Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Custom Acrylic Reception Counter Installation

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → FA2543 460 ConsView Agency

NAICS

327399

Place of Performance

Aurora, CO, 80011, USA

Set-Aside

SBA

Documents

This scope was carved out of FA254326Q0035.

The full solicitation package (11 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ODR Countertop & Cabinets Replacement

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2543 460 Cons
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FA2543 460 Cons
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Procurement and installation of an ADA-compliant L-shaped acrylic reception counter with waterfall edge, including 30" high ADA section between two 42" high caps and 4" backsplash.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → FA2543 460 Cons

Same awarding agency

NAICS: 238220
New
Federal
Buckley SFB - BDOC Chiller Replacement
Solicitation # FA254326Q0027
Solicitation FA254326Q0027 is a 100 percent small business set-aside for the replacement of the chilled water system at Building 1028 (BDOC) at Buckley SFB in Aurora, Colorado. The project requires the decommissioning and removal of the existing chiller and two computer room air handlers (CRAHs), followed by the installation of a new Trane-series chiller system in accordance with Air Force Civil Engineering standardization guidance. The contractor must provide temporary cooling to maintain server room operational temperatures and ensure the new system does not exceed the existing concrete pad load capacity of 12,000 lbs. All work must be completed within 30 calendar days after receipt of order, with deliverables including as-builts, O&M manuals, and a commissioning report. The government will award a fixed-price contract using the Lowest Price Technically Acceptable (LPTA) evaluation method. To be considered responsive, offerors must submit a price quote, a technical description of the work plan, warranty details, and two past performance citations demonstrating the installation of Trane chiller equipment on government installations within the last five years. A formal site visit is scheduled for September 1, 2026, and all final quotes must be submitted via email to the Contracting Officer and Contract Specialist by 1000 MDT on September 9, 2026. Payment will be processed electronically through the Wide Area WorkFlow (WAWF) system.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 337214
New
Federal
Mobile Aisle System
Solicitation # FA2543SM004
Solicitation FA254326Q0032 is a 100 percent small business set-aside for the procurement of two high-density industrial mobile aisle shelving systems for the U.S. Air Force Office of Special Investigations at Buckley SFB, Colorado. The project requires the contractor to disassemble and legally dispose of existing shelving and install two new modular systems with a maximum footprint of 21 feet long, 12 feet wide, and 9 feet high. These systems must feature a manual, mechanical-assist drive, master locking mechanisms, heavy-duty locking clips, and solid end panels to ensure the safe storage of technical equipment. Each shelf tier must support a minimum of 150 pounds and accommodate items between 15 and 36 inches in height. The government intends to award a fixed-price contract based on the Lowest Price Technically Acceptable (LPTA) evaluation method. To be considered responsive, offerors must provide a price quote, a detailed technical description of how they will meet the Statement of Need, warranty details, and valid CAGE or UEI information. The entire project, including delivery and installation, must be completed within 120 calendar days after receipt of award, with all work performed during normal duty hours. The contractor must provide a minimum one-year warranty and use the Wide Area WorkFlow system for electronic invoicing. Quotes are due by 13:00 MDT on September 4, 2026.
Office Furniture (except Wood) Manufacturing

POSTED

1 day ago

DEADLINE

in 2 days
View Details