Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Countywide Guardrail Upgrades Phase III, Project #: 4511, County File #26-14

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The Contra Costa County Public Works Department proposes to remove sub-standard Metal Beam Guardrails (MBGR) and end treatments and replace them with the current Caltrans standard Midwest Guardrail System (MGS) guardrails and end treatments at the locations identified above. Upgrading the guardrails to current Caltrans standards will improve public safety. Approximately 30 existing guardrails with a total length of approximately 8,000 linear feet, including end treatments, will be upgraded, and one new guardrail will be installed. The construction process will include removal and replacement of the existing guardrails, end treatments and associated posts, and relocation of several guardrail posts near end treatments with grading as needed. Construction is scheduled for summer 2027 or summer 2028 and will take approximately two months to complete. Ground disturbance and excavations up to eight feet are anticipated. Approximately nine trees may be removed, and vegetation and tree trimming may be necessary. If necessary, applicable regulatory permits will be obtained before construction. Real Property transactions and utility relocations may be necessary. Temporary traffic controls will be implemented during construction activities and may include short-duration lane closures to divert vehicles around the project areas, including one-way traffic control, resulting in short traffic delays. Full roadway closures are not anticipated. Emergency vehicles will have access at all times. Appropriate best management practices, including but not limited to measures for stormwater control (e.g., storm drain inlet protection) will be implemented during construction.

More opportunities from California → Contra Costa County

Same awarding agency

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS