Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Georgia was posted on July 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cured-in-Place Pipe (CIPP) Lining Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The JCSD Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is being managed by Filanc and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is extensive, encompassing pipeline infrastructure such as welding, cathodic protection, valves, and jack and bore operations, as well as civil engineering tasks including paving, striping, flatwork, precast vaults, fencing, and potholing. Additionally, the project requires technical services for surveying, settlement monitoring, videography, E&IC, and environmental management through SWPPP implementation and asbestos pipe demolition and removal. This solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, with a strong emphasis on the participation of SBE, MBE, and WBE entities. Filanc has indicated a willingness to assist qualified diverse firms with bonding, insurance, and equipment to encourage participation. Bids and quotes for the various project scopes must be submitted by 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications through Julia Masaitis.
Filanc

POSTED

about 10 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The contract involves the installation of cured-in-place pipe (CIPP) lining to rehabilitate existing sanitary sewer lines in the City of Ringgold, Georgia, using a no-dig method that eliminates the need for excavation. The scope includes thorough cleaning and inspection of the current sewer infrastructure followed by the application of CIPP lining to restore structural integrity and functionality. The work must be performed in compliance with industry standards for trenchless rehabilitation, ensuring minimal disruption to public areas and utilities. All activities are to be completed without disturbing surface conditions, and the project emphasizes long-term durability and flow efficiency of the renewed sewer system. The solicitation is classified as a subcontract with a NAICS code of 237110, indicating it falls under sewer and wastewater collection system construction. The response deadline is July 30, 2026, and the opportunity was posted on July 1, 2026. The contract is managed by the City of Ringgold through the Georgia Department of Administrative Services, and performance is expected to occur within the city limits. Contractors must be prepared to meet technical specifications for CIPP application, adhere to safety protocols, and complete all work within the designated timeline without requiring extensive surface disruption.

General Info

CIPP lining installation for Ringgold, GA sewer lines using no-dig method, compliant with trenchless standards, due July 30, 2026.

Agency

Georgia → City of RinggoldView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of PE-62351-NONST-2026-000000025.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

SEWER REHABILITATION 2026 PROJECT

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Ringgold
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → City of Ringgold
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of cured-in-place pipe (CIPP) lining for rehabilitation of existing sanitary sewer lines, including cleaning, inspection, and relining without excavation.

More opportunities from Georgia → City of Ringgold

Same awarding agency