This Government Contract opportunity from Georgia was posted on June 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Cured-in-Place Pipe (CIPP) Sewer Rehabilitation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the installation of 1,800 linear feet of 8-inch cured-in-place pipe (CIPP) for sewer rehabilitation, encompassing all necessary phases including preliminary cleaning of the existing sewer line, insertion of the flexible liner, and thermal or UV curing to form a seamless, durable inner pipe. The project requires full compliance with industry standards for rehabilitation, with post-installation testing to ensure structural integrity and leak-free performance. All work must be completed in accordance with technical specifications governing CIPP applications, including surface preparation, resin application protocols, and curing cycle controls to guarantee long-term functionality. The contract is classified as a subcontract under NAICS code 238990, issued by the City of Barnesville in Georgia, with a response deadline of July 28, 2026. While the solicitation number and detailed point of contact are not provided, the posting date of June 24, 2026 indicates a standard procurement timeline allowing bidders approximately five weeks to prepare and submit proposals. The place of performance is located within the jurisdiction of the City of Barnesville, though specific address details are not disclosed. Bidders must be prepared to meet all local code requirements and demonstrate proven experience in CIPP sewer rehabilitation projects, with an emphasis on safety, minimal disruption to surrounding infrastructure, and adherence to environmental regulations during all phases of the work.
General Info
Agency
NAICS
Place of Performance
GA, USASet-Aside
Documents
This scope was carved out of PE-68550-NONST-2026-000000011.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
2025 CDBG Water & Sewer System Improvement
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
