Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

County Transportation Center Storm Filters

Closed
26041-SState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 8 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 9 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The contract involves the maintenance of stormwater treatment infrastructure at the County Transportation Center to ensure regulatory compliance, protect water quality, and maintain the long-term functionality of the facilities and surrounding drainage systems. The goal is to implement a proactive maintenance program to minimize sediment accumulation, prevent system failures, and reduce pollutant discharge into municipal storm drains and receiving waters. RTD is seeking a qualified vendor with proven experience in stormwater infrastructure maintenance, environmental compliance, and thorough reporting. This project requires adherence to California Labor Code prevailing wage laws, including contractor registration with the California Department of Industrial Relations (DIR), payment of prevailing wages, and submission of certified payroll records. The contractor and all subcontractors must maintain active DIR registration throughout the project and comply with labor compliance requirements such as apprenticeship rules and certified payroll reporting via the DIR online system. The solicitation was posted on May 13, 2026, with a response deadline of May 22, 2026, and is managed by the Facilities agency in Stockton, California. Points of contact include the Facilities Superintendent and the Procurement Specialist.

General Info

Maintenance contract for stormwater treatment at County Transportation Center, ensuring compliance and prevailing wage adherence.

Documents

12

Exhibit B - Compensation, Invoicing & Payment Terms

DOCX, High priority: read this firstcontract-document
High

Exhibit C - California Prevailing Wage Labor Code Requirements

DOCX, High priority: read this firstlabor-code-requirements
High

EXHIBIT D Payment Bond for San Joaquin Regional Transit District Contract

DOCX, High priority: read this firstpayment-bond
High

Exhibit E - CUPCCAA Insurance Requirements

DOCX, High priority: read this firstinsurance-requirements
High

Independent Cost Estimate Form rev20191101

DOCX, High priority: read this first3 pages · independent-cost-estimate
High

Independent Price/Cost Estimate (ICE) for Filters at County Transportation Center

PDF, High priority: read this firstindependent-price-cost-estimate
High

Purchase Request PR012592 for Stormwater System Maintenance

DOCX, High priority: read this firstpurchase-request
High

RFP 26041-S County Transportation Center Storm Filters

PDF, High priority: read this firstrfp
High

Scope of Services for Biannual Stormwater Maintenance

DOCX, High priority: read this firstsow
High

Exhibit F Contractor's Quote

DOCX, Low prioritycontractor-quote
Low

Non-Collusion Declaration for Bid Submission

DOCX, Low prioritynon-collusion-declaration
Low

SAMPLE_CONTRACT_PLACE_HOLDER_SJRTD

DOCX, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Facilities
Contacts2 people available
OfficeStockton, CA, 95202, USA
Organization / AgencyCalifornia → Facilities
Office AddressStockton, CA, 95202, USA
Contacts
John CooseFacilities Superintendent
Samantha HolaProcurement Specialist

Interested Companies (7)

The Builders' Exchange of San Joaquin
Bidscom

See All 7 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
RTD maintains stormwater treatment infrastructure to support regulatory compliance, protect water quality, and ensure the long-term functionality of its facilities and surrounding drainage systems. This project is intended to establish a proactive, reliable maintenance program that minimizes sediment buildup, prevents system failures, and reduces the risk of pollutant discharge into municipal storm drain systems and receiving waters. RTD is seeking a qualified vendor with demonstrated experience in stormwater infrastructure maintenance, environmental compliance, and detailed reporting practices. DIR / Prevailing Wage Requirements This project may be subject to the provisions of the California Labor Code regarding prevailing wages. If applicable, the Contractor and all subcontractors shall comply with all requirements of the California Department of Industrial Relations (DIR), including but not limited to contractor registration pursuant to Labor Code Section 1725.5, payment of prevailing wages pursuant to Labor Code Sections 1770 et seq., and submission of certified payroll records pursuant to Labor Code Section 1776. Contractors and subcontractors performing work on this project must be registered with the DIR and maintain active registration for the duration of the project. The Contractor shall be responsible for compliance with all applicable labor compliance requirements, including prevailing wage determinations, apprenticeship requirements, and certified payroll reporting through the DIR online system. Prevailing wage rates are available from the California Department of Industrial Relations at: California DIR Prevailing Wage Determinations

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS