Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from International Boundary And Water Commission: Us-Mexico was posted on August 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Country Club west Stoplog Rehabilitation

Closed
191BWC26B0013Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 8 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

Solicitation 191BWC26B0013 is a 100% small business set-aside for the rehabilitation of the Country Club Bridge West Stoplog Structure in El Paso, Texas. This firm fixed price contract, with an estimated magnitude between $25,000 and $100,000, requires the contractor to provide all labor, materials, and equipment to restore movement between the roadway and the stoplog structure. The scope of work includes mobilization, traffic control, removal and replacement of expansion joints, repair of deteriorated concrete, roadway restoration, and final cleanup. Performance must begin within 10 calendar days of award and be completed within 120 calendar days. Bidders must submit sealed proposals by September 10, 2026, including a completed SF 1442, Section K, IBWC Forms 245/245A and 245B for minimum qualifications, a statement of equipment via Form 116, and a detailed statement of qualifications. The project is subject to Davis-Bacon Act wage determinations and the Buy American Act. Final acceptance is contingent upon a final government inspection, the completion of all punch list items, and the receipt of a Certificate of Completion from the City of El Paso. Payments will be processed monthly through the Invoice Processing Platform based on work accomplished.

General Info

Rehabilitate Country Club Bridge in El Paso, Texas, for $25,000 to $100,000.

Contract Value

$88,445

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

El Paso, TX, 79902, USA

Set-Aside

SBA

Award Issued Date

Documents

17

191BWC22C0011 Sunland Levee Repair Construction Plans

PDF, High priority: read this firstconstruction-plans
High

Amendment 0001 to Solicitation 191BWC26B0013 Country Club West Stoplog Rehab

PDF, High priority: read this firstamendment
High

FXSA Survey Report for USIBWC Rio Grande Canalization Project Sunland Park Levee Repair

PDF, High priority: read this firstsurvey-report
High

IBWC Form 116 Statement of Equipment

PDF, High priority: read this firstsow
High

IBWC Form 245A Minimum Qualifications for Joint Venture Award

DOCX, High priority: read this firstminimum-qualifications-form
High

IBWC Form 245B Backup Information

PDF, High priority: read this first3 pages · backup-information
High

IBWC Form 245 Minimum Qualifications for Award

DOCX, High priority: read this firstminimum-qualifications
High

Solicitation 191BWC26B0013 County Club West Stoplog Rehab IFB

PDF, High priority: read this firstifb
High

Solicitation 191BWC26B0013 West Stoplog Rehabilitation Construction Plans

PDF, High priority: read this firstconstruction-plans
High

Solicitation 191BWC26B0013 West Stoplog Rehab Technical Specifications

PDF, High priority: read this firsttechnical-specifications
High

Sunland Park Levee Repair Design Documentation Report IBM15D0001

PDF, High priority: read this firstdesign-documentation-report
High

Sunland Park Levee Repair - FB02 Setting Out and Slot-in Barrier System Drawings

PDF, High priority: read this firstspecifications
High

Wage Determination TX20260293 Highway Construction El Paso County

PDF, High priority: read this firstwage-determination
High

Country Club Bridge West Stoplog Rehabilitation Existing Conditions Assessment Report

PDF, Low prioritydamage-report
Low

Country Club West Repair Recommendation by Arcadis 20250808

PDF, Low priorityrepair-recommendation
Low

IBWC Form 110 Certification of Authority for Signing Bids/Offers

PDF, Low prioritycertification-of-authority
Low

MOA for Country Club Flood Control System Construction and Maintenance

PDF, Low prioritymemorandum-of-agreement
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyInternational Boundary And Water Commission: Us-Mexico → Internat Boundary And Water Commission
Contacts2 people available
OfficeEl Paso, TX, 79902, USA

Full Description

Show more

Added Amendment I 


This is a 100% small business set-aside with a small business size standard of $45M.
An offer guarantee is not required.
Add pre-bid conference notes and sign-in log.


Added SF 1442 to attachements


The United States Section of the International Boundary and Water Commission (USIBWC) requires rehabilitation of the Country Club Bridge West Stoplog Structure located in El Paso, TX. The project includes mobilization, traffic control, removal and replacement of the existing expansion joint, repair of deteriorated concrete, roadway restoration, disposal of construction debris, and final cleanup. These repairs are necessary to restore movement between the roadway and stoplog structure, reduce continued deterioration, and maintain a safe and serviceable bridge approach.


See attachments


Standard Form 1442 will be added by amendment. 


The Contractor shall furnish all labor, material, and equipment necessary to complete Country Club West Stoplog Rehabilitation. This is a FIRM FIXED PRICE CONTRACT.The estimated magnitude of this project will be $25,000.00 to $100,000.00.


L.01 - Pre-Bid Conference and Site Visit
L.01.A. All potential bidders are requested to attend the Pre-Bid Conference/Site Visit to be held at: USIBWC AmericanDam Field Office, Conference Room, 2616 W Paisano Dr., El Paso, TX 79922 Tuesday, August 18, 2026, at 9:30 AMMDT.


L.01.B. Names of individuals who plan to attend shall be furnished before 12:00 PM MDT on Monday, August 17, 2026 byemail submission to Philip.johnson@ibwc.gov .

More opportunities from International Boundary And Water Commission: Us-Mexico → Internat Boundary And Water Commission

Same awarding agency

NAICS: 221320
New
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
Solicitation 191BWC26R0009 is a request for proposals issued by the International Boundary and Water Commission for Firm Fixed Price operations and maintenance services at the South Bay International Wastewater Treatment Plant in San Ysidro, California. The contract is structured with a base year running from June 1, 2027, to May 31, 2028, and three subsequent option years, potentially extending performance through May 31, 2031. The scope of work focuses on plant operations, SCADA management, and maintenance, with a specific emphasis on coordinating the facility's expansion from 25 MGD to 50 MGD. Key requirements include maintaining 24/7 staffing with a bilingual operator and ensuring strict compliance with National Pollutant Discharge Elimination System permits and other regional water quality board regulations. The government will utilize the Highest Technically Rated with a Fair and Reasonable Price method for award, where non-price factors such as plant operations, permit compliance, and company experience are significantly more important than cost. Technical proposals must be submitted in two separate volumes, with a heavy emphasis on staffing qualifications, including certified Grade V operators and Lab Analyst II personnel. Contractors are required to provide a performance bond and adhere to strict security protocols, including background investigations for all personnel and the protection of Controlled Unclassified Information. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on regulatory compliance, effluent quality, and system uptime.
Sewage Treatment Facilities

POSTED

1 day ago

DEADLINE

in 3 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS