Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

REQUEST FOR QUOTES SANITARY SEWER REPAIR AT 1608 Broadway

Active
2026-RFP-063State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation 2026-RFP-063 is a request for quotes from the Gary Sanitary District for sanitary sewer repairs located at 1608 Broadway in Gary, Indiana. The project consists of two primary technical components: a point repair involving the removal and replacement of approximately 30 linear feet of 15-inch diameter pipe with PVC SDR 35 from Manhole No. 508 toward Manhole No. 507, and the installation of 190 linear feet of Cured-in-Place Pipe (CIPP) lining between the same two manholes. The contractor is responsible for providing all labor, materials, and specialized equipment, including Vactor, CCTV, boiler, and refrigerator trucks, as well as steel excavation shielding and laser alignment tools. All work must adhere to the City of Gary Sewer and City Infrastructure Standards and Specifications Manual, with specific requirements for watertight connections and NASCO-standard CCTV inspections. The contract will be awarded to the lowest proposer who can meet the project timeline, which requires completion within 30 days of the Notice to Proceed unless an alternative schedule is approved. Bidders must submit a lump sum proposal by November 19, 2026, via the OpenGov portal or in a sealed envelope. Mandatory submission requirements include a certificate of insurance, valid contractor and business licenses, diversity certifications, and signed contractor compliance documents. The selected contractor must secure all necessary stormwater, street closing, and road cut permits and provide a one-year roadway guarantee following the replacement. Administrative oversight is managed by the Procurement Manager and the Engineering Department, with strict requirements for weekly certified payrolls and digital video documentation of the work.

General Info

Request for quotes for sanitary sewer pipe repairs and CIPP lining in Gary.

NAICS

N/A

Place of Performance

IN, USA

Set-Aside

NONE

Documents

3

2026-RFP-063: Sanitary Sewer Repair at 1608 Broadway

PDF, High priority: read this firstrfp
High

Sanitary Sewer Repair at 1608 Broadway

PDF, High priority: read this firstrfq
High

1608_Broadway_CCTV_videos.msg

MSG

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIndiana → Engineering
Contacts2 people available
OfficeGary, IN, 46406, USA
Organization / AgencyIndiana → Engineering
Office AddressGary, IN, 46406, USA
Contacts
Jabez AndersonAssistant Manager of Engineering
Bryan CosseyProcurement Manager

Interested Companies (6)

LGS PlumbingCrown Point, IN
METZ Sewer Plumbing & PumpingGary, IN
Gariup ConstructionGary, IN

See All 6 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
POINT REPAIR Remove and replace existing 15-inch diameter pipe with 15-inch diameter PVC SDR 35 ± 30-linear feet from Manhole No. 508 going towards Manhole No. 507. Contractor shall ensure pipe penetrations are sealed and watertight. Contractor shall connect new pipe to existing good pipe with a watertight connection. Connect new pipe to existing PVC pipe with neoprene rubber coupling with stainless steel straps or coupling provided by the manufacturer and approved by the owner. When adjoining new pipe to existing, the maximum space between the abutting pipes shall be 1/8 inches or less. CIPP LINING CIPP line existing 15-inch diameter pipe x 190 linear feet starting from Manhole No. 508 to Manhole No. 507. The CIPP liner shall extend 4-inches into existing manholes. The Contractor shall install a pre-liner and/or perform chemical grouting of infiltration points as necessary

More opportunities from Indiana → Engineering

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS