Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

County of Vermilion River - Invitation to Bid - Bridge Files 01640 and 78828 - Culvert Replacement and Other Work

Closed
AB-2026-03185Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months

AI Contract Overview

Show more

The contract involves the supply and installation of two new culvert structures to replace existing bridge infrastructure, specifically a 3.00 meter diameter CSP culvert with a 41.5 meter invert length for Bridge File 01640 and a 2.40 meter diameter CSP culvert with a 28.5 meter invert length for Bridge File 78828. All work must adhere to the Design Drawings and Section 18 of the Standard Specifications for Bridge Construction. The scope encompasses a full range of activities including traffic management, site isolation, turbidity monitoring, fish capture and release, demolition and disposal of existing structures, excavation with geotextile filter fabric, assembly of culvert components, backfilling with specified materials including crushed aggregate Designation 2 Class 40 and Class 25, and clay seals. Additional requirements include concrete end treatments with testing, installation of a small bridge plaque exclusively for Bridge File 01640, heavy rock riprap for erosion control, roadway restoration, and implementation of permanent environmental protection measures. The solicitation is issued by the County of Vermilion River under reference number AB-2026-03185, with bids due by May 28, 2026, and the work is to be performed in Alberta. The contracting authority is Shihang (Kevin) Zhao, P.Eng, and the project falls under NAICS code 237310 for bridge and tunnel construction.

General Info

Supply and install two bridge culverts in Vermilion River with environmental and quality controls.

Agency

Government of Canada → County of Vermilion River

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → County of Vermilion River
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → County of Vermilion River
Office AddressN/A
Contacts
Shihang (Kevin) Zhao P.EngContracting Authority

Full Description

Show more
Work shall include the supply and installation of two new bridge culvert structures: Bridge File 01640: The Contractor shall install a 3.00 m diameter CSP culvert by 41.5 m invert length. Bridge File 78828: The Contractor shall install a 2.40 m diameter CSP culvert by 28.5 m invert length. The bridge culvert installations shall be in accordance with the Design Drawings and Section 18 of the Standard Specifications for Bridge Construction. The Scope of the Work for each Bridge File includes, but is not limited to, the following: − Traffic accommodation − Site isolation, turbidity monitoring, and fish capture and release − Demolition and disposal of bridge structures − Excavation, including geotextile filter fabric − Supply and assembly of culvert materials − Backfill, including backfill material testing − Includes crushed aggregate material Des 2 Class 40, crushed aggregate material Designation 2 Class 25, and clay seals − Concrete end treatment, including testing and small bridge plaque (BF 01640 only) − Heavy rock riprap erosion protection − Roadway work − Permanent environmental protection devices