Concrete Flatwork and Specialty Concrete

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Concrete Flatwork and Specialty Concrete involves the installation of concrete sidewalks, curbs, and decorative elements for prime contractors working on City of Carmel intersection projects. The scope of work includes pouring multi-use paths, Type II/III curbs, and 16 inch decorative PCCP for truck aprons, all of which must adhere to ADA 2010 standards. The project is categorized under NAICS code 238110 and is managed by the Engineering agency in Indiana. Interested parties must submit their responses by the deadline of November 18, 2026, at 3:00 PM.

General Info

Subcontract for ADA concrete flatwork in Carmel, Indiana; responses due November 18, 2026.

Documents

This scope was carved out of 24-ENG-02.

The full solicitation package (20 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Intersection Improvements - 106th Street & Lakeshore Drive East

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIndiana → Engineering
ContactsNo contacts available
OfficeN/A
Organization / AgencyIndiana → Engineering
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs concrete sidewalks, curbs, and decorative elements for prime contractors on City of Carmel intersection projects. Pours multi-use paths, Type II/III curbs, and 16" decorative PCCP for truck aprons per ADA 2010 standards. Delivers completed sidewalks and curbs.

Similar Contracts

Same NAICS industry code

More opportunities from Indiana → Engineering

Same awarding agency

New
SLED
REQUEST FOR QUOTES SANITARY SEWER REPAIR AT 1608 Broadway
Solicitation # 2026-RFP-063
Solicitation 2026-RFP-063 is a request for quotes from the Gary Sanitary District for sanitary sewer repairs located at 1608 Broadway in Gary, Indiana. The project consists of two primary technical components: a point repair involving the removal and replacement of approximately 30 linear feet of 15-inch diameter pipe with PVC SDR 35 from Manhole No. 508 toward Manhole No. 507, and the installation of 190 linear feet of Cured-in-Place Pipe (CIPP) lining between the same two manholes. The contractor is responsible for providing all labor, materials, and specialized equipment, including Vactor, CCTV, boiler, and refrigerator trucks, as well as steel excavation shielding and laser alignment tools. All work must adhere to the City of Gary Sewer and City Infrastructure Standards and Specifications Manual, with specific requirements for watertight connections and NASCO-standard CCTV inspections. The contract will be awarded to the lowest proposer who can meet the project timeline, which requires completion within 30 days of the Notice to Proceed unless an alternative schedule is approved. Bidders must submit a lump sum proposal by November 19, 2026, via the OpenGov portal or in a sealed envelope. Mandatory submission requirements include a certificate of insurance, valid contractor and business licenses, diversity certifications, and signed contractor compliance documents. The selected contractor must secure all necessary stormwater, street closing, and road cut permits and provide a one-year roadway guarantee following the replacement. Administrative oversight is managed by the Procurement Manager and the Engineering Department, with strict requirements for weekly certified payrolls and digital video documentation of the work.

POSTED

about 14 hours ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS