Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on April 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CSU WTP 1 Iron Filter Rehabilitation

Closed
26B-018State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveys, preconstruction video, and traffic control. Norstar Plumbing and Engineering, Inc. is managing the solicitation and is specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website, and coordination is handled by primary points of contact Nathan and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 3 hours ago

DEADLINE

in about 22 hours
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, site grading, and the provision of a fully operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with responsiveness contingent upon the submission of a completed EJCDC C-410 Bid Form, a bid bond, and required MWBE documentation, including a Good Faith Efforts Form and Table A. The contractor must provide performance and payment bonds equal to the contract price and maintain insurance with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to achieve substantial completion. Payments are processed monthly via applications for payment submitted to the Engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Bids will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of the Mountain Avenue Lift Station with two submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operational service. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. All bids and quotes must be submitted by October 29, 2025, at 2:00 PM.
Filanc

POSTED

about 3 hours ago

DEADLINE

in about 22 hours

AI Contract Overview

Show more

The North Sumter County Utility Dependent District is seeking bids for the rehabilitation of the existing horizontal pressure filters at CSU WTP 1, which includes six filter cells. The project scope involves removing and replacing the current filter media layers—gravel, torpedo sand, GreensandPlus, and anthracite—along with repairing any damaged interior filter components, cleaning the filter cells, disinfecting and conditioning the filter media, and completing filter startup. Bidders must provide all necessary labor, services, equipment, materials, and permits, either directly or through subcontractors, to complete the work efficiently and professionally. Work will commence upon receipt of the Notice to Proceed, with a target for Substantial Completion within 150 days and Final Completion within 180 days, although extensions may be granted for unforeseen circumstances with District approval. The successful contractor and any subcontractors are required to attend a pre-construction meeting after the contract award and agreement execution. The project is managed by the Utilities department of the North Sumter County Utility Dependent District, located in The Villages, Florida, with designated points of contact available for inquiries. The bid response deadline is May 29, 2026.

General Info

North Sumter County seeks bids to rehabilitate six pressure filters, complete within 180 days.

Documents

11

C700 Standard General Conditions of the Construction Contract

PDF, High priority: read this first70 pages · contract-document
High

Exhibit D - Summary of Work for CSU Water Treatment Plant Filter Media Replacement

PDF, High priority: read this firstsow
High

Exhibit E - Technical Specifications for CSU WTP 1 Iron Filter Rehabilitation

PDF, High priority: read this firsttechnical-specifications
High

ITB 26B-018 CSU WTP 1 Iron Filter Rehabilitation

PDF, High priority: read this firstitb
High

ITB 26B-018 CSU WTP 1 Iron Filter Rehabilitation

PDF, High priority: read this firstitb
High

ITB 26B-018 CSU WTP 1 Iron Filter Rehabilitation Proposal Form

XLSX, High priority: read this firstitb
High

Sample_520 Agreement for CSU WTP 1 Iron Filter Rehabilitation

PDF, High priority: read this firstcontract-document
High

Sample C800 Supplementary Conditions of Construction Contract

PDF, High priority: read this firstsupplementary-conditions
High

Exhibit F - CSU WTP 1 Iron Filter Pictures

PDF, Low priorityother
Low

Exhibit G - CSU WTP 1 Iron Filter Drawing

PDF, Low priorityspecifications
Low

Meeting Summary ITB 26P-018 CSU Water Treatment Plant 1 Iron Filter

PDF, Low prioritypresolicitation-meeting-summary
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Utilities
Contacts2 people available
OfficeThe Villages, FL, 32163, USA
Organization / AgencyFlorida → Utilities
Office AddressThe Villages, FL, 32163, USA
Contacts
Karen WhiteSr Utilities Operations Manager
Crystal Ford-BellamySenior Procurement Agent

Interested Companies (26)

St Cloud Welding & FabricationSt Cloud, FL
Lincoln Surety GroupSarasotat, FL
ConstructConnectCincinnati, OH

See All 26 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The North Sumter County Utility Dependent District is requesting bids for rehabilitation of the existing horizontal pressure filters at CSU WTP 1 (6 cells total), including, but not limited to, the removal and replacement of existing media consisting of gravel, torpedo sand, GreensandPlus, and anthracite layers; repair of damaged interior filter components as necessary; filter cell cleaning; filter media disinfection and conditioning; and filter startup. Qualified firms wishing to respond to "CSU WTP 1 Iron Filter Rehabilitation" must provide all labor, services, equipment, and materials described in this document, whether directly or through subcontractors/subconsultants. Work on this project will begin upon the awarded Contractor's receipt of the Notice to Proceed, with Substantial Completion expected within 150 days and Final Completion within 180 days. The completion date may be extended due to unforeseen circumstances, subject to District approval. The successful Contractor will be responsible for performing all work in accordance with the attached project requirements, including providing all materials, labor, equipment, and permitting necessary to complete the project in a timely and professional manner. The successful Contractor and any subcontractors will be required to attend a pre-construction meeting after the bid award has been approved by the North Sumter County Utility Dependent District and the Agreement has been executed by all parties.

More opportunities from Florida → Utilities

Same awarding agency

NAICS: 237110
SLED
Replacement of Water Service Lines (Age and/or Emergency)
Solicitation # 26-T01417
Hernando County Utilities is soliciting bids for a term contract under solicitation number 26-T01417 for the replacement of water service lines due to age or emergency. The project requires an experienced and licensed underground and excavation contractor to furnish and install 1-inch and 2-inch long side and short side water services using open cut methods. The scope of work includes the installation of corporation stops, service tubing, tracer wire, and curb stops, as well as the abandonment of existing lines. Contractors are responsible for full site restoration, including saw cutting, lime rock backfill, asphalt restoration using type SP 12.5, and sod replacement. All work must adhere to HCUD construction specifications, DPW Facility Design Guidelines, and FDOT standards. Bids are due by November 9, 2026, via the County eProcurement Portal, with a mandatory pre-bid conference held on October 14, 2026. The contract will be awarded to the lowest responsive and responsible bidder on an all-or-none total offer basis, with a local preference for businesses located within Hernando County. Key requirements include a minimum of 5 million dollars in excess or umbrella liability insurance, compliance with OSHA and FDOT safety standards, and the provision of performance and payment bonds for projects valued at 250,000 dollars or more. Payment is processed via ACH within 45 days following the submission of invoices and passing density tests for roadway restoration.
Water and Sewer Line and Related Structures Construction

POSTED

7 days ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS