This Solicitation opportunity from Colorado was posted on October 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Solicitation IFB 2027000027 is a Design/Bid/Build contract issued by the Colorado Department of Corrections for the replacement of the fire protection system at the Rifle Correctional Center in Rifle, Colorado. The scope of work involves the installation of fire protection systems as detailed in the sprinkler and fire pump drawings, including the removal and return of backflow preventers from living units to the owner. Bids must be submitted electronically via BidNet Direct by October 14, 2026, at 10:00 AM. The contract will be awarded to the lowest responsible bidder, considering the Colorado resident bidder preference and evaluating base bids alongside additive or deductible alternates.
The agreement incorporates strict compliance requirements, including the provision of performance and labor and material payment bonds, as well as a bid security of at least 5 percent for bids estimated at 50,000 dollars or more. Contractors must adhere to Colorado labor laws, including 80 percent Colorado labor for projects exceeding 500,000 dollars, and provide apprenticeship utilization certifications for mechanical, electrical, and plumbing work. Additional requirements include reporting embodied carbon emissions via Environmental Product Declarations and maintaining strict confidentiality regarding state records. Payment is processed via State form SBP-7.2, with terms set at 45 days from certification.
General Info
Contract for replacing the fire protection system at Rifle Correctional Center, Colorado.
PDF, High priority: read this first2 pages · bid-bond
HighAI Summary for 2026-031M25 RCC Fire Protection System Replacement - Bid Bond: A standard bid bond form (SBP-6.14, Rev 7/2025) for the Colorado Department of Corrections project 2026-031M25 (RCC Fire Protection System Replacement). It requires a guaranty of 5% of the total bid price and mandates that the bond be accompanied by a Power of Attorney to avoid being deemed non-responsive.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 1 - IFB 2027000027 RCC Fire Protection System Replacement: Addendum No. 1 dated 10/06/2026 for the Rifle Correctional Center Fire Protection System Replacement (IFB 2027000027). The document includes a pre-bid meeting sign-in sheet, the pre-bid conference agenda, and responses to Requests for Information (RFI). Notably, it identifies a scope change regarding the removal of backflow preventers in Living Units and provides a fire pump inspection report.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for Appendix B1 - Bid Alternates: RCC Fire Protection System Repl.: A State of Colorado Office of the State Architect bid alternate form (SBP-6.1 31, Rev 7/2025 R1) for the RCC Fire Protection System Replacement project. The document provides a structured format for bidders to submit pricing for additive and deductive alternates to modify the base bid.
PDF
PDF, High priority: read this first3 pages · rfb
HighAI Summary for Appendix B - Bid Form: RCC Fire Protection System Repl.: This document is a formal Bid Form (SBP-6.1 3) issued by the State of Colorado Office of the State Architect for the RCC Fire Protection System Replacement project. It requires bidders to provide a base bid amount, project completion timelines, and certifications regarding Colorado labor requirements (80%), SDVOSB status, and bid guarantees. It outlines the bidder's commitment to execute the contract, provide necessary bonds and insurance, and comply with state prevailing wage and apprenticeship laws.
PDF
PDF, High priority: read this first13 pages · wage-determination
HighAI Summary for CO20260001 - Appendix D: Applicable Prevailing Wage: General Decision Number CO20260001, dated 05/18/2026, specifies the prevailing wage rates and fringe benefits for various construction trades (including electricians, plumbers, carpenters, and ironworkers) across multiple counties in Colorado.
PDF
PDF, High priority: read this first7 pages · ifb
HighAI Summary for IFB 2027000027 - Fire Protection System Replacement, Rifle Correctional Center: An Invitation for Bids (IFB 2027000027) issued by the State of Colorado Department of Corrections for the replacement of fire alarm systems and repairs to fire protection systems at the Rifle Correctional Center. The estimated project cost is $1,600,000.00. The scope includes replacing obsolete Siemens MXLQ systems with a networked addressable system and restoring fire-protection water supply to living units. The document outlines legal requirements including Colorado labor preferences, Buy Clean Colorado Act compliance, prevailing wage rates, and minimum bidder qualifications.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Project 2026-031M25 - Direct Labor Burden Calculation Form: State Form SBP-6.18 (Issued 8/2023) for the Colorado Department of Corrections Project 2026-031M25 (RCC Fire Protection System Replacement). This document is a required submission for contractors and major subcontractors to define labor overhead percentages (taxes, benefits, insurance) used for contract Exhibit A and future Change Order Proposals.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for RCC Fire Protection System Repl. - Bid Alternates: A State of Colorado Office of the State Architect (State Buildings Program) form for submitting additive and deductive bid alternates for the RCC Fire Protection System Replacement project. The document provides a structured pricing table for bidders to list costs for specific alternates and includes instructions regarding the application of additive versus deductible alternates.
PDF
PDF, High priority: read this first2 pages · itb
HighAI Summary for RCC Fire Protection System Repl - Information for Bidders: This document, titled 'Information for Bidders' (SBP-6.12, Rev 7/2025) for the RCC Fire Protection System Replacement project, outlines the bidding requirements for the State of Colorado Office of the State Architect. It provides critical instructions on bid form submission, bid security (5% for bids over $50,000), the 'or equal' substitution process, and the method of award based on the lowest responsible bidder, including the handling of additive and deductible alternates.
PDF
PDF, Medium priority19 pages · contract-document
MediumAI Summary for SC-6.21 Contractor's Design/Bid/Build Agreement: State of Colorado Office of the State Architect State Buildings Program Contractor’s Design/Bid/Build (D/B/B) Agreement, State Form SC-6.21, revised 07/2026. This is a contract template/agreement for design-bid-build construction projects, including signature pages, recitals, parties, effective date provisions, and references to attached exhibits such as contractor bid, performance bond, payment bond, insurance certificates, prevailing wage determinations, apprenticeship certifications, and federal provisions.
PDF
PDF, Low priority2 pages · certification-form
LowAI Summary for Appendix E - Sample Apprenticeship Utilization Certifications: Sample apprenticeship utilization certification form for a construction project. It requests the general contractor to identify subcontractors by trade and certify compliance with Colorado C.R.S. § 24-92-115 (SB 19-196), including participation in registered apprenticeship programs and a minimum apprenticeship graduation record. The form also requires supporting documentation from the U.S. Department of Labor and includes agreement language regarding public posting, additional documentation, termination for falsified records, and possible debarment. No solicitation or award terms are included; this is a supporting compliance appendix/template.
PDF
PDF, Low priority6 pages · form
LowAI Summary for AR Form 300-27C Consent to Search Authorization and Registration: Colorado Department of Corrections AR Form 300-27C (03/01/24; Spanish version 04/01/25) is a consent-to-search and registration form for visitors entering DOC facilities or property. It lists contraband items, explains penalties for violations, and includes a declaration of consent and waiver, background check notice, and guest/vehicle/personal information fields for completion and signature.
PDF
PDF, Low priority1 page · other
LowAI Summary for Project 2025-031M25 - Planholder Agreement (Fire Protection System Replacement, RCC): A non-disclosure and reproduction agreement for the Rifle Correctional Center Fire Protection System Replacement project (2025-031M25). The document prohibits planholders from reproducing bid documents and requires the maintenance of a distribution log for any shared materials.
PDF
PDF, Low priority85 pages · contract-document
LowAI Summary for SC-6.23 General Conditions, Design/Bid/Build Agreement: State of Colorado Office of the State Architect State Buildings Program document SC-6.23 (Rev 02/2025), titled the General Conditions of the Contractor’s Design/Bid/Build Agreement. The content is a table of contents for the general conditions governing a construction contract, covering definitions, execution, communications, inspections, contractor supervision, materials, permits, safety, drawings and specifications, RFIs, submittals, testing, subcontracts, utilities, and related contract administration topics.
See attached Advertisement for Bids, Planholder Agmt, Consent to Search form, and all other documents pertinent to this solicitation.
Addendum No. 1 - *IMPORTANT* Bidder is reminded that it is a requirement to acknowledge receipt of all addendums, to include this one, on their Bid Form