Control Tower Chamber Equipment Painting, Colebrook River Lake, Colebrook, CT

Closed
W912WJ26QA081Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238320
New
SLED
Paint All Exterior and Common Area Doors, Buildings 4166, 4167, 4168 & 3673
Solicitation # N400857606105
Solicitation N400857606105 is for a project at MCAS Cherry Point, North Carolina, focused on the cleaning, preparation, priming, and painting of approximately 800 exterior and common-area doors, frames, vents, and louvers across Buildings 4166, 4167, 4168, 4169, and 3673. Additionally, the scope includes refinishing approximately 2,350 linear feet of handrails at Building 3673. The contractor must provide all labor, materials, and supervision to ensure a uniform, durable finish, with specific requirements to paint common area and storage doors on both sides and residential doors on the corridor-facing side only. All work must be completed within 180 calendar days after the award. The contract will be awarded based on the lowest price, and the successful offeror will be issued a task order under MACC Contract N4008525D. Proposals are due by September 18, 2026. Bonding requirements vary by proposal amount: no bonds for amounts up to 35,000 dollars, a payment bond for amounts between 35,001 and 150,000 dollars, and a bid, payment, and performance bond for amounts exceeding 150,000 dollars. The project is subject to the Davis-Bacon Act and Buy American requirements, with a minimum wage of 13.65 dollars per hour for covered workers. A Quality Control Manager is required to oversee the project and ensure all surfaces are free of defects such as rust, peeling, or runs.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The contract entails the preparation and painting of specific steel equipment within the gate chamber at Colebrook River Lake in Colebrook, Connecticut, including bonnets, hydraulic piping, hydraulic cylinders, plumbing associated with two sump pumps, conduit pressure balancing pipe, vertical float well pipe, air shafts, and a spiral staircase, with the entire staircase—both inside and outside the chamber—required to be painted. Existing paint on these items is partially failed with peeling, blistering, and rust present, necessitating full surface preparation and recoating in accordance with Specification Section 09 97 02 PAINTING and other applicable standards such as EM 385-1-1, OSHA regulations, and EPA guidelines. The work is a Firm Fixed-Price, single-job project with a performance period of 120 calendar days starting from the Notice to Proceed, and all deliverables must be completed at the site with final acceptance occurring on-site. Packaging and handling of paints must comply with strict requirements: containers must be sealed, hold no more than five gallons, use removable covers, be stored under cover and away from ignition sources, and be labeled with detailed information including manufacturer batch number, color, specification number, and date of manufacture, while ensuring product integrity for one year post-manufacture. No bar-coding or MIL-STD packaging standards are required. The procurement is a total small business set-aside under NAICS code 238320 with a $19 million size standard, and all offerors must maintain an active SAM.gov registration to be considered; failure to do so results in rejection. Proposals must be submitted via email by April 27, 2026, at 5:00 p.m. Eastern Time, and must include a fully completed solicitation survey, signed amendments, and proof of technical capability. Evaluation is based first on technical acceptability, including personnel qualifications and subcontractor arrangements, followed by price reasonableness and past performance among small businesses; award is made to the most advantageous offer, not necessarily the lowest-priced. Payment will be managed electronically through WAWF using invoice-receiving report combinations, and no specific remittance or accounting data is provided. Contractors must comply with extensive security protocols: all personnel require DoD/Army security training within 30 days, annual SAR training, mandatory vehicle and personal searches upon site entry, and adherence to FPCON, HPCON, and RAM measures that the Government may impose unilaterally.

General Info

USACE seeks bids for painting mechanical equipment at Colebrook River Lake; small business set-aside.

Agency

Department Of Defense → W2SD Endist New EnglandView Agency

NAICS

238320 - Painting and Wall Covering ContractorsView NAICS

Place of Performance

MA

Set-Aside

SBA

Documents

(5)

SOW for Paint Gate Chamber Equipment at Colebrook River Lake Dam

PDFsow

Amendment W912WJ26QA081-0002 Adding FAR Clause 52.222-90

PDFamendment

Solicitation+W912WJ26QA081.pdf

PDF

Solicitation+Survey+26QA081.pdf

PDF

Amendment W912WJ26QA081-0001 to Solicitation W912WJ26QA081

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New England
Contacts1 person available
OfficeCONCORD, MA, 01742-2751, USA
Organization / Agency
Department Of Defense → W2SD Endist New England
View Agency Profile
Office AddressCONCORD, MA, 01742-2751, USA

Full Description

Show more

THE WORK CONSISTS OF: The work of this project consists of preparation and painting various mechanical equipment items and related items in the gate chamber at Colebrook River Lake in Colebrook, Connecticut. Items to be prepared and painted are steel and include the bonnets, hydraulic piping, hydraulic cylinders, plumbing associated with the two sump pumps (not the sump pumps), the conduit pressure balancing pipe, the vertical float well pipe, air shafts, and one spiral staircase. The entire spiral staircase shall be painted including the portion outside of the gate chamber. Items not specifically included in the list above shall not be prepared and painted, The existing paint coatings on these items have partially failed, and there are areas of peeling, blistering, and rust.


The magnitude of construction is between $100,000 and $250,000.  For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil)


This procurement is set-aside for small business vendors. The applicable NAICS code is 238320 with a Small Business Size Standard of $19 Million.


ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.

More opportunities from Department Of Defense → W2SD Endist New England

Same awarding agency

NAICS: 321992
New
Federal
Pre-Engineered Pavilion Supply, Northfield Brook Lake, Thomaston, CT
Solicitation # W912WJ26QA160
Solicitation W912WJ26QA160, issued by the USACE New England District, is a total small business set-aside under NAICS code 321992 for the supply, delivery, and unloading of one pre-engineered 30' x 44' open air pavilion at the Northfield Brook Lake Recreation Area in Thomaston, Connecticut. The scope of work is limited to the procurement and delivery of the kit and does not include installation. Technical specifications require the use of APA/EWA certified glued laminated southern pine for columns and beams, pressure-treated fascia, and #1 grade nominal 2" x 8" tongue-and-groove southern yellow pine for the roof deck. All materials must be tarped and secured upon offloading, and the structure must adhere to specific wind and snow load engineering requirements. The contract is awarded on a best-value basis, considering price, technical capability, and past performance. To be considered responsive, vendors must maintain an active registration in SAM.gov and complete a mandatory solicitation survey. Delivery is required within 90 to 210 days of the contract award, with deliveries scheduled Monday through Friday between 7:00 AM and 3:30 PM. The agreement is FOB Destination, and the contractor is responsible for all transportation costs. Compliance with USACE Safety and Occupational Health Requirements (EM 385-1-1) and DoD item unique identification standards (MIL-STD-130 and MIL-STD-129) is mandatory. Invoicing and payment processing must be conducted through the Wide Area WorkFlow (WAWF) system.
Prefabricated Wood Building Manufacturing

POSTED

2 days ago

DEADLINE

in 2 days
View Details
NAICS: 237120
New
Federal
Fuel Tank Removal and Replacement, Colebrook River Lake, Colebrook, CT
Solicitation # W912WJ26QA164
The U.S. Army Corps of Engineers New England District is soliciting quotes for the removal and replacement of fuel tanks at the Colebrook River Lake gatehouse in Colebrook, Connecticut. The project requires a contractor to provide all labor, materials, and equipment to remove and dispose of one 600 gallon fuel tank, a catch basin containing approximately 300 gallons of fuel, a 10 gallon day tank, a fuel transfer pump, and associated supply lines. These will be replaced with two 275 gallon insulated double walled fuel tanks, a new 10 gallon day tank, grounding systems, a fuel transfer pump, vent pipes, fill whistle, crossover manifold kit, fill caps, fuel level gauges, a tie down kit, and new fuel supply return lines. The work must be completed within a 120 day period of performance and adhere to all local, state, and federal laws. This procurement is a total small business set aside under NAICS code 237120, with a construction magnitude of less than 25,000 dollars. The contract is a firm fixed price agreement. To be considered responsive, all vendors must maintain an active registration in SAM.gov at the time of submission. The solicitation process includes a requirement for a detailed solicitation survey regarding vendor qualifications and a comprehensive safety and accident prevention plan. The deadline for responses is September 15, 2026, at 5:00 PM Eastern.
Oil and Gas Pipeline and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 3 days
View Details
NAICS: 238160
New
Federal
Shelter Roof Replacement, Buffumville Lake, Charlton, MA
Solicitation # W912WJ26QA161
Solicitation W912WJ26QA161 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers New England District for the replacement of a picnic shelter roof at Buffumville Lake Park in Charlton, Massachusetts. The scope of work requires the contractor to furnish all labor, equipment, and materials to remove existing asphalt shingles, nails, and tar paper and install a new structural standing seam metal roof with no exposed fasteners. The new roof must meet UL 580 Wind uplift Class 90, ASCE 7-10 loading requirements with a minimum live load rating of 52 pounds per square foot, and ASTM E2140 water penetration standards. The estimated value of the construction is between 25,000 and 100,000 dollars, with a performance period of 220 calendar days. On-site work is scheduled to begin no earlier than September 14, 2026, with standard working hours from 7:00 AM to 3:30 PM, Monday through Friday. This procurement is set aside for small business vendors under NAICS code 238160. To be considered responsive, all vendors must maintain an active registration in SAM.gov and submit a completed solicitation survey, signed amendments, and a full bid schedule. Award decisions will be based on the most advantageous quote, considering price, technical capability, and past performance within the last three years. Required deliverables include an Accident Prevention Plan, Activity Hazard Analysis, and a Site Safety and Health Officer designation letter. Payment will be processed electronically through the Wide Area WorkFlow system. While a performance bond is only mandatory for quotes of 150,000 dollars or more, the contractor must provide qualified quality control personnel and adhere to specific safety and hazardous materials guidelines as outlined in the statement of work and subsequent amendments.
Roofing Contractors

POSTED

2 days ago

DEADLINE

in 2 days
View Details
NAICS: 236220
New
Federal
Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT
Solicitation # W912WJ26RA008
Solicitation W912WJ26RA008 is a firm fixed price construction project for the replacement of the chilled water plant and site utility upgrades at the VA Medical Center in West Haven, Connecticut. The scope includes the demolition of the existing plant and the construction of a new multi-story facility featuring chillers, cooling towers, pumps, and associated mechanical and electrical equipment. Additional requirements include the construction of a new fuel tank farm, installation of redundant electrical feeders, and the replacement of domestic and fire protection water mains. The project also involves creating utility main loops for chilled water, steam, condensate, and water supply. The facility must be constructed to meet USGBC LEED Silver certification and comply with the DVA Physical Security Resiliency Design Requirements. The project is estimated between 40 million and 115 million dollars and is being managed by the U.S. Army Corps of Engineers, New England District. Due to the active nature of the medical center, the contractor must minimize operational impacts and manage constrained laydown areas. The award will be based on a best-value tradeoff process, prioritizing past performance, management approach, and small business participation over price. To be eligible, offerors must commit to at least 10 percent small business participation. Several brand-name justifications are in place to ensure compatibility with existing campus systems, specifically requiring Johnson Controls or Siemens for HVAC/BAS, JCI for fire alarms and electronic security, Assa Abloy for lock cores, and AMAZ Consulting for SCADA programming.
Commercial and Institutional Building Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238320
Federal
Interior Painting, Hopkinton-Everett Lakes, Hopkinton and Weare, NH
Solicitation # W912WJ26QA162
The U.S. Army Corps of Engineers New England District is soliciting firm-fixed-price quotations for interior painting services at four facilities in New Hampshire: the Hopkinton Lake Project Office, Hopkinton Dam gatehouse, Elm Brook Park Ranger Station in Hopkinton, and the Everett Lake Office in Weare. The scope of work involves painting approximately 8,309 square feet of interior surfaces, including walls, ceilings, floors, and door frames. Specific requirements include painting 14 door frames, 3 cased openings, and 9 man doors, as well as applying two coats of eggshell acrylic latex to the walls of the Elm Brook Park Ranger Station. The project requires a full dusting and cleanup of all surfaces and a final walk-through with the Technical Point of Contact. The estimated magnitude of construction is between $25,000 and $100,000, with a performance period of 90 calendar days from the date of award. This procurement is a total set-aside for small business vendors under NAICS code 238320. To be considered responsive, all vendors must maintain an active registration in SAM.gov and provide a completed solicitation survey covering technical capabilities and past performance. Award will be granted to the responsible vendor whose quotation is most advantageous to the government, based on a three-step evaluation of responsiveness, comparative technical and past performance analysis, and price reasonableness. Contractors must comply with EM-385-1-1 2024 safety standards and provide Safety Data Sheets prior to ordering materials. Invoicing is processed electronically through the Wide Area WorkFlow system. Quotations are due by September 14, 2026.
Painting and Wall Covering Contractors

POSTED

12 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS