Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Cured-in-Place Pipe (CIPP) Lining Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Cured-in-Place Pipe lining installation involves the trenchless rehabilitation of existing sewer mains for prime contractors on Gary Sanitary District projects in Indiana. The scope of work requires the installation of resin-impregnated flexible tubing for 190 linear feet of 15-inch diameter pipe located between Manhole No. 508 and No. 507. The contractor will utilize boiler and refrigerator trucks for the curing process and employ NASCO-standard CCTV for post-installation inspections. Final deliverables include the completed 190 linear feet of lined pipe and comprehensive digital video documentation of the work. The response deadline for this opportunity is November 19, 2026.

General Info

Documents

This scope was carved out of 2026-RFP-063.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

REQUEST FOR QUOTES SANITARY SEWER REPAIR AT 1608 Broadway

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIndiana → Engineering
ContactsNo contacts available
OfficeN/A
Organization / AgencyIndiana → Engineering
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs trenchless rehabilitation of existing sewer mains for prime contractors on Gary Sanitary District projects. Installs resin-impregnated flexible tubing for 190 linear feet of 15-inch diameter pipe from Manhole No. 508 to No. 507. Utilizes boiler/refrigerator trucks for curing and NASCO-standard CCTV for post-installation inspection. Delivers 190 linear feet of lined pipe and digital video documentation.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter, as well as 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include the installation of standard and doghouse manholes, interior drop assemblies, and the completion of the CSO regulator fit out and outfall. Site preparation tasks consist of clearing and grubbing over 5,100 square yards of wooded areas, seeding, fine grading, and select tree removal. Key project deliverables also include the implementation of a Stormwater Pollution Prevention Plan (SWPPP), geotechnical instrumentation and monitoring, and the maintenance of flows and bypass for all pipes and manholes. Specialized requirements include the procurement of railroad insurance.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, identified as Project No. SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days following the Notice to Proceed. The contract is administered by the City of Belmont with Willis Engineers serving as the representative. Award will be granted to the responsible bidder submitting the lowest responsive bid, with specific evaluation criteria focusing on bidder qualifications, financial ability, and the submission of required Good Faith Efforts and Table A forms. The project mandates strict adherence to ANSI/AWWA and ASTM standards for materials and requires performance and payment bonds. Additionally, the contract establishes socioeconomic participation goals, including an EPA MBE goal of 10.9 percent and a combined State of North Carolina MBE/WBE goal of 10 percent. Payment is processed via Applications for Payment and becomes due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking qualified DBE, MBE, WBE, and SBE subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of open and covered concrete structures, relining or replacing steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additional technical requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, motor control center component replacement, and modifications to sluice and slide gates. The project also encompasses the installation of access platforms, rerouting sump pump discharge lines, excavation, trench work, and surveying. This solicitation is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid for reimbursement. Requested services and supplies include lead abatement, rebar, metals fabrication, painting, trucking, concrete resurfacing, and FRP reinforcing systems. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026.
Garney Pacific, Inc.

POSTED

about 4 hours ago

DEADLINE

in 19 days
View Details

More opportunities from Indiana → Engineering

Same awarding agency

New
SLED
REQUEST FOR QUOTES SANITARY SEWER REPAIR AT 1608 Broadway
Solicitation # 2026-RFP-063
Solicitation 2026-RFP-063 is a request for quotes from the Gary Sanitary District for sanitary sewer repairs located at 1608 Broadway in Gary, Indiana. The project consists of two primary technical components: a point repair involving the removal and replacement of approximately 30 linear feet of 15-inch diameter pipe with PVC SDR 35 from Manhole No. 508 toward Manhole No. 507, and the installation of 190 linear feet of Cured-in-Place Pipe (CIPP) lining between the same two manholes. The contractor is responsible for providing all labor, materials, and specialized equipment, including Vactor, CCTV, boiler, and refrigerator trucks, as well as steel excavation shielding and laser alignment tools. All work must adhere to the City of Gary Sewer and City Infrastructure Standards and Specifications Manual, with specific requirements for watertight connections and NASCO-standard CCTV inspections. The contract will be awarded to the lowest proposer who can meet the project timeline, which requires completion within 30 days of the Notice to Proceed unless an alternative schedule is approved. Bidders must submit a lump sum proposal by November 19, 2026, via the OpenGov portal or in a sealed envelope. Mandatory submission requirements include a certificate of insurance, valid contractor and business licenses, diversity certifications, and signed contractor compliance documents. The selected contractor must secure all necessary stormwater, street closing, and road cut permits and provide a one-year roadway guarantee following the replacement. Administrative oversight is managed by the Procurement Manager and the Engineering Department, with strict requirements for weekly certified payrolls and digital video documentation of the work.

POSTED

about 14 hours ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS