Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Copper Water Service Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Copper Water Service Installation involves providing specialized installation services for prime contractors on Town of Waterford Utilities projects in Connecticut. The scope of work includes the installation of 1 inch and 2 inch copper tubing, main tapping, and the placement of corporate stops, curb stops, and curb boxes. Additionally, the contractor is responsible for executing water connection details for DOT roads in strict accordance with the Plastic Water Service Replacement Roadway Cross Section to ensure fully operational service lines. The opportunity was posted on October 16, 2026, with a response deadline of November 12, 2026. Classified under NAICS code 238220, this project focuses on the delivery of complete copper water service infrastructure. Interested parties can find further details through the official procurement portal for the Town of Waterford.

General Info

Copper water service installation subcontract for Town of Waterford Utilities projects in Connecticut.

Documents

This scope was carved out of 26-014.

The full solicitation package (11 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

REPLACEMENT OF EXISTING PLASTIC WATER SERVICES WITH NEW COPPER WATER SERVICES FY27 ROPE FERRY ROAD (STATE ROAD)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyConnecticut → Utilities
ContactsNo contacts available
OfficeN/A
Organization / AgencyConnecticut → Utilities
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs new copper water services for prime contractors on Town of Waterford Utilities projects. Performs installation of 1" and 2" copper tubing, main tapping, and installation of corporate stops, curb stops, and curb boxes. Executes water connection details specifically for DOT roads per the Plastic Water Service Replacement Roadway Cross Section. Delivers fully installed and operational copper water service lines.

Similar Contracts

Same NAICS industry code

NAICS: 238220
New
SLED
FY27 MEP Westborough HQ HVAC/ Electrical
Solicitation # BD-27-1042-ENVOP-FAC01-134548
Solicitation BD-27-1042-ENVOP-FAC01-134548 is issued by the Executive Office of Energy and Environmental Affairs (EOEEA) for the installation of a ductless HVAC split system and electrical upgrades at the MEP Westborough HQ located at 183 Milk St, Westborough, Massachusetts. The scope of work includes installing one dedicated 20-ampere branch circuit to the attic space, one dedicated circuit for the split system unit, and one 20-amp quad receptacle. All electrical work must adhere to the latest National Electrical Code, and the vendor is responsible for all permits, inspections, and associated fees. The vendor must also label new circuits at the electrical panel and provide test results for voltage, polarity, and grounding to EEA Facilities. The contract is set aside for the Small Business Purchasing Program (SBPP), with a strong preference for participants who meet specific Massachusetts-based size and revenue criteria. Award selection is based on best value, and non-SBPP participants will only be evaluated if no SBPP bidder meets the criteria. The estimated period of performance is from November 16, 2026, to November 24, 2026. All bids, including a response cover sheet, a fixed-price itemized quotation, and an installation schedule, must be submitted electronically via COMMBUYS by the deadline of November 3, 2026.
ENVOPS - Operations

POSTED

about 6 hours ago

DEADLINE

in 18 days
View Details
NAICS: 238220
New
SLED
FY27 MEP Westborough HQ HVAC/ Electrical
Solicitation # BD-27-1042-ENVOP-FAC01-134547
Solicitation BD-27-1042-ENVOP-FAC01-134547 is issued by the Massachusetts Executive Office of Energy and Environmental Affairs (EOEEA) for the installation of HVAC and electrical systems at the MEP Westborough HQ. The scope of work requires a qualified vendor to furnish and install one ductless HVAC split system, including the indoor air handler and outdoor condensing unit, along with specific electrical upgrades. These upgrades include a dedicated 20-amp, 120-volt branch circuit to the attic space and a dedicated circuit for the split system unit, including an electrical disconnect at the outdoor unit. All work must adhere to the National Electrical Code, applicable building codes, and manufacturer installation requirements. The vendor is responsible for obtaining all necessary permits and inspections, and must provide testing results for voltage, polarity, and grounding to EEA Facilities. The contract is set aside for the Small Business Purchasing Program (SBPP), with a strong preference for participants who meet specific Massachusetts-based size and revenue criteria. Award decisions will be based on best value, and non-SBPP participants will only be evaluated if no eligible SBPP bidder meets the criteria. The estimated period of performance begins on November 16, 2026, with a final completion deadline of November 24, 2026. Responses must be submitted electronically via COMMBUYS by November 3, 2026, and must include a response cover sheet, an itemized fixed-price bid quotation, a schedule of values, and an installation timeline. Invoices must provide a detailed accounting of authorized work acceptable to EEA Facilities.
ENVOPS - Operations

POSTED

about 6 hours ago

DEADLINE

in 18 days
View Details
NAICS: 238220
New
SLED
FY27 FACMEP Westborough HQ HVAC/Electrical
Solicitation # BD-27-1042-ENVOP-FAC01-134545
The Executive Office of Energy and Environmental Affairs is soliciting a not-to-exceed fixed-price contract for the installation of an HVAC split system and a 20-Amp quad receptacle in the attic server space at the MEP Westborough HQ located at 183 Milk St., Westborough, Massachusetts. The project requires the vendor to handle all technical installations, including shared penetration points for electrical and condensate drain lines, and to provide an itemized bid quotation and a detailed project schedule. Performance is estimated to occur between November 16, 2026, and November 24, 2026. The selected vendor is responsible for all required permits, fees, and inspections, ensuring all work complies with the National Electrical Code, manufacturer requirements, and applicable local and state building codes. Functional testing of the HVAC system and verification of the receptacle's voltage, polarity, and grounding are mandatory deliverables. Award will be based on best value, with a strong preference for participants in the Small Business Purchasing Program. To qualify for this preference, businesses must be registered in COMMBUYS, based in Massachusetts, have been in operation for at least one year, employ 50 or fewer full-time equivalent employees, and have average gross revenues of 15 million dollars or less. Non-SBPP participants will only be evaluated if no SBPP bidder meets the best value criteria. All proposals must be submitted electronically via the COMMBUYS portal by November 3, 2026, and must include a response cover sheet, a proposal based on the scope of work, and a detailed compensation structure.
ENVOPS - Operations

POSTED

about 6 hours ago

DEADLINE

in 18 days
View Details

More opportunities from Connecticut → Utilities

Same awarding agency

NAICS: 237110
New
SLED
Cross Country Sewer Easement Access Contract One -Phase 2
Solicitation # 26-013
The Cross Country Sewer Easement Access Contract One - Phase 2 is a lump sum solicitation issued by the Town of Waterford, Connecticut, Utilities department. The project focuses on improving access routes within cross-country sanitary sewer easements to ensure reliable access for the town's sewer operation, maintenance, inspection, and repair activities. The selected contractor must provide all necessary tools, materials, and labor to complete the work within 150 consecutive calendar days following the written Notice to Proceed. Failure to meet this timeline may result in liquidated damages of 1,000 dollars per consecutive calendar day of default. The contract will be awarded to the lowest responsible and responsive bidder based on the base bid and any applicable alternates. Bidders must provide comprehensive documentation, including a bid bond, bank and professional references, firm information, and certification of no conflict of interest. Compliance with Connecticut Prevailing Wage Law, OSHA regulations, and non-discrimination statutes is mandatory. Additionally, the contractor is responsible for obtaining all necessary building permits, providing temporary sanitary facilities for employees, and maintaining strict quality control, including the submission of high-resolution digital pre-construction records for engineer approval. All bids must be submitted electronically via the town's e-Procurement portal by November 12, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 27 days
View Details
NAICS: 237110
New
SLED
REPLACEMENT OF EXISTING PLASTIC WATER SERVICES WITH NEW COPPER WATER SERVICES FY27 ROPE FERRY ROAD (STATE ROAD)
Solicitation # 26-014
Solicitation 26-014, issued by the Town of Waterford Utilities department, seeks a qualified contractor for the replacement of existing plastic water services with new copper water services on Rope Ferry Road, a state road in Connecticut. The project requires the contractor to provide all necessary labor and equipment to install copper tubing, main tapping, and corporate stops in accordance with Department of Transportation standards for trenching, backfilling, and pavement repair. The contract will be awarded to the lowest responsible bidder based on a base bid and any applicable alternates. Successful bidders must be capable of mobilizing within two to three weeks of the award and must complete the project within 90 consecutive calendar days following the Notice to Proceed. This is a public works project governed by Connecticut General Statutes Section 31-53, requiring adherence to prevailing wage laws and the posting of wages in a prominent location. Contractors must provide performance and payment bonds, maintain specific insurance coverage, and submit a non-discrimination certification to the Commission on Human Rights and Opportunities. Bidders are exempt from paying sales tax on materials used for the project and should not include such taxes in their bids. Payment is processed monthly based on the work completed, with a portion held as retainage until final acceptance. Submissions must be uploaded via the OpenGov e-Procurement portal by November 12, 2026, and must include a detailed pricing proposal, bank and business references, and a bid bond.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 27 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS