CSRM Phase 1A Floodwall Construction - Preload & Wick Drains

Closed
State & Local
Submission Closed
Solicitation #
27012

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
Lac La Biche County - Request for Quotes - Drainage Program TR-32-2026-18
Solicitation # TR-32-2026-18
Lac La Biche County is seeking quotations for the provision of drainage services on an as-needed basis for a three-year period. The scope of work includes ditching, grading, excavation, culvert installation and replacement, cleaning, drainage restoration, erosion control, and assistance with beaver control operations. These services will be performed at various locations throughout the county, primarily along county roads, within rights-of-way, and within drainage systems. The successful contractor must provide all necessary labor, equipment, and materials, ensuring that all personnel are qualified and equipment is maintained in good working condition with appropriate safety devices. The contract is open to multiple contractors, and the county reserves the right to award the work to a bidder other than the lowest-priced respondent based on factors such as capability, schedule, and qualifications. Bidders must submit two hard copies and one electronic PDF copy on a USB flash drive by December 14, 2026, at 2:00 p.m. Alberta Time. Pricing must be submitted in Canadian dollars using the provided pricing sheet, covering mobilization, minimum callout rates, and hourly equipment rates. Payment terms are set at 30 days upon receipt of a satisfactory invoice, which must include the purchase order number and separate GST details. All deliverables are delivered F.O.B. Destination, and the county maintains the right to reject any equipment or operators deemed unsuitable or unsafe.
Lac La Biche County

POSTED

about 9 hours ago

DEADLINE

in 18 days
NAICS: 237990
New
SLED
The Awesome Spot Playground - Phase 1B
Solicitation # 2027-04
The City of Modesto is soliciting bids for project number 2027-04, the construction of The Awesome Spot Playground - Phase 1B in Modesto, California. The scope of work includes site preparation, selective demolition, earthwork, grading, and the installation of concrete work, metal fabrications, and playground equipment. Key deliverables include the installation of poured rubber and synthetic turf surfacing, decorative metal fencing, irrigation, and various site furnishings such as benches, shade canopies, and custom art. The contractor is responsible for coordinating electrical work with another contractor and installing City-provided elements. The project has an estimated base bid value of $2,074,305 and must be completed within 80 working days from the Notice to Proceed. Bids must be submitted electronically via the OpenGov Procurement Portal by December 15, 2026. Requirements include a bid security of at least 10 percent of the bid amount, a Local Hire Certification, and a Skilled and Trained Workforce Certification. The contractor must provide a five-year special warranty covering structural failures and material deterioration upon substantial completion. All playground equipment must comply with ASTM F1487 and carry the IPEMA Certification Seal. The project requires the payment of prevailing wages and adherence to ADA compliance and California safety orders. Administrative management, including progress payments and submittals, will be handled through the e-builder Project Management Information System. There is no set-aside status specified for this solicitation.
City of Modesto

POSTED

about 17 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

Project 27012, CSRM Phase 1A Floodwall Construction - Preload & Wick Drains, is a unit price contract issued by the City of Norfolk Department of Public Works for ground improvement along Water Street, extending from Berkley Bridge to the Harbor Park Pump Station. The primary objective is to mitigate risks from compressible clay soils by installing prefabricated vertical wick drains and constructing a temporary soil surcharge embankment to accelerate settlement, creating a stable foundation for a future permanent floodwall. The scope also includes the installation of permanent sheet piling, stormwater pipe relocation, and the installation of a temporary outfall. The U.S. Army Corps of Engineers serves as the Designer of Record, while the City of Norfolk is the sole agency responsible for contract administration, field inspection, and quality assurance. Key contractual requirements include compliance with the Buy American Act, the Davis-Bacon Act, and Virginia Wage Determinations. The contractor is responsible for the design of the sheet pile wall and must provide a dedicated Superintendent, as well as a Quality Control Manager who may also serve as the Site Safety and Occupational Health Officer. Substantial Completion is set for 450 days and Final Completion for 480 days, with the contract time specifically extended to accommodate the required 6 to 8 month surcharge hold period. Bids are due by 4:00 PM on November 05, 2026, and must include a bid guarantee of 5 percent of the total bid amount. Performance and payment bonds are required upon award.

General Info

City of Norfolk floodwall ground improvement project with 480-day final completion deadline.

