Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on March 25, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cured-In-Place Pipe (CIPP) Installation – 24" Diameter

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
DEMOLITION OF THE CAMP HILL SQUARE APARTMENTS
Solicitation # 2027-RFP-033
Solicitation 2027-RFP-033 is a request for proposals issued by the Housing Opportunities Commission of Montgomery County (HOC) for the demolition of the Camp Hill Square Apartments in Gaithersburg, Maryland. The project scope involves the demolition of five apartment buildings containing 51 vacant units and a management office, including the removal of all above-grade structures, slabs, foundation walls, footers, and lead walks. While above-grade utilities must be removed, underground utilities are to be capped or abandoned in place, and all asphalt, curbs, and gutters are to remain. Additionally, the contractor is responsible for removing dumped materials from the neighboring Emory Grove Village parcel. The initial period of performance is four months from the Notice to Proceed, and the contractor is responsible for obtaining all necessary raze permits and adhering to the Montgomery County Approved Sediment Control Plan. Proposals must be submitted via the OpenGov Procurement Portal by November 13, 2026, at 12:00 pm. Evaluation is points-based, with 20% of the score weighted toward the schedule and 15% toward the price proposal. Award criteria emphasize safety, expedited completion, and quality assurance. Mandatory requirements include 100% payment and performance bonds, comprehensive insurance, and strict adherence to HOC Contractor and Subcontractor Background Screening Requirements. Compliance with the HOC Works Program, Davis-Bacon Wages, Maryland Prevailing Wage Laws, and HUD certifications regarding debarment and suspension is required. Payment terms include a 30-day processing window following approval, with a 5% retainage held until final acceptance by HOC.
Real Estate

POSTED

about 6 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

This subcontract involves the installation of a 24-inch diameter Cured-In-Place Pipe liner for culvert repair under the California Department of Transportation. The project demands strict adherence to Caltrans specifications, with a particular focus on precise resin calibration and rigorous control over material thickness to ensure structural integrity. The opportunity was posted on March 25, 2024, with a response deadline of April 8, 2024. Classified under NAICS code 238910, the contract focuses on specialized pipe lining services to facilitate essential infrastructure repair.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 11A3904.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

SB Minor B - Culvert Repairs

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of 24-inch diameter CIPP liner for culvert repair requiring precise resin calibration, material thickness control, and compliance with Caltrans specifications.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Los Angeles County At Various Locations On Route 10 From 0.2 Mile West Of Francisquito Avenue Undercrossing To Fairplex Drive Overcrossing And On Route 57 From 0.3 Mile South Of Brea Canyon Road Undercrossing To Gladstone
Solicitation # 07-379904
Solicitation 07-379904 is a unit price construction contract issued by the California Department of Transportation for highway improvements in Los Angeles County. The project scope involves construction on State Highway Route 10, from 0.2 mile west of the Francisquito Avenue undercrossing to the Fairplex Drive overcrossing, and on Route 57, from 0.3 mile south of the Brea Canyon Road undercrossing to Gladstone. With an estimated project cost of 7.4 million dollars, the work encompasses roadway excavation, concrete removal, clearing and grubbing, and the implementation of drainage, utilities, and electrical systems. Key deliverables include pavement structural work and comprehensive traffic management, requiring the use of special portable freeway detour signs and changeable message signs to ensure the traveled way remains open when construction is not active. The contract mandates strict adherence to 2025 Standard Specifications and Standard Plans, with project plans approved on June 9, 2026. Bidders must submit responses by December 8, 2026. Compliance requirements include following Buy America/Build America standards for manufactured products, providing environmental product declarations for concrete and asphalt, and adhering to prevailing wage rates as determined by the California Department of Industrial Relations or the U.S. Secretary of Labor, whichever is higher. Quality control is emphasized through mandatory ACI Concrete Field-Testing Technician Grade 1 certification for personnel and rigorous testing of materials at METS. Additionally, the project requires a lead compliance plan and specific marking and labeling standards for steel barriers, connection bolts, and pavement markings.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS