This Solicitation opportunity from Texas was posted on September 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract involves hiring a contractor to perform essential repairs and maintenance at Dallas Love Field Airport's Garages A & B, focusing on water infiltration issues, expansion joint repairs, concrete crack repairs, and the application of new traffic coatings. The goal is to improve the garages' overall functionality, safety, durability, and visual appearance while ensuring that construction activities are phased to avoid disrupting garage operations. The project is significant, with an estimated value ranging from five to ten million dollars, and it emphasizes careful planning to maintain ongoing parking services during construction.
The solicitation, titled "Dallas Love Field Garages A & B Repairs Re-bid," was posted on September 26, 2025, with a response deadline of October 31, 2025. It is issued by the City of Dallas, Texas, under NAICS code 332312, which pertains to fabricated structural metal product manufacturing. The project is managed by a State and Local Government Entity (SLED), and interested contractors can find more details and submit proposals through the provided online link. The contract aims to ensure the garages are maintained to high standards, supporting their continued safe and efficient operation.
HighAI Summary for Addendum No. 1 for RFB CIZ25-AVI-3196 Dallas Love Field Garages A & B Repairs Re-Bid: This document is Addendum No. 1 dated October 20, 2025, for the Request for Bid (RFB) CIZ25-AVI-3196 concerning repairs for Dallas Love Field Garages A & B. It provides official responses, clarifications, and changes to the original solicitation. Key content includes answers to bidder questions about forms, submission formats, and pre-bid meeting attendance. It also notifies that the Local Preference form is not applicable and has been omitted. The addendum includes the pre-bid meeting attendance sheets and presentation, uploaded to the Bonfire portal, and clarifies acceptable submission formats for certain forms. The document serves to update bidders with critical procedural and submission information for the bid due October 31, 2025.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 2 for Dallas Love Field Airport Garages A & B Repairs Re-Bid: This document is Addendum No. 2 dated October 21, 2025, for Bid No. CIZ25-AVI-3196 concerning the Dallas Love Field Airport Garages A & B Repairs Re-Bid. It provides official responses, clarifications, and modifications to the original Request for Bid (RFB). Key content includes answers to bidder questions about material substitutions, employee badge and background check requirements, coating thickness standards, phasing plans, and dumpster placement. The addendum also replaces four specification pages and instructs bidders to consider these changes in their submissions. The document references the original RFB and previous addenda, maintaining their validity except where modified by this addendum.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 3 to RFB CIZ25-AVI-3197 Dallas Love Field Airport Garages Repairs: This document is Addendum No. 3 dated October 24, 2025, for the Request for Bid (RFB) CIZ25-AVI-3197 concerning repairs to Dallas Love Field Airport Garages A & B. It provides official responses to bidder questions, clarifications, and modifications to the original solicitation. Key content includes working hour restrictions, project duration (180 calendar days), phasing plans, alternates clarification, tax exemption status, badging and background check requirements, permit responsibilities, and details on traffic coating and liquidated damages. The addendum instructs bidders to consider these changes when preparing their bids and confirms no extension of the bid due date.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 4 (Final) for RFB CIZ25-AVI-3197 Dallas Love Field Airport Garages Repairs: This document is Addendum No. 4 (Final) dated October 27, 2025, for the Request for Bid (RFB) CIZ25-AVI-3197 concerning repairs at Dallas Love Field Airport Garages A & B. It modifies the original RFB by providing official responses, clarifications, and changes. Key content includes removal of a required EPA and Texas Commission environmental affidavit form (though a notarized Environmental Record Affidavit remains required), detailed Q&A addressing material alternates, quantity corrections, unit price clarifications, and substitution approvals. The addendum instructs bidders to consider these changes in their submissions and confirms that all prior documents remain in effect except as modified herein.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 4 (Final) RFB CIZ25-AVI-3197 Dallas Love Field Airport Garages Repairs: This document is Addendum No. 4 (Final) dated October 27, 2025, for the Request for Bid (RFB) CIZ25-AVI-3197 concerning repairs to Dallas Love Field Airport Garages A & B. It modifies the original RFB by providing official responses, clarifications, and changes. Key content includes removal of a required EPA and Texas Commission on Environmental Quality affidavit form (though notarized Environmental Record Affidavit remains required), detailed Q&A addressing material alternates, repair quantity corrections, unit price clarifications, substitution approvals, and coordination requirements. The addendum instructs bidders to consider these changes in their submissions and confirms that all prior documents remain in effect except as modified herein.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for City of Dallas Building Construction Services Contract: This document is a Building Construction Services Contract for the City of Dallas, Texas. It outlines the contractual relationship between the City (Owner) and the Contractor for a construction project, including contract documents, terms, contract time with liquidated damages, performance and payment bonds, contract sum, progress payments, and conflict of interest provisions. The contract references the City of Dallas General Conditions for Building Construction and includes clauses on compliance with equal employment opportunity and surety requirements. It is a sample contract form that may vary depending on the scope of services.
PDF
PDF, High priority: read this firstsow
HighAI Summary for City of Dallas Environmental Best Management Practices for Construction Projects: This document outlines the City of Dallas Environmental Best Management Practices (BMP) for contractors involved in construction projects. It includes the City's environmental policy, contractor responsibilities, compliance requirements, and detailed BMPs such as erosion and sediment control, soil conservation, waste management, spill response, and emission reduction strategies. Contractors must review and sign an acknowledgment form before starting work. The document supports environmental stewardship and regulatory compliance aligned with ISO 14001:2015 standards, aiming to minimize environmental impacts during construction activities.
PDF
PDF, High priority: read this firstconflict-of-interest-questionnaire
HighAI Summary for Conflict of Interest Questionnaire and Disclosure Requirements - City of Dallas: This document outlines the City of Dallas' requirements for vendors to file a Conflict of Interest Questionnaire in compliance with Texas Local Government Code Chapter 176. It explains the legal obligations under House Bill 914 and details the information vendors must disclose about business relationships with local government officers, including employment, gifts, and family relationships. The document includes instructions on filing deadlines, penalties for non-compliance, and references to relevant legal sections. It serves as a mandatory disclosure form for vendors seeking to do business with the City of Dallas to ensure transparency and prevent conflicts of interest.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for DAL Garage Repairs Issue for Bid R1 - FAA Standard Specifications: This document is the Request for Bid (RFB) for the Dallas Airport System Garage Repairs, Issue for Bid Revision 1, including combined drawings. It incorporates FAA Form AC 150-5370-10H Standard Specifications for Construction of Airports and outlines general civil rights provisions, including Title VI nondiscrimination requirements. The document details compliance obligations for contractors regarding nondiscrimination statutes and authorities, ensuring fair opportunity for disadvantaged business enterprises and prohibiting discrimination based on race, color, national origin, sex, age, disability, and other protected categories. It also specifies contractor responsibilities for subcontractor solicitations, reporting, and sanctions for noncompliance. This version includes critical contract provisions and compliance instructions essential for bidders.
PDF
PDF, High priority: read this firstpresolicitation
HighAI Summary for Dallas Love Field Garages A & B Repairs Re-Bid Pre-Bid Meeting and Solicitation Overview: This document is a pre-bid meeting and solicitation overview for the Dallas Love Field Garages A & B Repairs Re-Bid project, solicitation number CIZ25-AVI-3197. It outlines the project intent to repair water infiltration, expansion joints, concrete cracks, and apply new traffic coatings to improve the garages. The document includes the solicitation schedule, submission instructions via the City of Dallas Bonfire portal, bid bond requirements, insurance, and safety protocols including a Site-Specific Safety Plan. Environmental monitoring and compliance with EPA and local regulations are also mentioned. The document is dated for events in October 2025 and provides detailed procurement logistics and project scope information.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Davis Bacon and Living Wage Rates FY 25-26 Memorandum and Wage Determination: This document is a memorandum dated September 17, 2025, from Dallas Water Utilities providing the Davis Bacon and Living Wage Rates for fiscal year 2025-2026. It references City Council Resolutions establishing prevailing wage rates for public works contracts in Dallas, Texas, including public building and highway/heavy construction. The document includes the requirement that contractors pay the higher of the Davis Bacon Wage Rates or the City's living wage rate of $23.06 per hour. It also outlines penalties for non-compliance and provides detailed wage rates for various construction trades effective October 1, 2025, through September 30, 2026. The wage rates are based on the U.S. Department of Labor's published rates and include references to applicable Executive Orders and modifications.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB Project Information Packet - City of Dallas Construction Warranty and Safety: This document is a Request for Bid (RFB) project information packet for construction work with the City of Dallas. It includes a detailed warranty of construction clause ensuring the contractor warrants the work for one year from acceptance, covering defects in materials, workmanship, and design. The document also outlines minimum trench safety requirements referencing regional standards, and extensive fire safety regulations at construction sites per City of Dallas Fire Code Ordinance 15525. These include provisions for flammable fuel storage, combustible waste management, heating device operation, tarpaulin use, combustible liquid storage, welding and cutting safety, and fire extinguishing equipment requirements. The document is essential for bidders to understand contractual warranty obligations and safety compliance.
PDF
PDF, Low priorityother
LowAI Summary for City of Dallas Environmental Policy and Contractor Requirements: This document outlines the City of Dallas's Environmental Policy adopted in 2005, emphasizing the city's commitment to environmental stewardship, compliance with laws, and sustainability. It provides guidance for contractors, vendors, and consultants working with the city to adhere to environmental regulations and practices, including pollution prevention and continual improvement. The document includes administrative requirements, a list of environmental aspects to consider, and instructions for contractors to submit an Environmental Record Affidavit before starting work. It also highlights the city's use of an Environmental Management System aligned with ISO 14001:2004 standards.
PDF
PDF, Low priorityform
LowAI Summary for City of Dallas OPS-FRM-640 Team Make-Up and Local Workforce Form: This document is the City of Dallas Office of Procurement Services Business Enterprise Hub Team Make-Up and Local Workforce Form (OPS-FRM-640). It includes sections for team make-up and schedule of work, historical subcontracting utilization, and local workforce demographics. The form captures company and subcontractor information, contract values, participation percentages, and workforce classification by race and gender. It is intended for use in procurement projects to report subcontractor participation and workforce composition. Completion of the local workforce section is voluntary unless required by federal or state programs. The form includes signature and date fields for the company's certifying official.
PDF
PDF, Low priorityother
LowAI Summary for DAL Garage AB Repairs Issue for Bid R1 Business Information Form: This document is a Business Information Form related to the DAL Garage AB Repairs Issue for Bid R1 project. It collects legal and contact information about the business, including business name, address, form of business entity, tax identification numbers, and ownership details. The form also addresses cooperative purchasing agreements and compliance with the City's Environmental Policy. It does not contain solicitation or contract terms, technical specifications, or evaluation criteria.
PDF
PDF, Low prioritytax-form
LowAI Summary for IRS Form W-9 Request for Taxpayer Identification Number and Certification: This document is the IRS Form W-9 (Rev. March 2024), used to request a taxpayer identification number (TIN) and certification from U.S. persons. It includes instructions for completing the form, certification statements under penalties of perjury, and details on exemptions and FATCA reporting. The form is essential for entities required to file information returns with the IRS, such as Forms 1099 and 1098. The document clarifies the purpose, recent changes, and certification requirements for providing a correct TIN to avoid backup withholding.
PDF
PDF, Low priorityother
LowAI Summary for Pre-Bid Meeting Sign-In Sheet for Garages A & B - 10/16/2025: This document is a sign-in sheet for an internal/external meeting and training session titled 'Pre-Bid Meeting - Garages A & B' held on October 16, 2025, at the Flight Deck Conference Center, Room Alpha. The meeting duration was up to 2 hours, starting at 1:00 p.m. It includes a list of attendees with their names, employee numbers, city departments or external organizations, and email addresses or signatures. The document appears to be related to a pre-bid meeting for repairs re-bid but does not contain solicitation or contract details.
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
The intent of this project is to hire a contractor to repair water infiltration, expansion joints, concrete cracks and applying new traffic coatings in Garages A & B at Dallas Love Field Airport. This is to maintain and enhance the functionality, durability, safety, and visual appeal of the garages. The successful contractor will phase the project to allow construction activities without interrupting the garage operation.