This Solicitation opportunity from Nevada was posted on April 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Addendum 1 to IFB 26-0925 CSN North Las Vegas HVAC Upgrade: This document is Addendum 1 to Invitation for Bid (IFB) 26-0925 for the CSN North Las Vegas Campus B Building HVAC Upgrade. Dated April 9, 2026, it addresses the inclusion of bid documents that failed to upload properly on the NGEM site at the original IFB release on April 8, 2026. The addendum confirms that all other terms, conditions, and specifications of the IFB remain unchanged. The IFB opening is scheduled for April 28, 2026, at 3:00 P.M. Pacific Time.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 2 to IFB-26-0925 CSN North Las Vegas HVAC Upgrade: This document is Addendum 2 to Invitation for Bid (IFB) 26-0925 for the CSN North Las Vegas Campus B Building HVAC Upgrade. Issued by the College of Southern Nevada Purchasing Department on April 20, 2026, it changes the date for answers to be published to April 22, 2026, at 5:00 PM and extends the bid due date to April 30, 2026, at 3:00 PM Pacific Time. All other terms, conditions, and specifications of the original IFB remain unchanged.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 3 - IFB-26-0925 CSN HVAC Upgrade: This document is Addendum 3 dated April 22, 2026, for Invitation for Bid (IFB) 26-0925 regarding the CSN North Las Vegas Campus B Building HVAC Upgrade. It provides a question and answer section clarifying that Lennox is the specified brand for mini splits replacement, and no alternate brand requests can be submitted at this time. The addendum reiterates submission instructions for alternate brand requests and states that all other terms, conditions, and specifications of the IFB remain unchanged.
PDF
PDF, High priority: read this firstbid-attachment
HighAI Summary for Bid Attachment 10 - List of Subcontractors 1% and Above: This document is Bid Attachment 10, titled 'List of Subcontractors 1% and Above.' It requires the prime contractor to list all subcontractors performing more than 1% of the total bid or labor/work portions exceeding specified monetary thresholds. The document outlines submission requirements within 2 hours after bid opening for the three lowest bidders, including subcontractor names, license numbers, and business enterprise group classifications. It also includes instructions on the prime contractor's responsibilities and legal implications under Nevada Revised Statute 338.141. The form contains tables for entering subcontractor details and business classifications, ensuring compliance with subcontractor disclosure regulations.
PDF
PDF, High priority: read this firstaffidavit
HighAI Summary for Bid Attachment 11 Affidavit - Preference Eligibility: This document is Bid Attachment 11, an affidavit related to preference eligibility for bidding under Nevada Revised Statutes 338.1389 and 338.0117. It must be submitted by the low or best bidder within two hours after bid opening to qualify for bidding preference. The affidavit certifies compliance with requirements including that at least 50% of workers hold valid Nevada driver's licenses or IDs, vehicles are registered in Nevada, and payroll records are maintained for inspection. It also outlines the authority needed to sign the affidavit on behalf of the business entity. The document includes a notary section for sworn affirmation.
PDF
PDF, High priority: read this firstschedule-of-values
HighAI Summary for Bid Attachment 12 - Schedule of Values: This document is Bid Attachment 12 titled 'Schedule of Values' submitted within 1 business day after bid opening by the three lowest apparent bidders. It requires bidders to indicate amounts included in the base turnkey bid for various line items such as bonds, insurance, demolition, concrete, masonry, HVAC, electrical, and more. The document specifies that costs for profit, overhead, and incidental items must be evenly distributed across all line items. It also notes that bidders may need to provide additional detailed information upon request.
PDF
PDF, High priority: read this firstchange-order-form
HighAI Summary for Bid Attachment 7 - Change Order Form: This document is a sample Change Order Form for the Nevada System of Higher Education, on behalf of the College of Southern Nevada. It authorizes contractors to make changes to an existing contract, detailing items to be added, deducted, or unchanged, along with reasons and requested by information. The form includes fields for contract and project numbers, cost adjustments, time adjustments, and signatures for approval by the contractor, architect/engineer, facilities management, and finance administration. It serves as an official instrument to modify contract terms, costs, and completion times.
PDF
PDF, High priority: read this firstbid-attachment
HighAI Summary for Bid Attachment 9 - 5% Subcontractor List: This document is Bid Attachment 9, titled '5% List,' used in a bidding process. It requires the prime contractor to list all subcontractors exceeding 5% of the base bid amount, including their names, Nevada State Contractors' license numbers, business enterprise group classification, and ethnicity. The prime contractor must also include its own name and describe any work it will perform directly. The document includes sections for business enterprise information, ethnicity, bidder's preference, and contractor licensing details. It serves to ensure compliance with Nevada Revised Statute 338.141, prohibiting substitution of named subcontractors. The form requires signatures and dates from authorized representatives.
PDF
PDF, High priority: read this firstsow
HighAI Summary for CSN HVAC System Upgrade Scope of Work: This document is the Scope of Work for a construction project by the College of Southern Nevada (CSN) Facilities Management Department to upgrade the HVAC system in the North Las Vegas Campus B Building. It outlines the contractor's responsibilities including permits, resources, materials, licensing, supervision, and damage repair. The project involves removing existing HVAC components and installing new systems such as a Dedicated Outdoor Air System and mini split cassettes. The document also details general conditions, site use, safety, coordination with CSN, compliance with codes and standards, and deliverables like project schedules. The project must be completed within 30 days from the notice to proceed, with liquidated damages for delays.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for CSN North Las Vegas B Building HVAC Upgrade Project Draft Contract: This document is a draft contract for the HVAC upgrade project at the College of Southern Nevada's North Las Vegas Campus B Building. It is effective as of the date last signed and is between the Board of Regents of the Nevada System of Higher Education and a licensed contractor. The contract references IFB No. 26-0925 issued on April 8, 2026, and includes terms such as project description, construction covenant, contract amount, incorporation of contract documents, commencement and completion deadlines, and notice procedures. The document also includes Exhibit A, detailing general conditions covering contractor and owner responsibilities, contract progress, completion, bonding, insurance, indemnity, breach of contract, warranties, and dispute resolution. The version date noted is 2/22/23.
PDF
PDF, High priority: read this firstifb
HighAI Summary for IFB 26-0925 CSN North Las Vegas Campus B Building HVAC Upgrade: This Invitation for Bid (IFB) No. 26-0925 is issued by the Nevada System of Higher Education on behalf of the College of Southern Nevada for the HVAC upgrade project at the North Las Vegas Campus B Building. The document includes submission instructions, general terms and conditions, and bid attachments such as draft contract, scope of work, plans, and specifications. Bids must be submitted by April 28, 2026, with a mandatory site walk on April 13, 2026. The estimated project cost is $200,000. The IFB outlines bidder responsibilities, bid preparation, submission requirements, and compliance with Nevada Revised Statutes Chapter 338. Questions are due by April 16, 2026, with answers and addendums by April 20, 2026.
PDF
PDF, Low priorityspecifications
LowAI Summary for BID ATTACHMENT 4 - PLANS AND SPECIFICATIONS: This document titled 'BID ATTACHMENT 4 - PLANS AND SPECIFICATIONS.pdf' appears to be a set of plans and specifications related to a bid. The content is not provided, but the title indicates it contains technical details and drawings relevant to the procurement. No specific version or date information is available from the provided data.
PDF
PDF, Low prioritybond-sample
LowAI Summary for Bid Attachment 6 - Payment and Performance Bond Sample: This document is Bid Attachment 6, providing sample templates for a 100% Payment Bond and a 100% Performance Bond related to a contract with the College of Southern Nevada under the Nevada System of Higher Education. It outlines the surety obligations to pay for materials, labor, and performance of contract work, including conditions for alterations and extensions. The document is dated 2021 and includes signature and notarization sections for the contractor and surety.
PDF
PDF, Low prioritybid-attachment
LowAI Summary for Bid Attachment 8 - List of Tier 2 Suppliers: This document, titled Bid Attachment 8 - List of Tier 2 Suppliers, is an attachment related to a solicitation identified as an IFB or RFP. It provides a format for proposers to list their historical and anticipated commitments to Tier 2 suppliers, including Minority, Women-Owned, Disabled Veteran, and Local Business Enterprises. The document requires detailed information about subcontractors such as company name, federal tax ID, business license details, contact information, business status, and certification details. It serves as a reporting and compliance tool to ensure diversity and local business participation in the contract work.
PDF
PDF, Low priorityinsurance-certificate
LowAI Summary for Sample Insurance Certificate for Board of Regents NSHE: This document is a sample certificate of insurance issued for informational purposes only. It details various insurance coverages including commercial general liability, automobile liability, umbrella liability, workers compensation, and professional liability with policy numbers, effective and expiration dates, and coverage limits. The certificate holder is the Board of Regents, Nevada System of Higher Education. It includes standard clauses about additional insured provisions, subrogation waivers, and cancellation notice requirements. The document does not confer rights or alter policy coverage and is not a contract.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.