Culvert Rehab on SD I-5

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 11 is forecasting a culvert rehabilitation project in San Clemente, San Diego County, identified by EA 11-2N304 and PID 1126000090. The scope of work involves the repair and maintenance of eight culverts along the I-5, spanning from 3.7 miles south of the Camino Real undercrossing to 0.1 miles north of the Cristianitos Road overcrossing. The primary method of repair will be the use of Cured-in-Place-Pipe Liner (CIPP), requiring the use of a vactor truck, a CCTV/Cure truck, and a service truck. The project is classified under NAICS code 237310 and has been determined to be categorically exempt under CEQA Class 1 and categorically excluded under NEPA, as the work involves existing public structures without expansion of use. All work must adhere to the Environmental Commitments Record. Petra Samira El Shammas, an Environmental Scientist, serves as the primary point of contact for the agency.

General Info

Caltrans District 11 will repair eight San Clemente culverts using CIPP liner technology.

Agency

California → Caltrans, District 11 - San Diego

Place of Performance

San Clemente, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 11 - San Diego
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 11 - San Diego
Office AddressN/A
Contacts
Petra Samira El ShammasEnvironmental Scientist

Full Description

Show more
A Culvert Repair Project on the I-5 at eight (8) locations spanning from 3.7 miles south of Camino Real undercrossing to 0.1 miles north of Cristianitos Road overcrossing in San Diego County. Project work consists of repairing 8 culverts via Cured-in-Place-Pipe Liner (CIPP). Equipment includes a vactor truck, CCTV/Cure Truck, and a Service truck.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
West Side Improvements - Bus Stops Package 1
Solicitation # 26-035
The City of Pueblo is soliciting bids for the West Side Improvements - Bus Stops Package 1 (Solicitation 26-035), a project focused on enhancing community connectivity and mobility. The scope of work involves the rehabilitation of 23 existing bus stops on the west side of Pueblo, including the installation of new concrete pads, sidewalks, curb and gutter, and ADA-compliant curb ramps. Additional improvements include the installation of new or replacement benches and illuminated bus stop signs, specifically utilizing Urban Solar PV Stop+ products. The project is funded through a Federal Highway Administration RAISE Grant and requires strict adherence to the Davis-Bacon Act for prevailing wages, Buy America/BABA requirements, and FHWA construction oversight standards. The contract will be awarded to the responsible bidder providing the lowest and most responsive bid. Key requirements for bidders include a bid security of 5 percent of the grand total bid and the submission of performance and payment bonds prior to the Notice to Proceed. The project has a completion timeline of 180 days, with work commencing within three calendar days of contract execution. Contractors must comply with various federal and local mandates, including EEO bulletin board postings, FFATA reporting, and City of Pueblo licensing and sales tax regulations. All materials and workmanship are guaranteed by the contractor and surety for two years following final acceptance.
Public Works

POSTED

about 13 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237310
New
SLED
8798
Solicitation # 8798
The Union Lindell Bridge Replacement is a federal construction project (STP-9901(663)) managed by the City of St. Louis Board of Public Service. The scope involves the reconstruction of the Union and Lindell Boulevard Bridge over Forest Park Parkway and the MetroLink Railway in St. Louis, Missouri. Key technical requirements include the installation of MSE retaining walls, steel H-piles, drilled shafts, and specific trackwork components such as transition tie spacing and rubberized gap fillers. The project is governed by a hierarchy of specifications, with Job Special Provisions taking precedence, followed by standards from the City of St. Louis, the Missouri Department of Transportation, and the Metropolitan St. Louis Sewer District. The contract carries a performance responsibility value of approximately 27.41 million dollars and a completion timeline of 452 working days, with liquidated damages set at 4,300 dollars per day. Bidders must provide a 5 percent bid deposit and ensure surety companies have a policyholder rating of A- or better and a financial rating of V or higher. Compliance requirements are extensive, including mandatory E-Verify participation, adherence to the Buy America Certification for iron and steel, and a ten-hour OSHA Construction Safety Program for on-site employees. Additionally, the project mandates strict adherence to Disadvantaged Business Enterprise (DBE) goals and the payment of the higher of the Missouri state or federal Davis-Bacon prevailing wage rates. Submissions must be made electronically via the Bid Express Online Portal, accompanied by a comprehensive package including a signed bid proposal, various affidavits, and detailed DBE participation forms. Final acceptance of the project is contingent upon meeting ADA and PROWAG standards, with specific quality control requirements for EPS fill and AASHTO accreditation for third-party concrete testing facilities.
City of St. Louis Board of Public Service

POSTED

about 14 hours ago

DEADLINE

in about 8 hours
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS