AI Contract Overview
The contract entails the integration of generator control systems with the plant’s SCADA infrastructure at four wastewater pumping stations operated by the City of Bowie, Maryland. This includes the implementation of automated start sequences, real-time remote monitoring capabilities, and alarm systems designed to ensure uninterrupted power supply during outages. All work must align with the strict safety and operational standards outlined in NFPA 110, governing emergency and standby power systems. The scope demands thorough commissioning to verify that all components function seamlessly under load and emergency conditions, with full documentation provided to demonstrate compliance and system reliability. Subcontractors are invited to respond by August 26, 2026, under a NAICS code classified for engineering services. The project is tied to the replacement of aging generators and the modernization of backup power infrastructure critical to maintaining wastewater operations. Performance will occur at the four specified pumping stations, though exact physical locations are not detailed in the posting. The contract does not specify set-aside status or point of contact, and all submissions must meet technical and regulatory requirements without deviation from the mandated standards.
General Info
Agency
NAICS
Place of Performance
MD, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Maryland → City of Bowie, MD
Same awarding agency