Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New York was posted on September 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CUNY John Jay College Haaren Hall Gymnasium Facilities Upgrade - Project No. 384400

Closed
2139140State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for the interior modernization of Building 262, as well as associated buildings 261 and 263, at the Federal Law Enforcement Training Center in Glynco, Georgia. This firm-fixed-price contract encompasses a comprehensive scope of work including the replacement of corridor and classroom flooring with composite modular materials, full restroom renovations involving new vanities and lavatories, and the installation of raised flooring with integrated electrical distribution for classrooms. Additional technical requirements include updating doors and life-safety components, repainting interior surfaces, replacing variable air volume (VAV) systems, upgrading lighting controls, and replacing classroom ceiling fans. The project has a performance period from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the Notice to Proceed. Award will be determined using a best-suited then negotiate methodology, evaluating past performance, corporate relevant experience, and price. To be eligible, offerors must achieve at least a satisfactory rating for past performance and an acceptable rating for corporate experience. The contractor is required to provide payment and performance bonds equal to 100 percent of the contract price and a bid guarantee of 20 percent of the bid price or 3 million dollars. All work must adhere to strict safety and security protocols, including background checks for personnel and compliance with the FLETC Hazardous Waste Management Plan.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 11 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The comprehensive scope of work includes selective demolition, building envelope repairs, new roofing with a 20-year warranty, and exterior wall system updates. Interior improvements involve reconfiguration, new finishes, and the installation of a full NFPA-compliant fire suppression system. Mechanical and electrical upgrades include new HVAC systems, rooftop air-handling units, air-cooled water chillers, exhaust extraction, compressed air systems, LED lighting with occupancy sensors, and updated electrical distribution and building automation controls. Site improvements consist of paving removal and replacement, drainage upgrades, and repairs to water, sanitary, and storm systems, alongside hazardous materials abatement. The contract is awarded based on the lowest price for two primary exhibit line items: ELIN 0001 for building renovation and ELIN 0002 for paving work. Proposals are due by November 23, 2026. Depending on the proposal value, bonding requirements range from a payment bond for projects over 35,000 dollars to a combination of bid, payment, and performance bonds for projects exceeding 150,000 dollars. The project is subject to the Davis-Bacon Act and ADA accessibility guidelines. Administration requires monthly invoicing via Wide Area Work Flow (WAWF) supported by specific NAVFAC forms and certifications. Quality control is managed through a three-phase process, with final acceptance contingent upon government inspections and functional testing of critical systems, such as a two-hour operating test for exhaust systems.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 16 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in 22 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge and requires the restoration of the first, second, and third floors to their original condition. The scope of work includes drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, and electrical repairs and vanity or cabinet replacement. All work must comply with NFPA-101 life safety codes, ADA, OSHA, and EPA regulations, as well as local Massachusetts building codes. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. Award will be based on best value, with evaluation weighted toward price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must be licensed contractors in the State of Massachusetts and provide a detailed cost breakdown for labor, materials, and equipment. Key requirements include a one-year workmanship guarantee, adherence to Davis-Bacon Act wage determinations, and specific automobile liability insurance minimums. Proposals are due by November 17, 2026, and must include a timeline for substantial completion and a 90-day bid guarantee.
Grafton Job Corps

POSTED

about 3 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Springdale Job Corps Center, operated by Career Systems Development Corporation for the U.S. Department of Labor, is seeking proposals for the interior renovation and repair of its North Wing dormitory in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to return them to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes the installation of drywall, joint finishing, and painting for approximately 300 square feet of floor area in utility rooms and hallways, along with the temporary disconnection and re-installation of HVAC equipment, water heaters, and furnaces. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100. Proposing contractors must provide itemized pricing, a detailed work plan addressing occupied-building protection, and evidence of relevant experience. Key requirements include the provision of payment and performance bonding for the full project value and proof of liability and worker's compensation insurance within ten days of award. A minimum one-year workmanship warranty is required upon final acceptance by CSD.
Career Systems Development Corporation

POSTED

about 3 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The Dormitory Authority of the State of New York (DASNY) is seeking Expressions of Interest (EOI) for the Haaren Hall Gymnasium Facilities Upgrade at CUNY John Jay College. This project, estimated to cost between $2,500,000 and $2,700,000, involves comprehensive updates to the gymnasium's functionality. The scope of work includes the full removal of existing wood flooring, installation of a vapor barrier and new maple hardwood flooring, and the application of NCAA-standard court markings and the college logo. Additional requirements include replacing wall protection padding, balcony soffit aluminum cladding, and selective door and frame replacements. The project also entails installing new powered telescoping bleachers and adding electrical receptacles and outlets in floor boxes within the main gymnasium. This solicitation serves as a qualification phase to establish a shortlist of bidders. Interested firms must submit a detailed EOI package by October 19, 2026, organized into ten specific tabs covering company profiles, five years of relevant experience, sample schedules, safety programs, team résumés, potential subcontractors, current workload, Experience Modification Rating (EMR), bonding capacity, and a certified NYS Vendor Responsibility Questionnaire (CCA-2). Evaluation will be conducted by a DASNY committee based on the first seven tabs. The contract includes specific socioeconomic goals, including a 45% minority and women workforce goal, an 18% MBE goal, a 12% WBE goal, and a 6% SDVOB goal. All submissions must be provided in PDF format via email to the designated procurement administrator.

General Info

DASNY seeks EOIs for CUNY John Jay gymnasium upgrades costing $2.5M to $2.7M.

Place of Performance

John Jay College, Harren Hall, 899 10th Avenue, New York, NY 10019, NY, USA

Set-Aside

NONE

Documents

2
PDF, High priority: read this firstrfi
High
PDF, High priority: read this first11 pages · rfi
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDormitory Authority of the State of New York
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Dominick DonadioSr. Procurement Administrator
Dominick DonadioSr. Procurement Administrator

Full Description

Show more
THIS SOLICITATION IS FOR EXPRESSIONS OF INTEREST (EOI) ONLY See the Eligibility Requirements further down in this document. The intent of this Project is to update the functionality of the Gymnasium which includes: Full removal of existing wood flooring in both Gymnasiums. After removal of existing wood flooring and prior to new wood flooring the existing concrete slab shall be prepped and vapor barrier to be installed. New maple hardwood flooring to be installed. New court markings in accordance with NCAA Standards is to be painted on new hardwood floor. John Jay College's Logo to be painted at center court. Remove and replace wall protection padding. Existing aluminum cladding at balcony soffit is to be removed and replaced with new aluminum cladding. Selective door & frame replacement throughout the Gymnasium. Doors are to be primed & painted where replacements are not taking place. Remove and replace bleachers with new telescoping bleachers with power. Provide new receptacles & outlets in floor box in main gymnasium. Estimated Cost Range for Scope of Work: $2,500,000 - $2,700,000. Bidders for the construction of this project will be selected only after the review and evaluation of the qualification packages received in response to this notice. Please note that the project drawings and specifications attached to DASNY’s website associated with this solicitation do not reflect 100% construction / bid documents. The documents provided are for reference only. Finalized construction / bid documents shall be distributed to the qualified contractors invited to bid. General Conditions for Construction dated February 4, 2026, will apply to the Contract Documents. The anticipated goals for EEO and M/WBE participation in the Work of the Contract are as follows: Percent of Total Work Force (EEO): Minority & Women Workforce Goal (for all trades) 45% Percent of Total Contract (M/WBE): Minority Business Enterprise Goal 18% Women's Business Enterprise Goal 12% Service-Disabled Veteran Owned Businesses 6% Please note the Owner will determine the goals for EEO and M/WBE participation when the finalized construction / bid documents are distributed to the qualified contractors invited to bid. Firms shall provide one (1) copy in pdf format of the EOI package via e-mail to contact@example.gov. Instructions for Submission of the EOI Packages: Each firm responding to this solicitation shall submit an EOI package organized and assembled in a clear, logical and professional manner consistent with the requirements set forth herein. Failure to comply with these instructions may render the submission non-responsive and subject to rejection. Each package shall be submitted with: A Cover Page that clearly identifies: The Legal Name of the Company submitting the EOI The Project Name for which the EOI is being submitted The Date of Submission Immediately following the Cover Page, the contractor shall provide a Table of Contents listing all Tabbed sections, exhibits and attachments contained in the submission with the corresponding page number. The EOI package shall be divided into clearly labeled tabbed sections, each separated by a Cover Sheet identifying the contents that follow. Tabs should correspond to the order of the items specified in the solicitation. All items outlined in each Tab must be provided. The Owner may reject any EOI package not prepared and submitted in accordance with the provisions as stated in this solicitation. Tabs must be in the following sequence: Tab 1 – Company Profile Provide a company profile that includes the following information: Company Contact – Name, Title, E-mail address, and Phone Number of primary point of contact for this project. Date Established – When the company was founded. Company Address – Primary business location. Ownership Information – Name and resumes of all principal owners. Client List – Summary of public and private sector clients. Employee Breakdown – Number of employees by role: Architects, Engineers, Project Managers, Administrative Staff, Superintendents and Foremen, Trade Laborers. Equipment - Overview of all equipment owned by the company. Self-Performed Services - Description of all services the company performs directly (not subcontracted). MWBE and SDVOB Certifications – Provide a copy of the company’s MWBE and/or SDVOB certifications (if applicable). Tab 2 – Experience Provide documentation showing a minimum of five (5) years of experience with projects similar in size, scope, and complexity to the one being proposed. Provide details for the five (5) relevant projects that have been completed- or substantially completed- within the last ten (10) years. For each project, include the following information: Name of the project designer Firm name and contact information Project title and location/facility Brief description of the project Total construction cost Construction start date Substantial completion date Indicate role as prime contractor or subcontractor Percentage of the work that was self-performed If applicable, also include a list of all DASNY projects completed within the last 5 years. Tab 3 – Project Schedules Provide three (3) sample project schedules for the same projects listed in Tab 2. These schedules should reflect projects of similar size, scope, and complexity to the referenced project. Tab 4 – Safety Program Provide the firm’s written safety program or site safety plan. Include the résumé of the person responsible for overseeing project safety. Tab 5 – Résumés Provide names and résumés for the proposed project team. Each résumé should demonstrate experience with at least one project of similar size, scope, and complexity to the referenced project. Team members should include, at minimum: Project Manager, Site Superintendent, Project Engineer, and Quality Control Representative. Tab 6 – Potential Subcontractors Provide a list of potential subcontractors for this project. For each potential subcontractor, identify anticipated M/WBE subcontract participation, the subcontractor’s trade, and brief description of their scope of work. Tab 7 – Anticipated Workload Provide a list other projects you firm will be working on during this project’s construction period. Include a statement explaining how your firm will successfully complete this project within the required timeframe. Tab 8 – Experience Modification Rating Provide a letter from your insurance provider indicating the firm’s Experience Modification Rating (EMR) over the past three (3) years. If your EMR is above 1.00, include a written explanation. Tab 9 – Bonding Capacity Provide a signed letter from a Surety Company attesting to your firm’s single, aggregate and available bonding capacity. If your available bonding capacity does not to meet the bonding requirements of this contract, you must explain how your firm will meet the bonding requirements. Tab 10 – NYS Vendor Responsibility Questionnaire Provide your online or hardcopy NYS Vendor Responsibility Questionnaire For-Profit Construction (CCA-2) certified within the last five (5) months. Firms shall provide the Certification page for the online version or the full questionnaire, if submitting a hardcopy. Eligibility/Qualifications Requirements/Preferences: Tabs 1 through 7 will be scored by a DASNY committee. Firms deemed qualified from this solicitation will be included on a short list and invited to submit a bid in the near future. Firms not following the EOI package requirements as noted shall be considered non-responsive to the advertisement. The construction contract will be held by DASNY. Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details. In accordance with State Finance Law § 139-j and § 139-k, this solicitation includes and imposes certain restrictions on communications between Dormitory Authority personnel and an Offerer during the procurement process. Designated staff for this procurement are: The Project Manager and contact@example.gov. Contacts made to other Dormitory Authority personnel regarding this procurement may disqualify the Offerer and affect future procurements with governmental entities in the State of New York. Please refer to the Authority's website (www.dasny.org) for Authority policy and procedures regarding this law, or the OGS website (www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil) for more information about this law. All proposers, domestic and foreign, must be in compliance with New York State business registration requirements. Contact the NYS Department of State regarding compliance. In addition, business entities proposing to provide professional engineering services must obtain a Certificate of Authorization to Provide Engineering Services in New York State from the State Education Department. Proposals must be submitted in the full legal name of the proposer, or the full legal name plus a registered assumed name of the proposer, if any.

More opportunities from Dormitory Authority of the State of New York

Same awarding agency

NAICS: 238210
New
SLED
SUNY University at Buffalo – South Campus Electrical Upgrades – Clement Hall Including Asbestos Abatement and Hazardous Materials Abatement
Solicitation # 2140477
The Dormitory Authority of the State of New York (DASNY) is soliciting bids for electrical upgrades at Clement Hall, located on the South Campus of the University at Buffalo. The project scope includes the one-for-one replacement of electrical panels throughout the building, replacement of lighting fixtures on all floors, and the installation of lighting controls and a new emergency lighting system with associated conduits and panels. Additionally, the project requires the abatement of asbestos and hazardous materials to facilitate these upgrades. The estimated cost for the work ranges between $1,250,000 and $1,750,000, with a contract term extending to August 4, 2028. Bidders must possess at least five years of experience in similar work and provide a list of five contracts of comparable size, scope, and complexity completed within the last ten years. Required submissions include the NY State Vendor Responsibility Questionnaire, contract security, and EEO/AA insurance. Entities providing professional engineering services must hold a New York State Certificate of Authorization. The procurement is subject to specific socioeconomic goals, including a 3.00% SDVOB goal and 5.00% goals each for MBE and WBE participation. Bids are due by December 16, 2026, at 2:00 PM. Prospective bidders are cautioned that the project is governed by revised General Conditions for Construction dated February 4, 2026.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
SLED
OMH St. Lawrence Psychiatric Center – St. Lawrence Children’s & Youth Facility Safety Office, Card Access, and CCTV /VMS Systems
Solicitation # 2140564
The Dormitory Authority of the State of New York is soliciting bids for safety and security improvements at the Children and Youth Facility, Building 202, located at the St. Lawrence Psychiatric Center. The project focuses on enhancing building access control, visitor processing, and overall operational security. Key deliverables include the construction of a new safety office with a visitor pass-through window, a secure revolving door, and a weather vestibule, as well as the development of separate secure entrances for visitors and employees. Technical upgrades include the installation of electronic card access systems, electronic door hardware, closed-circuit television cameras, and video management system equipment. The estimated construction cost ranges from $600,000 to $650,000 for the General Construction contract and $640,000 to $700,000 for the Electrical contract. Bidders must have at least five years of experience in similar work and provide a list of five contracts of similar size and complexity completed within the last ten years. All proposals must be submitted by December 15, 2026, under the proposer's full legal name. Compliance with New York State business registration is required, and entities providing professional engineering services must hold a Certificate of Authorization from the State Education Department. Procurement communications are strictly limited to the Project Manager and designated email to comply with State Finance Law. Bidders are responsible for reviewing the updated General Conditions for Construction dated February 4, 2026, and submitting required documentation, including the NY State Vendor Responsibility Questionnaire and EEO/AA insurance.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS