Culvert Installation and Bridge Replacement Construction
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract entails the complete removal of an aging timber bridge and its replacement with a reinforced concrete pipe culvert, all within the original bridge footprint to minimize environmental disruption. The scope includes limited excavation to accommodate the new culvert and thorough site restoration to match surrounding conditions, ensuring compliance with ecological and regulatory standards. The work is designed to maintain structural integrity while reducing long-term maintenance needs and improving water flow functionality. Issued as a subcontract under NAICS code 237310 for Highway, Street, and Bridge Construction, this project is managed by the Fish and Wildlife, Region 2 - Northern Central office in Rancho Cordova, California. The solicitation was posted on July 1, 2026, and the performance location is within the agency’s jurisdiction in California. All activities must adhere to strict environmental protocols to protect local wildlife habitats and water resources, with no expansion beyond the existing infrastructure footprint permitted.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Documents
This scope was carved out of Dry Creek Road Bridge Replacement (Lake and Streambed Alteration Agreement EPIMS Notification No. SJN-65427-R2).
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
