Copper Express Car Wash

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Fresno

NAICS

811192 - Car WashesView NAICS

Place of Performance

North Maple and East Copper Avenues, Fresno, CA, 93730

Set-Aside

NONE

Documents

(4)

P22-02694 & P22-03569 Notice of Intent to Adopt Mitigated Negative Declaration

PDFspecial-notice

Copper Express Car Wash ISMND Environmental Checklist

PDFismnd

Summary Form for Copper Express Car Wash Project

PDFsummary-form

Notice of Completion - Copper Express Car Wash Project

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fresno
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Fresno
Office AddressN/A
Contacts
Erik YoungSupervising Planner
Kevin L. GrantEnvironmental Consultant

Interested Companies (1)

Show more
Ericsson-Grant
Encinitias, CA

Full Description

Show more
Description of Project: The applicant proposes to develop a 3,500 square foot automated car wash located near (approximately 525 ft. to the west of) the northwest corner of East Copper and North Maple Avenues (Figure 1). The project site is within the Woodward Park Community Plan and includes a General Plan Amendment (GPA) from Commercial Community (CC) to Commercial General (CG). A Rezone from CC to the CG zone district will also be required to allow an automated automobile car wash. The rezone to CG would be limited to one proposed use of an automated car wash. No other uses are proposed. Primary ingress and egress to the site will be from East Copper Avenue on the south with access available from the east via a shared access driveway with the existing commercial shopping center. The existing curb and gutter along East Copper Avenue would be removed to construct a street-type approach in accordance with Public Works standard P-76. The car wash will have a tunnel with two driveway aisles and a 16-stall vacuuming area which will be located to the east of the car wash tunnel. One driveway aisle will be 9 ft. 3 in. and the other will be 9 ft. There will also be two pay stations located on the northern portion of the site. Total proposed building area including the car wash tunnel office, bathroom and storage is 3,500 sq. ft. There will also be 2,813 sq. ft. of canopy over the vacuum area and car wash tunnel entrance. The project site will be buffered by landscaping areas on the north, south and west of the property which will serve to mitigate noise and light generated by operation of the car wash (Figure 2 and Figures 3a - 3d). A landscaping strip will also be provided to the east of the car wash tunnel. An 8-ft. masonry sound barrier wall is proposed along the north and west property lines of the project site. Several existing utility easements will remain including an 11 ft. easement on the north of the property, a 30 ft. easement on the west of the property, and a 77 ft. PG&E easement on the south of the property. The highest point on the parapet of the car wash is 21 ft. and the canopy will be a height of 15 ft. The project would produce wastewater from the car wash process. However, the project integrates a recycling and filtering system that would remove and settle solids, greases, and other material into an underground reclamation tank for recycling and reuse. The project conserves water by recycling water. The project also includes two bathrooms, each with one toilet and sink, a 300 sq. ft. office and equipment room. Existing water, sewer, storm drains, and electricity are located within East Copper Avenue to the south as well as to the west and north. A water fire suppression line is located within the proposed driveway on the east (refer to Figure 2). Construction of the project would result in site preparation activities including minor grading, paving and trenching to install utilities as well as pouring concrete, laying pavement, erecting the car wash structure and teller booths, installing landscaping and lighting, etc.

Similar Contracts

Same NAICS industry code

NAICS: 811192
New
SLED
Wash Bay Equipment
Solicitation # MODOT SE 0000000026SL
The Missouri Department of Transportation Southeast District is soliciting bids under solicitation number MODOT SE 0000000026SL for a one-time purchase to remove existing equipment and install new functional vehicle wash systems at four locations: Houston, West Plains, Willow Springs, and Van Buren. The project includes technical specifications for propane and natural gas stationary heated units, with a final completion deadline of January 31, 2027. Bids are due by October 1, 2026, and will be evaluated based on price, vendor responsibility, and compliance with all mandatory specifications and Missouri statutes. Awarded contractors must adhere to strict compliance and safety standards, including the Buy American preference via Exhibit N and the submission of MHTC worker eligibility and lawful presence affidavits. Personnel requirements include mandatory OSHA 10 construction safety training and the use of ANSI/ISEA 107 Performance Class 2 or 3 safety apparel for work within highway rights-of-way. The contractor is responsible for providing a delivery schedule two business days in advance, supplying all necessary training materials for operators and mechanics, and maintaining insurance that names the Missouri Highways and Transportation Commission and MoDOT as additional insureds. All deliverables are subject to inspection and acceptance by MoDOT.
MODOT SOUTHEAST DISTRICT

POSTED

5 days ago

DEADLINE

in 10 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS