Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Connecticut was posted on June 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Custom Aluminum Fixed Ladder Fabrication and Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves the design, fabrication, and installation of a custom 24-foot fixed ladder made from 6061 aluminum alloy. The ladder will feature 1-inch diameter rungs spaced 12 inches apart, with side rails extending 42 inches, ensuring it meets OSHA safety standards. The work falls under the NAICS code 332312, which pertains to fabricated structural metal manufacturing. Issued by the Connecticut Water and Sewer agency, this subcontract opportunity was posted on June 4, 2026, with a response deadline set for June 23, 2026. The contract focuses on a specialized fabrication project aimed at producing a durable, compliant ladder using high-quality materials suitable for the intended environment. Further details and submission access are available through the agency's procurement portal.

General Info

Design, fabricate, install 24-foot OSHA-compliant aluminum ladder for Connecticut Water and Sewer.

Documents

This scope was carved out of 25/26-68.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

DAVIT CRANE FALL PROTECTION SYSTEM AT HRWPCF

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → Water and Sewer
ContactsNo contacts available
OfficeN/A
Organization / AgencyConnecticut → Water and Sewer
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design, fabricate, and install a 24-foot custom aluminum fixed ladder with 1" diameter rungs, 12" spacing, and 42" side rail extension using 6061 alloy for OSHA compliance.

More opportunities from Connecticut → Water and Sewer

Same awarding agency

NAICS: 237110
SLED
FURNISH AND INSTALL INSERTS FOR SIPHONS 1 & 3 AT GLOBE HOLLOW WATER TREATMENT FACILITY
Solicitation # 26/27-17
The Town of Manchester, Connecticut, is soliciting proposals for solicitation number 26/27-17 to furnish and install inserts for Siphons 1 and 3 at the Globe Hollow Water Treatment Facility. The scope of work includes the repair of the trough discharge point, including all necessary piping, fittings, supports, and seals to ensure a watertight and serviceable discharge consistent with previously repaired siphons. All materials used must be equal or superior to those used on Siphons 2 and 4 and must be NSF/ANSI 61-compliant for potable water service. The project requires a phased approach where Siphon 1 must be tested and operational for one week before work begins on Siphon 3. Proposals are due by November 17, 2026, via the OpenGov portal. The award will be based on a weighted evaluation of price (50%), project schedule (25%), and familiarity with the Globe Hollow Water Treatment Plant (25%). Bidders must provide a bid bond or cashier's check for 5% of the total bid and must be prepared to provide performance and labor and materials bonds equal to 100% of the contract price upon award. Compliance with Connecticut prevailing wage laws and OSHA 10-hour construction safety certification for all employees is mandatory. Required submission documents include a current W-9, SAM registration number, FEIN/EIN, a five-year project history, and a detailed project approach.
Water and Sewer Line and Related Structures Construction

POSTED

9 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS