Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CONNECTOR, PLUG, ELECTRI

Closed
SPE7M5-26-T-476UFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334417
New
DIBBS
INSERT, ELECTRICAL CONN
Solicitation # SPE7M5-27-T-1014
Solicitation SPE7M5-27-T-1014 is a fixed-price request for quotations issued by the DLA Weapons Support Active Devices Division for the procurement of five electrical connector receptacles, NSN 5935-01-122-4204, part number M28748/3-C50F1A. The items must comply with basic specifications MIL-DTL-28748/3F Revision F and reference specification MIL-DTL-28748E Revision E. This is a qualified item subject to the Qualified Products List (QPL) for Federal Stock Class 5935. Delivery is required within 20 days after order, with the original required delivery date set for October 9, 2026. The shipping terms are FOB Origin, with the final destination for inspection and acceptance being NIWC Atlantic in Hanahan, South Carolina. The contract mandates strict adherence to quality and environmental standards, including a prohibition on Class I ozone-depleting substances and the intentional addition of mercury. Packaging and preservation must follow MIL-DTL-55330 and MIL-STD-2073-1E, while marking must comply with MIL-STD-129. Quality assurance will be conducted at the destination per FAR 52.246-2, utilizing sampling methods from MIL-STD-1916 or ASQ H1331. Offerors must submit quotes via the DIBBS system and comply with the Buy American Act, the Berry Amendment, and NIST SP 800-171 cybersecurity requirements. Invoicing and payment will be processed electronically through the Wide Area WorkFlow system.
DLA WEAPONS SUPPORT ACTIVE DEVICES DIVISION

POSTED

about 20 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

This solicitation, issued by DLA Land and Maritime Active Devices Division, is a total small business set-aside under NAICS 334417 for the procurement of 12 electrical plug connectors, identified as critical application items with NSN 5935004934870. The items must adhere to basic specification MS27265A NOT 6 (Revision A), reference specification MIL-DTL-38159D(1), and quality assurance provision QAP 16236 SQAP004934870. Delivery is required within 288 days, with a need ship date of March 9, 2027, and a final required delivery date of April 22, 2028. The shipment is designated as FOB Origin and will be delivered to DLA Distribution San Joaquin in Tracy, California. A critical requirement of this contract is the First Article Testing (FAT), requiring the contractor to test 7 units and provide written notice to the Contracting Officer and Quality Assurance Representative at least 14 days prior to shipment. Inspection and acceptance will occur at the point of origin, utilizing sampling methods consistent with MIL-STD-1916 or ASQ H1331. Packaging must comply with RP001 and MIL-STD-129, with non-hazardous materials following ASTM D3951 and hazardous materials following TQ requirement IP025. The use of Class I ozone-depleting substances is prohibited. All quotes must be submitted via the DIBBS system, and payment will be processed through the Wide Area Workflow (WAWF) system.

General Info

DLA small business set-aside for 12 electrical plug connectors delivered by April 2028.

NAICS

334417 - Electronic Connector Manufacturing

Place of Performance

REC WHSE 57, TRACY, CA, 95304-5000, USA

Set-Aside

SBA

Documents

1

SPE7M5-26-T-476U Request for Quotations

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → ACTIVE DEVICES DIVISION
Contacts1 person available
OfficeUSA
Office AddressUSA

Full Description

Show more
CONNECTOR,PLUG,ELECTRICAL
CONNECTOR,PLUG,ELECTRICAL
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RQ002: CONFIGURATION CHANGE MANAGEMENT ENGINEERING CHANGE PROPOSAL
REQUEST FOR VARIANCE (DEVIATION OR WAIVER)
RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
RQ017: PHYSICAL IDENTIFICATION/BARE ITEM MARKING
SAMPLING:
THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ
H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE
SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,
STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR
AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF
VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED
ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE
SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER
MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR
PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT
SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT
UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.
FULL AND OPEN COMPETITION APPLIES.
BID SET AVAILABLE.
SPECIFICATION
CONTRACTOR FIRST ARTICLE TESTING REQUIRED
SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)
THE USE OF ANY CLASS I OZONE-DEPLETING SUBSTANCE
(ODS) IN THE DESIGN, MANUFACTURING, TESTING,
CLEANING, OR ANY OTHER PROCESS FOR THIS ITEM
UNDER ANY MILITARY OR FEDERAL SPECIFICATION,
STANDARD OR DRAWING REFERENCED IN THIS ITEM
DESCRIPTION IS "PROHIBITED" UNLESS THE SEPARATE
WRITTEN APPROVAL OF THE CONTRACTING OFFICER IS
OBTAINED. THIS PROHIBITION SUPERSEDES ALL
SPECIFICATION REQUIREMENTS BUT DOES NOT
ALLEVIATE ANY PRODUCT PERFORMANCE REQUIREMENTS.
THIS DOES NOT APPLY TO COMMERCIAL ITEMS, AS
DEFINED IN "FAR 11.001" OR TO PART-NUMBERED
ONLY ITEMS.
SPE7M5-26-T-476U
SECTION B
CRITICAL APPLICATION ITEM
TDP Rev A Gen 1 IAW BASIC SPEC NR MS27265A NOT 6 REVISION NR A DTD 02/06/2023 PART PIECE NUMBER: MS27265-6
TDP Rev A Gen 1 IAW REFERENCE QAP 16236 SQAP004934870 REVISION NR DTD 03/07/2013 PART PIECE NUMBER:
TDP Rev A Gen 1 IAW REFERENCE SPEC NR MIL-DTL-38159D(1) REVISION NR D DTD 03/05/2021 PART PIECE NUMBER: MS27265-6
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0001 7018271044 0001 EA 12.000
NSN/MATERIAL:5935004934870
DELIVERY (IN DAYS):0288
DELIVER FOB: ORIGIN
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
PREP FOR DELIVERY:
PKGING DATA-QUP:001
IF MATERIAL IS CONSIDERED HAZARDOUS IAW FED-STD-313,
PACKAGE IN ACCORDANCE WITH TQ REQUIREMENT IP025.
IF THE MATERIAL IS NOT CONSIDERED HAZARDOUS, IN ACCORDANCE WITH
FED-STD-313, THE MATERIAL SHALL BE COMMERCIALLY PACKAGED IN ACCORDANCE
WITH ASTM D3951.
All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951. Mark and label all packaging and packing in accordance with MIL-STD-129. The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order. PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
PARCEL POST ADDRESS:
W62G2T
W1A8 DLA DIST SAN JOAQUIN
SPE7M5-26-T-476U
SECTION B
PR: 7018271044 PRLI: 0001 CONT’D
25600 S CHRISMAN RD
REC WHSE 57
TRACY CA 95304-5000
US
FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE
C20 AND CONTRACT
FREIGHT SHIPPING ADDRESS:
W62G2T
W1A8 DLA DIST SAN JOAQUIN
25600 S CHRISMAN ROAD
25600 S CHRISMAN RD REC WHSE 57
TRACY CA 95304-5000
US
Need Ship Date:03/09/2027 Original Required Delivery Date:04/22/2028
CONTRACTOR FIRST ARTICLE TEST THE NUMBER OF UNITS SHOWN SIGNIFIES THE
TEST REQUIREMENT. SEE FAR CLAUSE 52.209-3 CITED IN SECTION A OF THIS
SOLICITATION FOR THE ACTUAL QUANTITY REQUIRED.
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0002 0000000000 EA 1.000
NSN/MATERIAL:0001S00000053
DELIVERY (IN DAYS):0060
THIS LINE ITEM SIGNIFIES THE FIRST ARTICLE TEST REQUIREMENT (FAT). SEE
CLAUSES FOR INFORMATION CONCERNING THE FAT REQUIREMENT. OFFERS THAT DO
NOT CITE A PRICE FOR THIS LINE ITEM SHALL BE EVALUATED UNDER THE
ASSUMPTION THAT THERE IS NO SEPARATE CHARGE FOR THE FAT. IN THE EVENT
THE FAT REQUIREMENT IS WAIVED, NO AWARD WILL BE MADE FOR THIS LINE ITEM.
THE NUMBER OF UNITS SHOWN APPEARS AS “1 EA”. THIS QUANTITY SIGNIFIES
THE TEST REQUIREMENT. OFFERORS WILL FIND THE ACTUAL QUANTITY REQUIRED
BY THE GOVERNMENT FOR THE FAT LINE ITEM PER FAR 52.209-3 OR 52.209-4 IN
SECTION A OF THIS SOLICITATION.
DELIVER FOB: ORIGIN
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
SPE7M5-26-T-476U
SECTION B
PR: PRLI: CONT’D
Need Ship Date:00/00/0000 Original Required Delivery Date:00/00/0000
SPE7M5-26-T-476U NSN/Part Number: 5935-00-493-4870 Quantity: 12 EA Purchase Request: 7018271044QTY: 12 Delivery: 288 days ADO

More opportunities from Department Of Defense → ACTIVE DEVICES DIVISION

Same awarding agency

NAICS: 335313
New
DIBBS
CIRCUIT BREAKER
Solicitation # SPE7M5-26-T-284C
Solicitation SPE7M5-26-T-284C is a small business set-aside request for quotations issued by the DLA Land and Maritime Active Devices Division for the procurement of 81 circuit breakers, part number MS24510-B-10 (NSN 5925012225033). The items are designated as critical application hardware and must be manufactured by a qualified QPL source, as commercial equivalents are strictly prohibited. Technical compliance is required according to SAE AS24510, AS58091, and TDP Rev A Gen 1, as well as the DLA Master List of Technical and Quality Requirements. Delivery is required within 166 days after order, with a need ship date of December 23, 2026, and a final required delivery date of January 27, 2027. The destination for inspection and acceptance is DLA Distribution Warner Robins in Georgia. Packaging must adhere to MIL-STD-129 and DLA requirement RP001, with specific prohibitions against the intentional addition of mercury and the use of Class I ozone-depleting chemicals. The contract incorporates various FAR and DFARS clauses, including requirements for CMMC Level 2 certification, NIST SP 800-171 assessment, and compliance with the Buy American Act and Berry Amendment. All quotes must be submitted via the DIBBS system. Payment and receiving reports are to be processed electronically through the Wide Area WorkFlow system.
Switchgear and Switchboard Apparatus Manufacturing

POSTED

about 20 hours ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS