Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

EV Charging Infrastructure, Various Locations, Project No. WH161A, CP# 24-12

Forecast
State & Local
Solicitation #
24-12

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Martinez, CA, 94553

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The County has accepted a California Energy Commission, Clean Transportation Program, Charging Infrastructure for Government Fleets grant. This project will install electric vehicle (EV) charging ports and electric vehicle supply equipment to five existing, paved parking lots at the County-owned facilities identified above. The project supports County policy governing replacement and procurement of electric vehicles. EV charger installation is anticipated to begin in July 2027 and take approximately one year for completion. Approximately 178 EV charging ports will be installed in existing parking stalls in the paved parking lots. Project activities will include restriping portions of the parking lot, installing new electric vehicle signage and electrical subpanels, and minor trenching to a maximum depth of approximately five feet, to provide electric service to each charging station. Grading may be required to comply with American Disabilities Act (ADA) requirements. Utility relocation, temporary traffic control, and landscape vegetation trimming and removal may be necessary. Best management practices such as storm drain inlet protections will be implemented. Emergency vehicles will have access at all times. Real property transactions and night or weekend work may be necessary.

More opportunities from California → Contra Costa County

Same awarding agency

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS