Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on September 28, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Crestview Virtical Well Drilling

Awarded
AG-9A63-S-11-0083Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

This contract involves the construction of a vertical water well and supporting infrastructure at the Crestview Guard Station within the Mono Lake Ranger District of the Inyo National Forest. The scope of work includes drilling a 400-foot well with specific casing and grouting requirements, yield testing, and disinfection. Key installations include a 10,000-gallon underground FRP water tank, a submersible pump with controls, a fiberglass enclosure, and extensive piping for supply and distribution. Additionally, the project requires the installation of electrical power lines, a liquid level control system, various valves, and the pioneering of a 200-foot access road. Managed by the Department of Agriculture's Tahoe National Forest office, the project carries a government cost estimate between 100,000 and 250,000 dollars. The work was scheduled to begin around September 19, 2011, with performance taking place near Lee Vining, California. The contract is categorized under NAICS code 237110 for water and sewer line construction.

General Info

Contract Value

$144,094

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Mono Lake Ranger District, LEE VINING, CA, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

4 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 31, 2011 to Sep 6, 2011. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 6, 2011 to Sep 12, 2011. The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Tahoe National Forest
Contacts2 people available
OfficeNEVADA CITY, CA, 95959, USA
Office AddressNEVADA CITY, CA, 95959, USA
Contacts
Denise L StormsContracting Officer
Rebecca A PeabodyProcurement Technician

Full Description

Show more
CRESTVIEW WELL DRILLING Inyo National Forest 400 Ft. Vertical well/10000 gallon FRP underground water tank/distribution-water supply lines/pump control lines/power cable line. This specification and other specifications define the requirements for vertical well drilling for Crestview Guard Station, Mono Lake Ranger District located on the Inyo National Forest. Work includes drilling, casing, grouting, yield testing, disinfecting, and developing the vertical well. Also includes the installation of 8-5/8 inch conductor casing to a depth of 50 feet thru the overburden (soft pumice) w/ grout seal and 6 inch liner casing to a depth of 400 feet, concrete surface slab, submersible pump with controls and well head fiberglass enclosure, 10,000 gallon underground FRP water tank, pump supply line 2500 LF, distribution line 2600 LF, electrical power line 500 LF, liquid level control system 2500 LF, valves and valve boxes and pioneering a 200 LF road. The Government's estimate is between $100,000 and $250,000. An organized site visit has been scheduled for: August 17, 2011, 10am, participants will meet at: Crestview Guard Station. The project is located on the Mono Lake Ranger District, of the Inyo National Forest. From Bishop travel north on SH 395 approximately 45 miles to Deadman Creek road FS 2S05 turnoff, proceed west on FS road 2S05 1.5 miles to Crestview Guard station. The estimated date for upload of the Solicitation package is August 1, 2011. Estimated start work date is September 19, 2011.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS