Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on August 12, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Dakota Prairie Grasslands - Mikes Creek/Blacktail Juniper Mastication Project

Awarded
1240LN22Q0056Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
Federal
Wisconsin - East Zone Gravel Pit NNIS Treatment Amendment 2: RFQ for 12363N26Q4152 This is for the Land Management Integrated Resources BPA only
Solicitation # 12363N26Q4152
The USDA Forest Service is issuing a BPA Call Order for NNIS treatment at gravel pit sites in the East Zone of Wisconsin under the Land Management Integrated Resources BPA, which is a nationwide multiple-award contract encompassing professional services, natural resource restoration, engineering, and project management. This procurement is restricted to the 39 pre-approved contractors already on the LMIR BPA, and the call order will be distributed exclusively via email to those listed entities; no public solicitation or proposal submissions are being accepted in response to this notice. The requirement is not set aside for any specific small business classification, though small businesses are preferred. The solicitation number is 12363N26Q4152, with a response deadline of June 15, 2026, and the NAICS code 115310 applies to this work. The procurement is administered by the Stewardship Contracting Branch of the USDA Forest Service, with primary point of contact Chad Bullock and secondary contact Jim Kaminski, both reachable via email. Any contractor wishing to join the LMIR BPA may submit proposals at any time before the BPA’s expiration by contacting the listed email addresses, as the BPA remains open for continuous pre-solicitation inclusion through SAM.gov using solicitation number 12363N23Q4152.
Stewardship Contracting Branch Usda-Fs

POSTED

about 11 hours ago

DEADLINE

in 6 days
NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 22 hours ago

DEADLINE

in 6 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 22 hours ago

DEADLINE

in 3 days
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning (PCT) contracts in the McAllister Creek area on the Colville Indian Reservation. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit SP-16-PCT-27 (13.44 acres). The scope of work requires the selection and retention of the most vigorous trees, strict slash management including clearing roadways and streams, and the removal of all foreign debris. Contractors must adhere to specific technical standards, such as maximum stump heights of one-half the stump diameter and a maximum slash height of 24 inches, with financial penalties of 3 dollars per tree for damage to leave trees. Bids must be physically submitted to the mailbox at the Mt Tolman Complex by 4:00 PM on November 17, 2026, as electronic submissions are prohibited. A complete bid packet must include a bid sheet, bid evaluation form, a detailed work plan, TERO compliance and utilization forms, and a signed debarment certification. Award decisions are based on the contractor being responsive and responsible, though the lowest bid is not guaranteed to be accepted. Payment is issued per completed and accepted acre, with 20 percent of each payment withheld until final acceptance. Contractors are required to provide liability insurance and comply with TERO Title X and TOSHA safety regulations.
Confederated Tribes of the Colville Reservation

POSTED

about 22 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The Dakota Prairie Grasslands Mikes Creek/Blacktail Juniper Mastication project, solicitation 1240LN22Q0056, is a total small business set-aside contract under NAICS 115310. The project requires the provision of all materials, equipment, labor, and supplies to perform mechanical thinning and mastication of juniper across 2,506 acres northwest of Belfield, North Dakota, within the Medora Ranger District. The work is divided into five units, specifically Mikes Creek 6-7 and Blacktail 1-3, with a period of performance from September 1, 2022, through April 30, 2023. Technical requirements mandate the mastication of at least 90 percent of juniper greater than one foot in height per unit, while retaining juniper on north slopes exceeding 30 percent in designated islands. To prevent downstream culvert plugging in the Mikes Creek and Blacktail drainages, material must be cut into pieces no longer than two feet, and all juniper within 10 feet of stream channels must remain standing. In areas inaccessible to machinery, which may comprise up to 20 percent of the total area, hand lop-and-scatter methods are required. The contract is subject to Department of Labor Wage Determination 1991-0354, as updated by Amendment 001.

General Info

Contract Value

$421,008

NAICS

115310 - Support Activities for Forestry

Place of Performance

5820, ND, 58622, USA

Set-Aside

SBA

Award Issued Date

Documents

9

1240LN22Q0056 - Mikes Creek/Blacktail Juniper Mastication Project

PDF, High priority: read this firstrfq
High

Amendment 001 to Solicitation 12401N22Q0056

PDF, High priority: read this firstamendment
High

Blacktail and Mikes Creek Juniper Mastication Vicinity Map

PDF, High priority: read this firstspecifications
High

Blacktail Juniper Reduction Project Map

PDF, High priority: read this first1 page · specifications
High

Mikes Creek Juniper Reduction Project Map

PDF, High priority: read this firstspecifications
High

Summary Information Chart - Mikes Creek/Blacktail Fuels Treatments

PDF, High priority: read this first1 page · specifications
High

USDA Forest Service Experience Questionnaire (1240LN22Q0056)

PDF, High priority: read this firstpast-performance
High

Wage Determination 1991-0354, Revision 54 - North Dakota

PDF, High priority: read this firstwage-determination
High

Wage Determination No. 1991-0354 (Revision 55) - North Dakota

PDF, High priority: read this firstwage-determination
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Fs Dakota Prairie Grasslands
Contacts1 person available
OfficeBISMARCK, ND, 58501, USA
Office AddressBISMARCK, ND, 58501, USA

Full Description

Show more
Furnish all necessary materials, equipment, labor, supplies, and incidentals needed to perform the Mikes Creek/Blacktail Juniper Mastication project . The project area is northwest of Belfield, North Dakota. See attached vicinity and project maps. Unit of Measure: Acres Number of Acres: 2,506 Period of Performance: 09/01/2022 through 4/30/2023 Masticating at least 90% of juniper per unit, greater than 1 foot, retaining juniper on north slopes greater than 30% (leave islands/areas will be identified). Depending on the type of equipment used, up to 20% of the area may not be accessible by equipment, areas that cannot be accessed by mastication equipment need to be lop and scattered by hand. Material in the Mikes Creek and Blacktail drainages needs to be cut into pieces 2 long to keep from plugging the culverts downstream. Juniper within 10 of the stream channel will be left standing. Amendment 001 - Updates wage determination and corrects completion date to 4/30/2023.

More opportunities from Department Of Agriculture → USDA Fs Dakota Prairie Grasslands

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS