This Government Contract opportunity from Massachusetts was posted on April 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Culvert Crossing with Steel Casing and Concrete Piers

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237120
New
International
EXCAVATION AND BACKFILLING OR JOINTS REPAIR WORK OF KWSC PIPELINE
Solicitation # Doc342127147
Pakistan Refinery Limited is seeking sources for the excavation and backfilling or joints repair work of the KWSC pipeline in Pakistan. The scope of work involves excavation across various surfaces including concrete, soil, rock, or roads, with an estimated total quantity of 24,000 square feet. Key technical requirements include backfilling in layers not exceeding 6 inches in depth, compacting to 95 percent ASHTO dry density, and performing dewatering as needed. The contractor is responsible for all barricading and shoring using planks and scaffolding in accordance with HSEQ and area standards. Payment for excavation will be based on actual work performed, subject to the satisfaction of the Engineer or Client Representative. Potential contractors are evaluated based on their company profile, legal status, and registration with local authorities such as FBR, SRB, EOBI, and SESSI. Critical evaluation criteria include a proven track record in the oil and gas industry, supported by a client list and official work orders. Applicants must demonstrate the availability of experienced staff and necessary equipment, provide their annual turnover and income tax return acknowledgments, and submit a comprehensive HSEQ competence policy. The solicitation, identified as Doc342127147, was posted on October 23, 2026, with a response deadline of November 4, 2026.
Pakistan Refinery Limited

POSTED

about 11 hours ago

DEADLINE

in 12 days
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a firm fixed-price contract set aside for small businesses. Located in Mather, California, the project involves comprehensive modifications to a 12,000 gallon jet fuel (F-24) horizontal aboveground storage tank and its surrounding infrastructure. Key technical requirements include installing a sampling gauge hatch and clock-type mechanical gauge, recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional site work encompasses repairing the remote containment basin drainage, replacing asphalt and concrete in the refueler parking and loading areas, replacing the POL Operation building and foundation, and installing a non-coalescing filter and water draw-off system. The scope also includes the design, construction, and testing of electrical components to relocate a generator. The contract is awarded based on the Lowest Price Technically Acceptable (LPTA) method, with a performance period of 365 calendar days following the notice to proceed. Compliance with UFC 3-460-03 and MIL-STD-161J is required, and the contractor must adhere to Davis-Bacon Act labor standards and Buy American clauses. Liquidated damages for delays are set at 1,070.00 dollars per calendar day. Quality control is emphasized through a multi-stage inspection process, including punch-out, pre-final, and final acceptance inspections. Proposals must be submitted in severable technical and pricing volumes, including a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases.
W071 Endist Omaha

POSTED

about 12 hours ago

DEADLINE

in 28 days
NAICS: 237120
New
Federal
Nelson Drive Fuel Tank Removal
Solicitation # 1240LT27Q0012
Solicitation 1240LT27Q0012 is a firm fixed price contract issued by the USDA Forest Service for the removal of two 300-gallon steel underground fuel storage tanks at the Nelson Drive housing complex on the Bridger-Teton National Forest in Wyoming. The scope of work includes the extraction and disposal of the tanks, the cleanup and disposal of contaminated soils, and potential surface restoration. The contractor is required to field verify all existing conditions before ordering products and must adhere to OSHA standards for excavation and shoring, as well as IDEQ and government regulations for waste hauling and disposal. The estimated period of performance is from June 1, 2027, to June 30, 2027. This project is a total small business set-aside under NAICS code 237120. Award will be made based on the lowest price technically acceptable (LPTA) criteria, evaluating technical capability through an experience questionnaire, a project-specific quality control plan, and a review of past performance. Required submissions include a technical narrative detailing the approach to tank removal and soil remediation, as well as the qualifications of key personnel. The contract mandates performance and payment bonds and compliance with the Davis-Bacon Act for wage requirements. Quotes were due by November 13, 2026, with a requirement to hold pricing firm for 90 calendar days.
Csa Intermountain 8 Usda-Fs

POSTED

about 12 hours ago

DEADLINE

in 21 days
NAICS: 237120
New
International
REPLACEMENT OF KWSC PIPELINE FROM KWSC VALVE PIT TOWARDS PRL 1000-RFT SECTION
Solicitation # Doc342008664
Pakistan Refinery Limited is seeking sources for the replacement of the KWSC pipeline from the KWSC valve pit towards the PRL 1000-RFT section. The scope of work involves comprehensive excavation and backfilling in various terrains, including concrete, soil, and rock, with a requirement for at least 25 manual test pits to identify underground utilities. Key technical specifications include backfilling compacted to 95% ASHTO dry density and the installation of heat or butt fusion joints in accordance with ASTM 2164. Additionally, the project requires the installation of an MS 16 inch diameter globe valve, which must be approved by the relevant PRL department prior to installation. The contractor is held to strict safety and quality standards, including the provision of hard barricades and safety signage every 50 feet, the use of steel scaffolding for shoring, and the installation of bores for dewatering. All machinery, cranes, and operators must be third-party certified. Evaluation of potential contractors will be based on company profile, corporate status, annual turnover, and proven experience within the oil and gas industry, including HSEQ competence and the availability of experienced staff and equipment. The final acceptance of the work is subject to the satisfaction of the Engineer or Client Representative following hydrotesting and a commissioning phase.
Pakistan Refinery Limited

POSTED

1 day ago

DEADLINE

in 13 days
NAICS: 237120
New
Federal
WH Ford RTC Fueling System Repairs
Solicitation # W9128F27RA054
Solicitation W9128F27RA054 is a firm fixed price contract issued by the Omaha District of the U.S. Army Corps of Engineers for fueling system repairs at the W.H. Ford Regional Training Center in Greenville, Kentucky. This project is a total small business set-aside under NAICS code 237120. The scope of work involves comprehensive repairs and upgrades to a fuel storage and dispensing facility, specifically focusing on two 10,000 gallon above ground storage tanks. Key tasks include repairing concrete and pavement, installing emergency fuel shutoff stations and leak detection equipment, recoating fuel system canopies and piping, replacing tank vents, improving grounding systems, and upgrading the automatic tank gauging system and associated controls. All work must be completed by June 18, 2027, with a proposed performance period of 410 calendar days. The government will award the contract using the Lowest Price Technically Acceptable (LPTA) source selection process. To be deemed technically acceptable, offerors must provide evidence of specialized experience through three to five completed projects from the last five years, a logical Gantt chart covering preconstruction, on-site construction, and post-construction phases, and a well-defined technical approach for construction and risk mitigation. The contract mandates strict adherence to EM 385-1-1 safety requirements, the Davis-Bacon Act, and Buy American regulations. Additionally, the contractor must ensure a minimum of 60 percent of total project solid waste is diverted from landfills. Proposals must be submitted in two separate volumes, keeping pricing information isolated from the technical submission.
W071 Endist Omaha

POSTED

3 days ago

DEADLINE

in about 1 month
NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
Solicitation W912HV26RA009, titled DESC2103C - Bulk Fuel Storage Tanks Phase II, is a construction project at Yokota Air Base, Japan, issued by the USACE Japan Engineer District. The project involves the construction of one 100,000-barrel cut-and-cover JP-8 storage tank featuring a reinforced concrete pump house with four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off pump. The scope includes the installation of a product saver tank, piping, valves, and vaults connecting to an existing filter separator building, as well as the integration of an automatic tank gauging system and control systems into the existing PLC and HMI infrastructure. The estimated project magnitude is between 7.5 and 15 billion Yen, with a performance period of 1,020 calendar days after the Notice to Proceed. This solicitation is restricted to local sources in Japan and utilizes the Lowest Price Technically Acceptable (LPTA) source selection process. To be eligible, offerors must be rated as acceptable in construction experience, system supplier subcontractor experience, and past performance. Specifically, prime contractors must demonstrate experience with fuel facility construction exceeding 1 billion JPY within the last 20 years. Proposals are due by January 25, 2027, and must be submitted via PIEE. The contract includes a priority rating of DO-C2 and specifies liquidated damages of 615,000 Yen per calendar day of delay. Compliance with EM 385-1-1 March 2024 safety procedures and the submission of a Contractor Quality Control Plan are mandatory requirements.
W2SN Endist Japan

POSTED

4 days ago

DEADLINE

in 3 months

AI Contract Overview

Show more

The contract involves constructing an above-grade culvert crossing using an 18-inch steel casing to house a pre-insulated 8-inch ductile iron pipe, supported by concrete piers for structural stability. The work requires precise installation methods to ensure long-term durability and protection of the buried pipe, with all materials meeting specified engineering and performance standards. The project is part of infrastructure development under NAICS code 237120, which covers water and sewer line and related structures construction, and is being managed by the Massachusetts agency DWWD4 - distribution. Bids must be submitted by May 14, 2026, and the work is to be performed at a location with zip code 02026. This is a subcontract opportunity, indicating the prime contractor will be responsible for overall project delivery while this bidder will fulfill specific construction tasks. The solicitation is posted on the CommBuys platform, and proposers are expected to adhere to all technical, safety, and compliance requirements associated with above-grade utility installations in Massachusetts. There is no set-aside designation, so all eligible contractors may respond.

General Info

Construction of above-grade culvert with steel casing and ductile pipe in Massachusetts, subcontracted.

Documents

This scope was carved out of BD-26-1986-DWWD1-DWWD1-128284.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Schoolmaster Lane Water Main Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → DWWD4 - distribution
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construct an above-grade culvert crossing using an 18-inch steel casing, pre-insulated 8-inch ductile iron pipe, and concrete piers.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS