Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on February 16, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Convert Circuit 6, Selected Portions from OH to UG, Sheppard Air Force Base, Wichita County, TX

Awarded
W912BV-16-R-0058Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Installation of Buried Fiber Optic Cable Stanton North Substation to Hoskins Substation
Solicitation # 26085
The Nebraska Public Power District is soliciting bids for Request for Bid No. 26085 to install approximately six miles of underground fiber optic cable between the Stanton North and Hoskins Substations in northeast Nebraska. The scope of work encompasses all labor, materials, and supervision required for staking, material coordination, property owner contacts, and right-of-way restoration. Specifically, the contractor will install 48-strand buried fiber optic cable provided by the contractor and 48-strand all-dielectric fiber provided by the District. The project must adhere to RUS Form 515a and IEEE Standard 1333-1994 for guided boring. Work is expected to be awarded by November 25, 2026, with a final completion deadline of April 15, 2027. Bids are due by November 13, 2026, and must include a completed pricing spreadsheet and current all-inclusive equipment and labor rates. Evaluation factors for the award include quoted price, conformance with specifications, past schedule performance, and the bidder's financial responsibility and experience. To qualify, bidders must certify the completion of at least three similar buried fiber optic installation projects within the last five years. Payment terms specify that 95 percent of the price is paid within 30 days of acceptable performance, with 5 percent retained until final acceptance. An optional pre-bid teleconference is scheduled for November 5, 2026, to review contract specifications.
Nebraska Public Power District

POSTED

about 11 hours ago

DEADLINE

in 15 days
NAICS: 237130
New
Federal
B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback
Solicitation # W9126G27R1CSY
The U.S. Army Corps of Engineers, Fort Worth District, is conducting market research via a Sources Sought notice for the B-21 Utilities and Site Improvements project at Dyess Air Force Base, Texas. This initiative aims to establish high-reliability primary electrical power distribution and dedicated fiber-optic communications infrastructure to support the bed-down of the B-21 weapons system. The scope includes the installation of single-mode fiber optic cables, telephone system expansion, power cabling in concrete encased ducts, pole-mounted conductors, and associated transformers and switchgear. The project also encompasses site improvements such as earthwork, grading, and erosion control. The estimated Construction Cost Limitation is $28,550,000, though an $8 million electric substation and specific end-user network equipment are expressly excluded from this contract. The government is currently evaluating whether to utilize a traditional Federal Acquisition Regulation based contract or an Other Transaction Agreement under 10 U.S.C. section 2808a. If a collaborative procurement framework is chosen, a two-phase selection process will be implemented, focusing first on technical capability, past performance, and collaborative execution history, followed by an evaluation of final technical and price proposals. The project must adhere to strict Department of Defense standards, including UFC 1-200-01 for general building requirements, UFC 4-010-01 for antiterrorism, and UFC 4-010-06 for cybersecurity of facility-related control systems. The anticipated period of performance is 690 calendar days from the notice to proceed, with a required beneficial occupancy date of March 8, 2030.
W076 Endist Ft Worth

POSTED

about 12 hours ago

DEADLINE

in 14 days
NAICS: 237130
New
SLED
De Palma Road Electrical Conduit Installation Project
Solicitation # TLARC-819
The County of Riverside is soliciting bids for the De Palma Road Electrical Conduit Installation Project (Project No. D4-0072) located in the Community of Horsethief Canyon, California. The project involves the excavation and backfill of approximately 1,000 feet of trenching, the installation of 685 feet of 1.5-inch and 350 feet of 3-inch electrical conduit and handholes, and the installation of 6-inch Type D concrete curb per County Standard No. 204. All work must adhere to Southern California Edison plans and be completed within 30 working days from the commencement date specified in the County's written order. The estimated project cost is 209,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals by December 2, 2026, at 1:30 P.M. Pacific Time, including a non-collusion declaration and a bid guarantee of 10 percent of the total bid. The awarded contractor must provide performance and payment bonds, comply with California State Labor Code prevailing wage requirements, and adhere to specific affirmative action plans based on contract value and employee count. Payments will be made monthly, with the Owner paying 90 percent of the value of labor and materials incorporated into the work and 75 percent of materials stored on site, subject to certification by the Architect.
COUNTY OF RIVERSIDE

POSTED

about 17 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Installation Of Street Lighting On Raymond Avenue From Maple Street To North City Limits
Solicitation # 2026-IFB-CIV-0549
The City of Pasadena Department of Public Works is soliciting bids under solicitation number 2026-IFB-CIV-0549 for the installation of a new street lighting system on Raymond Avenue, extending from Maple Street to the North City Limits. The project requires the contractor to furnish and install concrete street lighting standards, foundations, LED luminaires and fixtures, conduits, conductors, pull boxes, and other appurtenant work. Key technical deliverables include 29W or 50W LED replacements, galvanized steel conduits, and 6 foot Type S Scroll Arms. The contractor must provide all necessary labor, materials, and equipment, ensuring compliance with the ADA, CBC, Title 24, and PROWAG accessibility guidelines. Bids must be submitted electronically via the City of Pasadena eProcurement Portal by 2:00 pm on November 17, 2026. Qualified bidders must provide evidence of experience with two similar governmental projects and submit several mandatory documents, including Form AA-1, Form AA-2 for labor exceeding 25,000 dollars, a non-collusion declaration, and a DHS contract disclosure. A bid security of five percent of the total bid price is required, and the successful awardee must provide material and faithful performance bonds for 100 percent of the base bid. Work must commence within 15 calendar days of the Notice to Proceed and be completed within 20 working days. Invoicing is handled through the city's Vendor Invoice Portal, with payments issued on Tuesdays and Thursdays.
City of Pasadena Department of Public Works

POSTED

about 17 hours ago

DEADLINE

in 19 days
NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

1 day ago

DEADLINE

in about 1 month

General Info

Contract Value

$11,517,352.82

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

Sheppard Air Force Base, Wichita Falls, Wichita County, TX, WICHITA FALLS, TX, USA

Set-Aside

SBA

Award Issued Date

Documents

7

Amendment 0001 - Circuit 6 OH to UG, Sheppard SFB, TX

PDF, High priority: read this firstamendment
High

Amendment 0002 - RFP W912BV-16-R-0058 (Convert Circuit 6)

PDF, High priority: read this firstamendment
High

Amendment 0002 - W912BV-16-R-0058

PDF, High priority: read this firstamendment
High

RFP W912BV-16-R-0058: Convert Circuit 6 from OH to UG SAFB

PDF, High priority: read this firstrfp
High

RFP W912BV-16-R-0058: Convert Electrical Circuit 6 from OH to UG

PDF, High priority: read this firstrfp
High

1st Street Ramp Project - Phase 1 Sign-in Sheet

PDF, Low priorityindustry-day
Low

Visitors to Sheppard AFB via EAL - Site Visit Instructions

PDF, Low priorityspecial-notice
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Sources Sought

Type Changed

Sources Sought → Presolicitation

Notice updated

Set-aside removed.

Notice updated

Set-aside added: Total Small Business Set-Aside (FAR 19.5). The notice description changed.

Notice updated

Set-aside removed. The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W076 Endist Tulsa
Contacts1 person available
OfficeTULSA, OK, 74137-4290, USA
Office AddressTULSA, OK, 74137-4290, USA
Contacts
Leonard E. BuhrowContract Specialist

Full Description

Show more
Total Small Business Set Aside Convert Circuit 6, Selected Portions, from OH to UG Sheppard Air Force Base, Wichita Falls, TEXAS WORK TYPE: DESIGN-BUILD / CONSTRUCTION Provide all site investigations, workplans, site surveys, studies and design analysis, design drawings and specifications, construction documents, shop and manufacturing drawings, materials, labor, equipment, supervision, testing, submittals, and construction to perform the requirements of this project to make the necessary repairs and rehabilitation services in accordance with the provided scope of work and contract documents. The prime contractor shall be required to coordinate with Government Representatives of the U.S. Army Corps of Engineers, Tulsa District, under the direction of the Contracting Officer (KO) and assigned representatives of the contract. Construction shall commence under the direction of the KO after the work plan(s) and associated shop drawings are completed, reviewed, and approved in writing that the workplan(s) and shop drawings have demonstrated they meet the contract requirements. The intent of the project is to replace a section of the Sheppard Air Force Base (AFB) 15kV class electrical distribution system (specifically all of Circuit 6). This work includes conversion of overhead (OH) to underground (UG) and replacement of UG electrical primary and secondary service. The finished system shall be 500 kcmil service. Provide the new UG feeder and taps before removing the existing OH and UG feeder and taps to minimize (to the maximum extent possible) the outage(s) associated with replacing Circuit 6. Construct the new UG feeder primary and secondary to include street and parking lot lighting. Demolish the existing OH and UG. Existing ground transformers will be replaced as well as main circuit breakers and switches. Work will also require provision of spare underground ducts and provision for metering. Underground road boring with steel casings is required, but pavement cutting will be considered for government approval in specific situations. The design phase shall determine the best method of accomplishing the replacement of this feeder which consists of approximately 3 miles of OH distribution and approximately 3.6 miles of UG distribution. Both the design and the construction shall be handled under the auspices of one prime contractor that shall be responsible for completing the work. It is the prime contractor's option to subcontract the design and/or construction phase as long as the design is stamped by a licensed Professional Engineer (PE) experienced in - 15kV Class Distribution System' design and the construction is accomplished by a contractor experienced in - 15kV Class Line Construction' work. The PE that stamps the design shall be the Designer of Record (DOR). The DOR shall submit his or her design experience for evaluation and shall have a minimum of 5 documented - 15kV Class Distribution System Modification' projects of similar scope (of which 3 must be designed within the last 5 years). The construction contractor shall submit its construction experience for evaluation and shall have a minimum of 5 years documented - 15kV Class Line Construction' experience of similar scope (of which 3 must be successfully completed within the last 5 years). The replacement of Circuit 6 shall be accomplished with a minimum of power outage(s). To assist in achieving that requirement, the new UG distribution must be constructed and tested to the maximum extent possible prior to demolishing the existing OH and UG distribution. All outages shall be coordinated with the Contracting Officer (KO) in advance and shall be scheduled through the Sheppard AFB Base Civil Engineer (BCE). The principal elements of the project are: 1. Perform required site visit(s) to verify work required according to the documents provided 2. Design and Workplan developments 3. Construction Management 4. Overhead Electrical Distribution Demolition 5. Underground Electrical Distribution Replacement 6. New Underground Electrical Distribution Work 7. Street Lighting 8. Electrical Transformer and Switch Work 9. Utility Trenching and Backfill 10. Electrical Utility underground and under road boring 11. Materials Hauling 12. Sod/Seed and Establishment 13. Concrete Work 14. General Site Clean-up

More opportunities from Department Of Defense → W076 Endist Tulsa

Same awarding agency

NAICS: 237990
New
Federal
Webbers Falls Excitation System Replacements
Solicitation # W912BV26RA029
Solicitation W912BV26RA029 is a Request for Proposal issued by the Department of Defense, specifically the US Army Corps of Engineers Tulsa District, for the design and installation of three excitation systems at the Webbers Falls Powerhouse in Oklahoma. The project scope includes the demolition of existing equipment and the supply of three identical full inverting potential source rectifier exciters, each featuring a rectifier assembly, a power potential transformer, and microprocessor digital controllers capable of operating in high humidity and temperatures up to 40 degrees Celsius. Key deliverables include the hardware, comprehensive O&M data packages, field test reports, spare parts, and training for maintenance personnel. The performance period is 300 calendar days from the date of the notice to proceed. This is a partial small business set-aside under NAICS code 237990. Proposals are evaluated on an acceptable or unacceptable basis across three factors: past performance (requiring experience in specific categories within the last five years), a detailed work plan and schedule, and minimum small business participation percentages, including 16 percent aggregate and 11 percent for small disadvantaged businesses. The contract requires strict adherence to electrical and safety standards such as NFPA 70 and IEEE C2, as well as military standards for shipment and storage. Additionally, the prime contractor must possess a Facility Clearance, and personnel must comply with DoD 8570.01-M training and cybersecurity requirements. Payment requests are to be processed electronically via Wide Area WorkFlow.
Other Heavy and Civil Engineering Construction

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS