Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Davidson River Campground Brevard Sewer Project

Awarded
12445226Q0005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Davidson River Campground Brevard Sewer Project involves replacing the failing Schenck Job Corps pump station and force main to connect the Davidson River Campground and Pisgah Ranger District facilities to the City of Brevard Wastewater Collection System. This critical infrastructure upgrade is necessary to eliminate ongoing sanitary sewer overflows and costly sewer surcharges currently incurred by the Forest Service. The project is valued between $1 million and $5 million and is structured as a total small business set-aside under NAICS code 237110, with bids due on March 11, 2026, and awarded under a firm-fixed-price contract. The scope includes demolition, excavation, installation of gravity sewer lines and force main using open cut and horizontal directional drilling techniques, construction of new manholes and lift stations, electrical controls, pavement restoration, erosion and sediment control, and comprehensive system testing. All work must comply with detailed technical specifications, revised construction drawings from January 2025, and the Project Manual, which outlines contract execution, quality standards, and closeout procedures. Payment is governed by Section 01400, which specifies unit pricing and lump sum structures for all work items, with no additional compensation permitted without an approved change order. The Davis Bacon Wage Determination NC20260061 mandates payment of prevailing wages and fringe benefits for all trades, including pipefitters, laborers, electricians, and operators, while also requiring compliance with Executive Order 14026 on minimum wages and paid sick leave provisions. Contractors must submit five volumes of proposals via SAM.gov, including a technical approach limited to six pages, past performance documentation, bid guarantee, and itemized schedule. Evaluation prioritizes technical approach—requiring demonstrated experience in wastewater utility projects, trenchless techniques, and pump station construction—followed by fair and reasonable pricing and acceptable past performance, with award based on best-value trade-off rather than lowest price. Performance and payment bonds are required, along with strict adherence to FAR clauses covering differing site conditions, inspection, acceptance, warranty, change orders, and safety. All materials must meet preservation and labeling standards, with no military packaging requirements, and must conform to ASTM, ACI, and NEC standards. The site visit was held on February 5, 2026, at 1346 Pisgah Highway, and all work must be performed in Transylvania County, North Carolina. Invoicing must be submitted through the Integrated

General Info

Replace failing pump station to connect campground to Brevard sewer system, small business set-aside, $1M–$5M, compliance with Davis Bacon and Buy American.

Contract Value

$5,015,701.09

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Pisgah Forest, NC, 28768, USA

Set-Aside

SBA

Award Issued Date

Documents

16

24040 US Forest Service Revised PS Detail Sheets

PDF, High priority: read this firstsow
High

Amendment 1 to Solicitation 12445226Q0005

PDF, High priority: read this first9 pages · amendment
High

Davidson River Campground Sewer System Improvements Bid Form

PDF, High priority: read this first4 pages · bid-form
High

Davidson River Campground Sewer System Improvements Bid Form

PDF, High priority: read this first4 pages · bid-form
High

Davidson River Campground Sewer System Improvements Plan Set

PDF, High priority: read this first44 pages · specifications
High

Davidson River Campground Sewer System Improvements Project Manual

PDF, High priority: read this first78 pages · specifications
High

Davis Bacon Wage Determination NC20260061

PDF, High priority: read this first5 pages · wage-determination
High

RFQ 12445226Q0005 Davidson River Campground Brevard Sewer Project Terms and Conditions

PDF, High priority: read this first19 pages · rfq
High

Section 01400 Measurement and Payment Supplementary Specifications

PDF, High priority: read this first16 pages · supplementary-specifications
High

Solicitation 12445226Q0005 - Davidson River Campground Brevard Sewer Project Terms and Conditions Revision 1

PDF, High priority: read this first20 pages · rfq
High

Solicitation 12445226Q0005 Past Performance Questionnaire Template

DOCX, High priority: read this first4 pages · past-performance
High

Solicitation 12445226Q0005 Revised Terms and Conditions for Davidson River Campground Brevard Sewer Project

PDF, High priority: read this first20 pages · rfq
High

USFS Davidson River Campground Sewer System Improvements Technical Specifications June 2024

PDF, High priority: read this first263 pages · technical-specifications
High

2023 Davidson R. Bridge Inspection Report

PDF, Low priority23 pages · inspection-report
Low

Attachment 4 - DRCG Brevard Sewer Final Plans Signed Reduced Size

PDF, Low priority38 pages · other
Low

Davidson River Campground Site Visit Information

PDF, Low priority1 page · site-visit
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

6 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline changed from Mar 2, 2026 to Mar 12, 2026. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Mar 12, 2026 to Mar 11, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa East 12 Usda-Fs
Contacts1 person available
OfficeAtlanta, GA, 303092449, USA
Office AddressAtlanta, GA, 303092449, USA
Contacts
Jalisa C Sims

Full Description

Show more

This project will replace the existing Schenck Job Corps pump station and existing force main to connect. The Davidson River Campground and Pisgah Ranger District facilities north of US 276 to the City of Brevard Wastewater Collection System. This infrastructure is failing and incurring significant sewer surcharges to the Forest Service as well as contributing to Sanitary Sewer Overflows. 

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveys, preconstruction video, and traffic control. Norstar Plumbing and Engineering, Inc. is managing the solicitation and is specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website, and coordination is handled by primary points of contact Nathan and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 7 hours ago

DEADLINE

in about 19 hours
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, site grading, and the provision of a fully operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with responsiveness contingent upon the submission of a completed EJCDC C-410 Bid Form, a bid bond, and required MWBE documentation, including a Good Faith Efforts Form and Table A. The contractor must provide performance and payment bonds equal to the contract price and maintain insurance with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to achieve substantial completion. Payments are processed monthly via applications for payment submitted to the Engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Bids will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of the Mountain Avenue Lift Station with two submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operational service. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. All bids and quotes must be submitted by October 29, 2025, at 2:00 PM.
Filanc

POSTED

about 7 hours ago

DEADLINE

in about 19 hours
View Details

More opportunities from Department Of Agriculture → Csa East 12 Usda-Fs

Same awarding agency

NAICS: 238190
New
Federal
AZ Coconino NF Flagstaff Garage door Replacement and Service
Solicitation # 12445127Q0004
Solicitation 12445127Q0004 is a combined synopsis and request for quotation issued by the USDA Forest Service for garage bay door replacement and maintenance at the Flagstaff Ranger Station (Peaks) and the Mormon Lake Work Center (MLWC) in Arizona. The scope of work includes the full replacement of three bay doors at Peaks and four at MLWC, with some requiring 24 by 12 inch clear, insulated, shatter-resistant glass windows. Additionally, the contractor will provide general service, lubrication, and new flexible seal strips for 11 bay doors, including specific parts replacement or adjustments for three doors at the Peaks location. This is a firm fixed price acquisition set aside exclusively for small businesses under NAICS code 238190. The period of performance is scheduled from November 19, 2026, to February 19, 2027, with a final delivery date of February 8, 2027. Award will be based on the best value to the government, specifically the lowest price provided the price is fair and reasonable and the contractor's past performance is rated as acceptable or neutral. All work must comply with OSHA standards, the International Building Code, and NFPA requirements. The contractor is responsible for providing a representative and ensuring all materials are delivered in original manufacturer packaging. Final acceptance is subject to inspection by the Contracting Officer's Representative in accordance with FAR 52.246-12.
Other Foundation, Structure, and Building Exterior Contractors

POSTED

5 days ago

DEADLINE

in 26 days
View Details
NAICS: 541611
Federal
Small Business Subcontracting CoordinationThe contract supports the prime contractor in fulfilling federal small business subcontracting requirements under the Small Business Set-Aside program, specifically adhering to FAR clauses 52.219-9 and 52.219-14. This includes comprehensive tracking of subcontracting activities, accurate reporting to federal agencies, and ensuring full compliance with statutory and regulatory obligations designed to promote participation by small businesses in federal contracting. The work involves managing subcontractor data, monitoring performance against established goals, and maintaining documentation to demonstrate adherence to small business utilization targets. The contract is classified under NAICS code 541611, indicating administrative management and general management consulting services, and is tied to the U.S. Department of Agriculture through the CSA East 12 office. Performance is localized to an area with a zip code of 55802. The set-aside designation as a Total Small Business Set-Aside under FAR 19.5 means only qualified small businesses are eligible to perform the work, emphasizing the federal government’s intent to maximize economic opportunities for small business concerns. The contract will require diligent coordination with subcontractors and continuous alignment with evolving federal compliance standards.
Administrative Management and General Management Consulting Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 562991
Federal
West Zone Vault Toilet Pumping ServicesThe contract requires year-round vault toilet pumping services across remote locations in the West Zone, specifically servicing areas along the Gunflint Trail, Ely, and Crane Lake, including both seasonal and winterized sites. The work demands reliable, weather-adapted operations to maintain sanitation standards in hard-to-reach areas where access may be limited by seasonal conditions, requiring equipment and personnel capable of operating in extreme or isolated environments. All services must be performed consistently throughout the year to ensure public health and environmental compliance in federal recreational and managed lands. The solicitation is structured as a subcontract under a Total Small Business Set-Aside, designated by NAICS code 562991 for other waste management services, ensuring eligibility is restricted to small businesses as defined by the SBA. The contract is issued by the U.S. Department of Agriculture through the CSA East 12 agency, with the primary place of performance located in the 55802 zip code area, indicating a central logistics base within Minnesota’s Boundary Waters region. While specific performance timelines, funding amounts, and reporting obligations are not detailed here, the nature of the work implies ongoing operational demands, potential mobilization challenges, and a requirement for robust contingency planning to maintain service continuity under variable seasonal and environmental conditions.
Septic Tank and Related Services

POSTED

5 months ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS