Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Generator Replacement at Four Wastewater Pumping Stations

Active
O27_004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Bowie, Maryland is soliciting bids for the replacement of generators at four wastewater pumping stations, with the solicitation numbered O27_004 and posted on July 23, 2026. Interested contractors must submit their proposals by the deadline of August 26, 2026, and are expected to be qualified and experienced in handling such infrastructure upgrades. The work will take place at the designated wastewater pumping stations located within the city of Bowie, Maryland, and requires the procurement, installation, and commissioning of new generator systems to ensure reliable backup power for critical wastewater operations. All bids must be submitted through the official portal linked in the solicitation, and questions or communications regarding the project should be directed to Jackie Tayman, the primary point of contact, via email at jtayman@cityofbowie.org. While the NAICS code and set-aside details are not specified, the project is open to qualified general contractors with demonstrated expertise in electrical and mechanical systems for utility infrastructure. The City of Bowie expects contractors to comply with all applicable standards, timelines, and safety protocols to ensure seamless integration of the new generators without disruption to wastewater services.

General Info

Bowie, MD seeks qualified contractors to replace generators at four wastewater pumping stations by August 26, 2026.

Agency

Maryland → City of Bowie, MDView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

MD, USA

Set-Aside

NONE

Documents

(16)

13 Payment Bond_PS Generators.pdf

PDF

Contractor Responsibility Form

PDFcontractor-responsibility-form

11 Bid Bond.pdf

PDF

4 Bid Certification Form_PS Generators.pdf

PDF

12 Performance Bond_PS Generators.pdf

PDF

1 Cover Page_PS Generators.pdf

PDF

16 AGREEMENT W BONDS_PS Generators.pdf

PDF

15 Existing Generator Pictures.pdf

PDF

5 EOE Form.pdf

PDF

9 EMR Form.pdf

PDF

10 Contractor W9 Form.pdf

PDF

8 Reference List.pdf

PDF

City of Bowie Affidavit of Public Contracting Eligibility

PDFaffidavit

3 SuppCond.pdf

PDF

14 FY27 Gen Replacement SOW.pdf

PDF

2 ITB-GC W BONDS_PS Generators.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMaryland → City of Bowie, MD
Contacts1 person available
OfficeUSA
Organization / Agency
Maryland → City of Bowie, MD
View Agency Profile
Office AddressUSA
Contacts
Jackie Tayman

Full Description

Show more
The City of Bowie, Maryland requests bids from qualified and experienced contractors for the replacement of generators at four (4) wastewater pumping stations.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry Redevelopment Project will transform the entry and exit drives along 19th Ave W, along with the demolished footprint of the Downie Building C-14, into a modernized infrastructure that integrates enhanced parking, green space, and stormwater management systems. Existing pavement in poor condition will be milled and overlaid, while stormwater infrastructure will be replaced and expanded to divert runoff from combined sewer lines to dedicated storm lines, with water quality treatment implemented on qualifying pavement surfaces. The C-14 slab will be removed to make way for new parking spaces and native pollinator habitat, supplemented by an irrigation system and updated landscaping in the entry drive median. Electric vehicle charging stations will be installed to support sustainable transportation. The project will also introduce protected two-way bike lanes connecting the terminal to the West Wall bike path, improve pedestrian access to the intersection at 21st Ave W and W Emerson Pl, and enhance connectivity to the King County Metro bus stop. New lighting will be installed throughout the parking area and pedestrian paths, and comprehensive wayfinding systems will guide pedestrian and bicycle traffic. All upgrades are designed to improve safety, accessibility, and environmental performance, with a focus on integrating sustainable practices into the terminal’s urban fabric.
Waterfront Project Management

POSTED

about 9 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Portwide Unit Price 2026The contract encompasses a broad range of asphalt paving, striping, and related infrastructure work to be performed across multiple sites within the Seattle-Tacoma International Airport, Maritime Properties, and surrounding areas. Scope of work includes new asphalt paving and patching, overlays with fabric, crack sealing, seal coating, profile grinding, removal and disposal of grinding spoils, stripping and repainting of pavement markings, surface preparation for new striping, saw cutting and coring of non-hazardous concrete and asphalt, installation of concrete wheel stops, curb repair and replacement, lifting and leveling of concrete sidewalks, and upgrades to road drainage systems which may require permitting. All tasks are to be executed to ensure safety, compliance, and long-term durability of airport and maritime roadways and adjacent surfaces. The contract is solicited under the title Asphalt Paving & Striping Portwide Unit Price 2026 with NAICS code 237310 and is managed by the Port of Seattle through its Port Construction Services division. Primary point of contact is Heather Bowden, with Lesley Miles serving as Project Manager; inquiries can be directed via their provided email addresses and phone numbers. The forecast was posted on July 23, 2026, and while no solicitation number is assigned, details are accessible through the Port’s official portal. Work is expected to occur at various Port-wide locations, requiring coordination across multiple properties and adherence to site-specific conditions and regulations.
Port Construction Services

POSTED

about 9 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
FY26-DDOT-MOA-Local Sidewalk RestorationThe District of Columbia Department of Transportation is forecasting a contract for fiscal year 2026 to address widespread sidewalk repair and replacement across the city, alongside targeted upgrades to wheelchair ramps and bus stops to enhance overall accessibility. This initiative aims to bring public walkways and transit infrastructure into full compliance with accessibility standards, ensuring safe and equitable access for all residents, particularly those with mobility challenges. The project will involve comprehensive assessment, removal of deteriorated surfaces, installation of new ADA-compliant materials, and modifications to existing ramps and bus stop structures to meet current federal and local guidelines. The contract will be managed under the agency name Transportation DDOT and is part of an ongoing citywide effort to improve urban infrastructure. While specific details such as solicitation number, NAICS code, and point of contact are not yet provided, the forecast indicates that eligible contractors will be invited to bid once formal solicitation processes are launched. Performance will be concentrated throughout the District of Columbia, with work expected to occur on public right-of-way areas including sidewalks, curb cuts, and adjacent transit amenities. The project reflects a commitment to inclusive design and proactive maintenance of transportation infrastructure to support community mobility and safety.
Transportation (DDOT)

POSTED

about 9 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
FY26-DDOT-IPMA-CM Services for Preventative Maintenance & Emergency RepairsThe contract solicits construction management-agent services under a multiple-award indefinite-delivery/indefinite-quantity (IDIQ) mechanism to support preventative maintenance and emergency repairs of highway structures within the District of Columbia. The scope includes comprehensive project oversight, scheduling, budgeting, quality control, coordination with stakeholders, and mobilization of resources to ensure timely and cost-effective execution of tasks issued through individual task orders. Services will be delivered across the District’s highway infrastructure network with an emphasis on preserving structural integrity and preventing deterioration through proactive interventions and rapid response to emergent conditions. This procurement is forecasted under the Fiscal Year 2026 timeline by the District Department of Transportation and will be administered through a competitive process to select qualified firms capable of managing complex civil infrastructure projects. While no specific set-aside or NAICS code is provided, the work will require expertise in transportation construction management, adherence to safety and regulatory standards, and demonstrated experience in municipal highway systems. Performance will be conducted entirely within the District of Columbia, and the contract aims to ensure continuity of service, operational efficiency, and long-term asset preservation for critical transportation infrastructure under DDOT’s jurisdiction.
Transportation (DDOT)

POSTED

about 9 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
FY26-DDOT-IPMA-Rehabilitation of Theodore Roosevelt BridgeThe contract entails the comprehensive rehabilitation of the Theodore Roosevelt Bridge, specifically Bridge No. 1200 over the Potomac River, with a focus on enhancing multi-modal safety for pedestrians and bicyclists. The project includes the installation of approximately 300,000 square feet of new bridge deck, along with deck overlays for approach structures and full roadway replacement. Sidewalks will be widened to provide a 10-foot clear passage and equipped with 42-inch-tall pedestrian railings and matching traffic barriers to ensure safety. New roadway lighting will be installed to harmonize with the existing light intensity, and all sign structures will be relocated with updated signage. The steel superstructure will be repainted and necessary repairs will be conducted on the substructure to extend the bridge’s service life and structural integrity. This project is forecasted under the District of Columbia Department of Transportation’s FY26 initiative and is part of broader efforts to modernize critical transportation infrastructure within the city. While specific funding details and solicitation timelines are not yet available, the work is positioned as a major capital improvement aligned with public safety and accessibility goals. All components—from deck replacement to lighting and railing upgrades—are designed to meet current safety standards and improve the overall experience for all users of the bridge, including those traveling by foot, bicycle, or vehicle. The location of performance and agency oversight remain under the District of Columbia’s jurisdiction, with the project expected to proceed through standard procurement processes following the forecast release date of July 23, 2026.
Transportation (DDOT)

POSTED

about 9 hours ago

DEADLINE

N/A
View Details

More opportunities from Maryland → City of Bowie, MD

Same awarding agency

NAICS: 484220
New
SLED
Heavy Hauling and Site LogisticsThe contract involves the heavy hauling and logistics required to transport large generators to four wastewater pumping station sites, with full responsibility for oversize load permitting, detailed route planning, and precise on-site maneuvering to ensure safe and efficient delivery. The work requires specialized equipment and experienced personnel capable of handling oversized cargo while complying with all state and local regulations, navigating complex routes, and coordinating with authorities to secure necessary permits and escort services. Each generator transport must be executed with precision to avoid damage to infrastructure, public safety hazards, or delays in project timelines. The project is under the City of Bowie, Maryland, and is classified under NAICS code 484220 for special trucking services, indicating a focus on non-standard freight transportation. Bids must be submitted by August 26, 2026, and the contract is structured as a subcontract, meaning the successful bidder will operate under a primary contractor or program. The place of performance is tied to the four pumping station sites, though specific locations are not listed, and the work demands a high level of coordination, risk management, and logistical expertise. All activities must align with municipal requirements and ensure minimal disruption to local communities during transport and installation operations.
Specialized Freight (except Used Goods) Trucking, Local

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
New
SLED
Fuel System Installation (Diesel/Natural Gas)The contract pertains to the installation of a comprehensive fuel system for diesel and natural gas-powered generators at four wastewater pumping stations in Bowie, Maryland. Scope of work includes the procurement and installation of fuel lines, storage tanks, shutoff valves, and fuel delivery systems designed to ensure uninterrupted and reliable generator operation under all conditions. All components must meet stringent safety and environmental standards, with particular emphasis on spill containment compliance to prevent hazardous material release and protect surrounding ecosystems. The system must be engineered for durability, ease of maintenance, and seamless integration with existing infrastructure at the pumping stations. The contract is classified as a subcontract under NAICS code 238220, indicating specialized construction services related to plumbing, heating, and air-conditioning. The solicitation was posted on July 23, 2026, with a mandatory response deadline of August 26, 2026, and the award will be managed by the City of Bowie under the Maryland state jurisdiction. While specific performance location details are not provided, the work is confined to the four designated wastewater pumping stations. Contractors must be prepared to navigate local regulations, demonstrate experience in hazardous fuel system installations, and ensure full compliance with environmental protection mandates throughout the project lifecycle.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 238210
New
SLED
Electrical Installation of GeneratorsThe contract involves the electrical integration of backup generators at four wastewater pumping stations operated by the City of Bowie, MD, requiring the installation and connection of generators to existing switchgear, transfer switches, load banks, and control systems to ensure reliable power during outages. All work must comply with applicable electrical codes and operational standards to maintain the continuity of wastewater services, with the scope focusing on seamless system integration rather than standalone generator deployment. The project demands specialized expertise in industrial electrical systems and coordination with existing infrastructure to avoid disruptions to critical municipal operations. Bidding is open under a subcontract classification with a NAICS code of 238210, indicating electrical contracting services, and responses are due by August 26, 2026. The opportunity was posted on July 23, 2026, and all work must be performed at the designated pumping station locations. While specific performance location details are not provided, the effort is centralized within the City of Bowie’s wastewater system infrastructure. Interested parties must possess the technical capability to handle complex electrical interfaces and demonstrate experience with similar municipal utility projects to meet the functional and safety requirements of the installation.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details