Documents

8
PDF, High priority: read this firstamendment
High
PDF, High priority: read this first75 pages · ifb
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstdesign-documentation-report
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstsow
High

Read all 8 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Solicitation requirements

22 mandatory

24 requirements in 6 areas

  • Technical8 · 8 must
    013

    Prefabricated Vertical Drain Installation

  • Submission9 · 7 must
    001

    Information Request Submission

    Contract notice
  • Management3 · 3 must
    021

    Project Completion Timeline

    Contract notice
  • 21 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 24 requirements

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Imperial Irrigation District – East Highline ReservoirOpen now, due in 11 days
  • Imperial Irrigation District – East Highline ReservoirOpen now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

3 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Oct 29, 2026 to Nov 5, 2026.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia → Public Works (D&C)
Contacts2 people available
OfficeNorfolk, VA, 23501, USA

Interested Companies (34)

Allan Myers VAGLEN ALLEN, VA
Arcadis, U.SVirginia Beach, VA

See All 34 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Contractors are subject to comply to Federal Requirements for Projects Cost-Shared with the U.S. Army Corps of Engineers (where applicable), and Virginia Wage Determination as found in Appendix A and B of attached Complete Bid Package. All Requests for Information (RFIs) shall be submitted no later than Monday, October 19, 2026 4:00 pm through the Questions portal at https://procurement.opengov.com/portal/norfolk/projects/303577 . Any RFI submitted after this date cannot be guaranteed a response by the City.
Addendum #1: ADDENDUM NO. 1 Dated: September 30, 2026 27012 - CSRM Phase 1A Floodwall Construction - Preload & Wick Drains Except as may be otherwise described, bidding requirements, materials, and workmanship for the work described herein shall conform to all requirements of the original Contract Documents. The following Addendum to the drawings and specifications are made a part of the project and takes precedence over the section of the specifications, in part, and/or drawings, as originally written. This Addendum consists of one (1) page. ITEM NO. DESCRIPTION TECHNICAL SPECIFICATIONS Add: Appendix C - Norfolk Coastal Storm Risk Management Phase 1A – Preloading and Vertical Drain – Design Documentation Report – 100% Submission Backcheck - 979_NCSRM_PRELOAD_100_DDR_CITY_BACKCHECK ATTACHMENTS Add: Attachment C - 979_NCSRM_PRELOAD_100_DDR_CITY_BACKCHECK to supporting documents. Add: Revised 27012 - Complete Bid Package – Complete Bid Package has been updated with Appendix C and split into 2 parts due to size of files. Receipt of this addendum shall be acknowledged on page 1.3-1 of the Bid Form Prepared by: Ken Peacock, Design & Construction Contracting Specialist Issued by: Ken Peacock, Design & Construction Contracting Specialist
Addendum #2: ADDENDUM NO. 2 Dated: October 9, 2026 27012 - CSRM Phase 1A Floodwall Construction - Preload & Wick Drains Except as may be otherwise described, bidding requirements, materials, and workmanship for the work described herein shall conform to all requirements of the original Contract Documents. The following Addendum to the drawings and specifications are made a part of the project and takes precedence over the section of the specifications, in part, and/or drawings, as originally written. This Addendum consists of two (2) pages. ITEM NO. DESCRIPTION QUESTIONS AND RESPONSES 1. Missing Appendices Question: Appendix B and Appendix C* as shown in Table of Contents for Part 2 Complete Bid Package (*also referenced in Addendum 1 dated 9.30.26) are not included in the pdf posted to OpenGov Answered by Ken Peacock: In Part 2 of the Complete Bid Package (a 477-page PDF) - Appendix A can be found from page 429 - 430, Appendix B can be found from 431 - 436, Appendix C can be found from 437 - 477. 2. Temporary Fencing Question: Plan Sheets CD101 and CD102 call out temporary stockade fencing around the existing electrical utilities at the northernmost part of the project closest to the plan sheet match lines. Is the intent of installing the temporary fencing to protect the existing electrical utilities? Or is the intent to install the temporary fencing around the perimeter of the job site? Answered by Eric Berger: The intent of the temporary fencing is twofold: to protect the above-grade Dominion Energy utilities in place, and to secure the northern perimeter of the preload construction area as depicted on the drawings. Please note that if the ERT is to remain north of Water Street during the actual preloading phase, the temporary fencing alignment may be shifted to enclose the job site. 3. Line Item #8 Utility Infrastructure (Not Storm) Question: The plan sheets reference all existing utilities within the project limits being removed by the Owner. The plans only reference storm drain for new construction. Please provide clarification on the intent of Line Item #8. Answered by Eric Berger: All non-stormwater utilities that are to be removed will be done so by the owner. The stormwater pipes are to be relocated and a temporary outfall installed by this contract. Addendum with clarifying exhibits/descriptions will be created and distributed. 4. Preconstruction Inspection Question: As noted in Section 31 09 13, the contractor shall perform a preconstruction inspection of any above and below ground structures. Shall the contractor make provisions to include structures/utilities called out to be removed as part of this inspection? Answered by Eric Berger: Yes, the contractor shall make provisions to include the structures and utilities called out for removal as part of the preconstruction inspection. See also: answer to question number 3. 5. Demolition Question: Please provide clarification as to which line item the contractor shall use for demolition outside of storm drain demolition. Answered by Eric Berger: All other demolition will be performed prior to this contract. The full demo sheets were provided for reference only. Receipt of this addendum shall be acknowledged on page 1.3-1 of the Bid Form. Prepared by: Ken Peacock, Design & Construction Contracting Specialist Issued by: Ken Peacock, Design & Construction Contracting Specialist
Addendum #3: ADDENDUM NO. 4 Dated: October 15, 2026 27012 - CSRM Phase 1A Floodwall Construction - Preload & Wick Drains Except as may be otherwise described, bidding requirements, materials, and workmanship for the work described herein shall conform to all requirements of the original Contract Documents. The following Addendum to the drawings and specifications are made a part of the project and takes precedence over the section of the specifications, in part, and/or drawings, as originally written. This Addendum consists of one (1) page. ITEM NO. DESCRIPTION RFI Extension The RFI (Request for Information) date has been extended until 4:00 PM, October 19, 2026. Receipt of this addendum shall be acknowledged on page 1.3-1 of the Bid Form. Prepared by: Ken Peacock, Design & Construction Contracting Specialist Issued by: Ken Peacock, Design & Construction Contracting Specialist Please use the See What Changed link to view all the changes made by this addendum.
Addendum #4: ADDENDUM NO. 3 Dated: October 22, 2026 27012 - CSRM Phase 1A Floodwall Construction - Preload & Wick Drains Except as may be otherwise described, bidding requirements, materials, and workmanship for the work described herein shall conform to all requirements of the original Contract Documents. The following Addendum to the drawings and specifications are made a part of the project and takes precedence over the section of the specifications, in part, and/or drawings, as originally written. This Addendum consists of two (2) pages. ITEM NO. DESCRIPTION QUESTIONS AND RESPONSES 1. Missing Appendices Question: Appendix B and Appendix C* as shown in Table of Contents for Part 2 Complete Bid Package (*also referenced in Addendum 1 dated 9.30.26) are not included in the pdf posted to OpenGov Answered by Ken Peacock: In Part 2 of the Complete Bid Package (a 477-page PDF) - Appendix A can be found from page 429 - 430, Appendix B can be found from 431 - 436, Appendix C can be found from 437 - 477. 2. Temporary Fencing Question: Plan Sheets CD101 and CD102 call out temporary stockade fencing around the existing electrical utilities at the northernmost part of the project closest to the plan sheet match lines. Is the intent of installing the temporary fencing to protect the existing electrical utilities? Or is the intent to install the temporary fencing around the perimeter of the job site? Answered by Eric Berger: The intent of the temporary fencing is twofold: to protect the above-grade Dominion Energy utilities in place, and to secure the northern perimeter of the preload construction area as depicted on the drawings. Please note that if the ERT is to remain north of Water Street during the actual preloading phase, the temporary fencing alignment may be shifted to enclose the job site. 3. Line Item #8 Utility Infrastructure (Not Storm) Question: The plan sheets reference all existing utilities within the project limits being removed by the Owner. The plans only reference storm drain for new construction. Please provide clarification on the intent of Line Item #8. Answered by Eric Berger: All non-stormwater utilities that are to be removed will be done so by the owner. The stormwater pipes are to be relocated and a temporary outfall installed by this contract. Addendum with clarifying exhibits/descriptions will be created and distributed. ** See Attachment D in Supporting Attachments (27012 – Supplemental to RFI Question #3 Response – Addendum 2 and 3). 4. Preconstruction Inspection Question: As noted in Section 31 09 13, the contractor shall perform a preconstruction inspection of any above and below ground structures. Shall the contractor make provisions to include structures/utilities called out to be removed as part of this inspection? Answered by Eric Berger: Yes, the contractor shall make provisions to include the structures and utilities called out for removal as part of the preconstruction inspection. See also: answer to question number 3. 5. Demolition Question: Please provide clarification as to which line item the contractor shall use for demolition outside of storm drain demolition. Answered by Eric Berger: All other demolition will be performed prior to this contract. The full demo sheets were provided for reference only. 6. Maintenance of Traffic Question: How many Portable Changeable Message Signs are required for the project? Answered by Eric Berger: Traffic control should be set up following the Virginia Work Area Protection Manual and the Manual on Uniform Traffic Control Devices. 7. Erosion Control Question: Are all of the erosion controls installed under this contract to be removed upon completion of the work? Answered by Eric Berger: Erosion and sediment controls should be left in place at the completion of this work. 8. Asphalt Trail Question: Is the asphalt trail appearing on plan sheets CS101 and CS102 as being installed in this contract. Is it, and if so, under what Pay Item is it paid? Answered by Eric Berger: The asphalt trail will be removed and reinstalled in other contractual phases. 9. Embankment Question: Is the preload berm to be removed, after the settlement period is complete, in this contract? Answered by Eric Berger: The berm will be removed in the next contractual phase. Receipt of this addendum shall be acknowledged on page 1.3-1 of the Bid Form. Prepared by: Ken Peacock, Design & Construction Contracting Specialist Issued by: Ken Peacock, Design & Construction Contracting Specialist
Addendum #5: ADDENDUM NO. 5 Dated: October 22, 2026 27012 - CSRM Phase 1A Floodwall Construction - Preload & Wick Drains Except as may be otherwise described, bidding requirements, materials, and workmanship for the work described herein shall conform to all requirements of the original Contract Documents. The following Addendum to the drawings and specifications are made a part of the project and takes precedence over the section of the specifications, in part, and/or drawings, as originally written. This Addendum consists of one (1) page. ITEM NO. DESCRIPTION FRONT END Substantial Completion and Final Completion days have been revised to 450 days and 480 days respectively. EXTENSION OF PROJECT DUE DATE Project Due Date has been extended to Thursday November 05, 2026. COMPLETE BID PACKAGE Complete Bid Package has been revised to reflect changes above. Receipt of this addendum shall be acknowledged on page 1.3-1 of the Bid Form Prepared by: Ken Peacock, Design & Construction Contracting Specialist Issued by: Ken Peacock, Design & Construction Contracting Specialist
Addendum #6: ADDENDUM NO. 6 Dated: October 23, 2026 27012 - CSRM Phase 1A Floodwall Construction - Preload & Wick Drains Except as may be otherwise described, bidding requirements, materials, and workmanship for the work described herein shall conform to all requirements of the original Contract Documents. The following Addendum to the drawings and specifications are made a part of the project and takes precedence over the section of the specifications, in part, and/or drawings, as originally written. This Addendum consists of six (6) pages. ITEM NO. DESCRIPTION QUESTIONS AND RESPONSES 1. Missing Appendices Question: Appendix B and Appendix C* as shown in Table of Contents for Part 2 Complete Bid Package (*also referenced in Addendum 1 dated 9.30.26) are not included in the pdf posted to OpenGov. Answered by Ken Peacock: In Part 2 of the Complete Bid Package (a 477 page PDF) - Appendix A can be found from page 429 - 430, Appendix B can be found from 431 - 436, Appendix C can be found from 437 - 477. 2. Temporary Fencing Question: Plan Sheets CD101 and CD102 call out temporary stockade fencing around the existing electrical utilities at the northernmost part of the project closest to the plan sheet match lines. Is the intent of installing the temporary fencing to protect the existing electrical utilities? Or is the intent to install the temporary fencing around the perimeter of the job site? Answered by Eric Berger: The intent of the temporary fencing is twofold: to protect the above-grade Dominion Energy utilities in place, and to secure the northern perimeter of the preload construction area as depicted on the drawings. Please note that if the ERT is to remain north of Water Street during the actual preloading phase, the temporary fencing alignment may be shifted to enclose the job site. 3. Line-Item #8 Utility Infrastructure (Not Storm) Question: The plan sheets reference all existing utilities within the project limits being removed by the Owner. The plans only reference storm drain for new construction. Please provide clarification on the intent of Line Item #8. Answered by Eric Berger: All non-stormwater utilities that are to be removed will be done so by the owner. The stormwater pipes are to be relocated and a temporary outfall installed by this contract. Addendum with clarifying exhibits/descriptions will be created and distributed. 4. Preconstruction Inspection Question: As noted in Section 31 09 13, the contractor shall perform a preconstruction inspection of any above and below ground structures. Shall the contractor make provisions to include structures/utilities called out to be removed as part of this inspection? Answered by Eric Berger: Yes, the contractor shall make provisions to include the structures and utilities called out for removal as part of the preconstruction inspection. See also: answer to question number 3. 5. Demolition Question: Please provide clarification as to which line item the contractor shall use for demolition outside of storm drain demolition. Answered by Eric Berger: All other demolition will be performed prior to this contract. The full demo sheets were provided for reference only. 6. Maintenance of Traffic Question: How many Portable Changeable Message Signs are required for the project? Answered by Eric Berger: Traffic control should be set up following the Virginia Work Area Protection Manual and the Manual on Uniform Traffic Control Devices. 7. Erosion Control Question: Are all of the erosion controls installed under this contract to be removed upon completion of the work? Answered by Eric Berger: Erosion and sediment controls should be left in place at the completion of this work. 8. Asphalt Trail Question: Is the asphalt trail appearing on plan sheets CS101 and CS102 as being installed in this contract. Is it, and if so, under what Pay Item is it paid? Answered by Eric Berger: The asphalt trail will be removed and reinstalled in other contractual phases. 9. Embankment Question: Is the preload berm to be removed, after the settlement period is complete, in this contract? Answered by Eric Berger: The berm will be removed in the next contractual phase. 10. Sheet Pile Wall Elevation Question: The keynotes on CS102 and CS103 call out a top of sheet pile wall as Elev. 12.0'. Sheet C-701 and C-702 details the top of sheet pile wall as Elev. 13.0'. Please confirm the top of sheet pile wall elevation. Answered by Eric Berger: The top of sheet pile should be at elevation of 13.0' 11. Sheet Pile Design Question: There is little detail to the sheet pile wall. Part 1.1 of Section 31 41 16 - Metal Sheet Piling states, "Design, furnish, install metal sheet piles at the locations indicated on the drawings and specified herein." Is the intent for the Contractor to have the sheet pile wall designed? If so are design parameters available (ie, required loading, concrete cap, etc.)? Answered by Eric Berger: The Contractor is responsible for the design of the sheet pile wall. Design parameters are provided in Specification Section 31 41 16, Part 2.1 "Metal Sheet Piling." Cut list requirements have been provided to mitigate the J&A process. The Contractor shall submit design calculations verifying bending strength of the provided section requirements for the sheet piling to the Norfolk District Office for review and approval. 12. Temporary Fence Question: Would the use of Welded Wire Mesh Panels for temporary Fencing be acceptable for this project? Answered by Eric Berger: The use of welded wire mesh panels with a wood frame, or standard chain link panels, is acceptable for temporary fencing. 13. Temporary Fence Question: Is the removal of temporary fence included in this contract or will it be left in place for the next phase of the project? Answered by Eric Berger: The removal of the temporary fence is included in this contract. 14. Temporary Sheet Piles Question: Is the removal of temporary Sheet Piles included in this contract or will it be left in place for the next phase of the project? Answered by Eric Berger: The removal of the temporary sheet pile wall is not included in this contract; it will be executed under the subsequent 1A-Water Street contract. 15. Turbidity Curtain Question: During our site visit, we observed that turbidity curtains are already in place. Could you confirm whether the turbidity curtains are still required under this contract? Answered by Eric Berger: USACE will allow for the contractor to make the determination on turbidity curtain inclusion. 16. Pre Bid Question: Will you be posting the sign in sheet from the prebid meeting? Answered by Eric Berger: No 17. No subject Question: Section 01 11 00 1.2.1 requires the wick drains and surcharge to remain in place "for a minimum period of 6 months to a maximum period of 8 months, or as determined by the monitoring process." Section 31 05 65 1.1 requires the PVD submittal "at least 120 calendar days prior to the Contractor's proposed starting date for the installation of the PVDs." Counting from NTP: 120 days of submittal lead, approximately 60 days to install the PVDs and place the surcharge, and a 180- to 240-day hold total 360 to 420 days before the hold ends, against the 365-calendar-day time for Substantial Completion in Article 2 of the Contract. Please confirm one of the following: (a) the 365-day contract time will be extended to accommodate the full hold period, or (b) the surcharge hold period beyond Substantial Completion will be treated as an excusable, compensable delay and not subject to liquidated damages. Answered by Eric Berger: Yes, the 365-day contract time will be extended to accommodate the full surcharge hold period. Please note that even with a minimum hold timeline of 360 days, post-construction surveys and project closeout activities will still be required. The extension will be handled with an amendment rather than considering the schedule defect a delay. 18. No subject Question: The specifications require three separate full-time on-site individuals: a Superintendent who "must not serve as the Quality Control Manager" or "Site Safety and Occupational Health Officer" (01 30 00 1.6.3); a QC Manager who "must maintain a physical presence at the work site at all times" (01 45 00 1.4), without whom "no construction work or testing may be performed" (01 45 00 1.5), and whose "only duties and responsibilities ... are to manage and implement the QC program" (01 45 00 1.6.2.1); and a Level One SSHO who "must not serve as the Quality Control Manager" or "the Superintendent" (01 35 26 1.7.3). Section 01 35 29.13 1.5.2.2.b states the SSHO "can have collateral duties in addition to SOH related duties." Given the size of this contract and the 6- to 8-month period during which the only site activity is instrumentation monitoring, please confirm: (a) whether one qualified individual may serve in combined roles (Superintendent/QC Manager/SSHO, or at minimum Superintendent/QC Manager), and (b) whether full-time on-site presence is required during the surcharge monitoring period when no construction activity is taking place. Answered by Eric Berger: The Superintendent must not have any other roles. However, the QC Manager will be allowed to also serve as the SSHO onsite. During the surcharge monitoring period when no active construction is happening, full-time onsite presence for these personnel isn't required. That said, check-ins and inspections must still be completed in accordance with the design documents. 19. Sheet Piling Question: Please confirm the type of sheet pile that shall be utilized on this project (example: PZ-22, PZ-27, AZ18, PZC, NZ, etc.). Oct 19, 2026 2:24 PM Answered by Eric Berger: The Contractor is responsible for selecting the appropriate sheet pile type (e.g., PZ-22, etc.) that meets the design parameters outlined in Specification Section 31 41 16. The selected sheet pile type must be submitted to USACE for review and approval prior to procurement and installation. 20. Buy America and BABA Question: Per the specifications, I notice the project is to follow "Buy American" provisions. Is the contractor bound to the "Buy America" and "BABA" Acts as well? Answered by Eric Berger: The Contractor is bound by the requirements of Buy American not BABA. 21. Sheet Piling Question: Please provide the tip elevation of the proposed sheet piling as it pertains to the project. Also, please confirm if the sheet piling needs to be coated. Answered by Eric Berger: The proposed sheet pile tip elevation is -22.0 NAVD88, as indicated on Drawing C-701. Coating is required for the sheet pile wall as stated in section 2.1.d. Receipt of this addendum shall be acknowledged on page 1.3-1 of the Bid Form Prepared by: Eric Berger , PE Issued by: Ken Peacock, Design & Construction Contracting Specialist Attachments: 27012_-_Addendum_6.pdf

More opportunities from Virginia → Public Works (D&C)

Same awarding agency

NAICS: 237110
New
SLED
St. Paul's Blue-Greenway - Stormwater Phase
Solicitation # 19263
The St. Paul's Blue-Greenway Stormwater Phase (Project No. 19263) is a construction project for the City of Norfolk, Virginia, involving the daylighting of 1,200 linear feet of box culvert, excavation, deep foundations, and bridge construction. The project is partially funded by the Land and Water Conservation Fund of the National Park Service and a National Fish and Wildlife Foundation Grant, requiring strict adherence to the Build America, Buy America Act (BABAA). Consequently, all iron, steel, manufactured products, and construction materials must be produced in the United States unless an approved waiver is granted. The work must be performed according to Virginia Department of Transportation (VDOT) Road and Bridge Specifications and AIA A201-2017 General Conditions. The contract requires a performance and payment bond each for 100% of the contract price and a bid guarantee of 5%. Performance is subject to the Davis-Bacon Act for prevailing wages and requires compliance with the Americans with Disabilities Act and various non-discrimination statutes. A critical interim milestone for work within the future YMCA parking lot and facility limits, including the Northern Maintenance Vault and grading, must be completed by October 1, 2027, with liquidated damages of $4,000 per calendar day up to a cap of $360,000. The overall period of performance is 360 calendar days from the Notice to Proceed, with work commencing within ten days of that notice. Bids are due by December 18, 2026, and must be submitted electronically through the City's procurement portal.
Water and Sewer Line and Related Structures Construction

POSTED

7 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS