the presence of benzene, lead, mercury, and silica.

General Info

Consulting services for Fire Hall No. 1 kitchen and bunker room expansion.

Agency

City of BrantfordView Agency

NAICS

541310 - Architectural ServicesView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(4)

City of Brantford Fire Station #1 Building Condition Assessment (Project 2018-76)

PDFspecifications

RFP 2026-92: Consultant for Fire Hall No.1 Kitchen and Bunker Gear Room Renovations

PDFrfp

Fire Station #1 Designated Substances Survey (File 05080054.00)

PDFspecifications

As-Built Drawings - 33.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCity of Brantford
ContactsNo contacts available
OfficeCAN
Organization / Agency
City of Brantford
View Agency Profile
Office AddressCAN
ContactsNo contact information available

Full Description

Show more
This Request for Proposals (the “RFP”) is an invitation by City of Brantford (the “City”) to prospective proponents to submit proposals for consulting services for Fire Hall No.1 Kitchen and Bunker Renovation, as further described in Section A of the RFP Particulars (Appendix B) (the “Deliverables”).

Similar Contracts

Same NAICS industry code

NAICS: 541310
New
SLED
BID 2027-002: Highway Garage Roof Replacement Project
Solicitation # 2027-002
The Town of Bethel is soliciting proposals under RFQ/RFP 2027-002 for professional architectural and engineering services to manage the complete roof replacement of the Town Highway Garage located at 1 Sympaug Park Rd. The project involves two prefabricated building areas totaling approximately 24,790 square feet. The selected firm will be responsible for a comprehensive scope of work including initial assessment, concept development, design of construction documents, bidding support, and construction administration. Key requirements include ensuring the final roofing solution meets applicable codes and provides a minimum 20-year warranty, with an optional add alternate for a 30-year warranty. The project is managed by STV Construction Inc. as the Owner's Project Manager, and the design firm must coordinate structural, MEP, and environmental consultant services. Proposals must be submitted in sealed hard copy and electronic formats by October 16, 2026, at 9:45 AM, following a mandatory site visit held on September 28, 2026. Evaluation is based on a scoring matrix focusing on technical approach, project scheduling, firm experience, and relevant project references. The fee proposal must be broken down by study, design, bid, and construction phases, with the construction phase assuming 26 weeks of oversight. Awarding authority rests with the Board of Selectmen upon the recommendation of the Procurement Committee. Selected consultants must comply with Connecticut prevailing wage rates, provide specific insurance certifications, and adhere to non-discrimination and non-collusion standards.
DAS Procurement

POSTED

about 16 hours ago

DEADLINE

in 23 days
View Details

More opportunities from City of Brantford

Same awarding agency

NAICS: 238120
New
International
Wayne Gretzky Sports Centre Dive Platform & Board Repairs
Solicitation # 2026-97
The City of Brantford has issued Request for Quotations 2026-97 for the repair and rehabilitation of dive platforms and boards at the Wayne Gretzky Sports Centre, located at 254 North Park Street, Brantford, Ontario. The scope of work includes the cleaning, preparation, and recoating of corroded steel base assemblies and auxiliary structures, as well as the removal and replacement of existing railings with new 304 stainless steel systems designed according to the Ontario Building Code. Key deliverables include P.Eng stamped shop drawings for new railings, railing testing at typical locations, and a manufacturer's signed material warranty. The project is expected to last three to four months, with mobilization anticipated for October or November 2026 and substantial completion targeted for January 2027. Quotations must be submitted via the Bids and Tenders electronic system by October 8, 2026. The evaluation process consists of three stages: a review of mandatory submission requirements, an assessment of mandatory technical requirements, and a final pricing evaluation, with the award granted to the top-ranked compliant respondent. Successful contractors must provide performance and labour and material payment bonds each valued at 50% of the contract price plus taxes, maintain commercial general liability insurance, and provide a valid WSIB clearance certificate. Technical specifications require adherence to designs by Gravity Engineering and the use of fire-resistant polyester film floor panels. Additionally, contractors must manage potential hazardous materials as identified in previous designated substances and asbestos reassessment reports.
Structural Steel and Precast Concrete Contractors

POSTED

6 days ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS