Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Davidson River Campground Brevard Sewer Project

Awarded
12445226Q0005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Davidson River Campground Brevard Sewer Project involves replacing the failing Schenck Job Corps pump station and force main to connect the Davidson River Campground and Pisgah Ranger District facilities to the City of Brevard Wastewater Collection System. This critical infrastructure upgrade is necessary to eliminate ongoing sanitary sewer overflows and costly sewer surcharges currently incurred by the Forest Service. The project is valued between $1 million and $5 million and is structured as a total small business set-aside under NAICS code 237110, with bids due on March 11, 2026, and awarded under a firm-fixed-price contract. The scope includes demolition, excavation, installation of gravity sewer lines and force main using open cut and horizontal directional drilling techniques, construction of new manholes and lift stations, electrical controls, pavement restoration, erosion and sediment control, and comprehensive system testing. All work must comply with detailed technical specifications, revised construction drawings from January 2025, and the Project Manual, which outlines contract execution, quality standards, and closeout procedures. Payment is governed by Section 01400, which specifies unit pricing and lump sum structures for all work items, with no additional compensation permitted without an approved change order. The Davis Bacon Wage Determination NC20260061 mandates payment of prevailing wages and fringe benefits for all trades, including pipefitters, laborers, electricians, and operators, while also requiring compliance with Executive Order 14026 on minimum wages and paid sick leave provisions. Contractors must submit five volumes of proposals via SAM.gov, including a technical approach limited to six pages, past performance documentation, bid guarantee, and itemized schedule. Evaluation prioritizes technical approach—requiring demonstrated experience in wastewater utility projects, trenchless techniques, and pump station construction—followed by fair and reasonable pricing and acceptable past performance, with award based on best-value trade-off rather than lowest price. Performance and payment bonds are required, along with strict adherence to FAR clauses covering differing site conditions, inspection, acceptance, warranty, change orders, and safety. All materials must meet preservation and labeling standards, with no military packaging requirements, and must conform to ASTM, ACI, and NEC standards. The site visit was held on February 5, 2026, at 1346 Pisgah Highway, and all work must be performed in Transylvania County, North Carolina. Invoicing must be submitted through the Integrated

General Info

Replace failing pump station to connect campground to Brevard sewer system, small business set-aside, $1M–$5M, compliance with Davis Bacon and Buy American.

Agency

Department Of Agriculture → Csa East 12 Usda-FsView Agency

Contract Value

$5,015,701.09

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Pisgah Forest, NC, 28768, USA

Set-Aside

SBA

Awardee

WRIGHT BROS LLCView Profile

Award Issued Date

Documents

(16)

Davis Bacon Wage Determination NC20260061

PDF5 pageswage-determination

Attachment 4 - DRCG Brevard Sewer Final Plans Signed Reduced Size

PDF38 pagesother

Davidson River Campground Sewer System Improvements Bid Form

PDF4 pagesbid-form

Solicitation 12445226Q0005 Past Performance Questionnaire Template

DOCX4 pagespast-performance

Amendment 1 to Solicitation 12445226Q0005

PDF9 pagesamendment

Davidson River Campground Sewer System Improvements Plan Set

PDF44 pagesspecifications

Section 01400 Measurement and Payment Supplementary Specifications

PDF16 pagessupplementary-specifications

24040 US Forest Service Revised PS Detail Sheets

PDFsow

Davidson River Campground Site Visit Information

PDF1 pagesite-visit

Davidson River Campground Sewer System Improvements Bid Form

PDF4 pagesbid-form

Davidson River Campground Sewer System Improvements Project Manual

PDF78 pagesspecifications

Solicitation 12445226Q0005 - Davidson River Campground Brevard Sewer Project Terms and Conditions Revision 1

PDF20 pagesrfq

2023 Davidson R. Bridge Inspection Report

PDF23 pagesinspection-report

RFQ 12445226Q0005 Davidson River Campground Brevard Sewer Project Terms and Conditions

PDF19 pagesrfq

USFS Davidson River Campground Sewer System Improvements Technical Specifications June 2024

PDF263 pagestechnical-specifications

Solicitation 12445226Q0005 Revised Terms and Conditions for Davidson River Campground Brevard Sewer Project

PDF20 pagesrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

6 updates
PhaseAwarded
Posted

Combined Synopsis

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Amendment 5

Contract was updated

Amendment 6

Contract was updated

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa East 12 Usda-Fs
Contacts1 person available
OfficeAtlanta, GA, 303092449, USA
Organization / Agency
Department Of Agriculture → Csa East 12 Usda-Fs
View Agency Profile
Office AddressAtlanta, GA, 303092449, USA
Contacts
SIMS JALISA C

Full Description

Show more

This project will replace the existing Schenck Job Corps pump station and existing force main to connect. The Davidson River Campground and Pisgah Ranger District facilities north of US 276 to the City of Brevard Wastewater Collection System. This infrastructure is failing and incurring significant sewer surcharges to the Forest Service as well as contributing to Sanitary Sewer Overflows. 

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The scope of work involves the installation of approximately 1,450 square feet of permeable pavement and eight vegetated stormwater management cells to treat roughly 1.7 acres of impervious surface within a 3.3-acre drainage area. The project requires comprehensive drainage, underdrain, inlet, pipe, and downspout work, along with limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor. Landscaping requirements include the planting of six native trees and approximately 345 native plants or approved equivalents, concluding with final stabilization, cleanup, and restoration. This solicitation specifically encourages participation from small business concerns, including minority, woman-owned, disadvantaged, HUBZone, and veteran-owned businesses, who may also form consortiums to handle larger bid items. Bids are due by 4:00 P.M. on September 17, 2026. Interested parties must submit a response indicating their intent to bid to the primary contact, Jonah Leith. The project falls under NAICS code 237110, focusing on professional civil engineering construction.
Harbel, Inc.

POSTED

about 7 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, alongside the excavation of cobbles and large boulders. This solicitation, posted on September 11, 2026, with a response deadline of September 29, 2026, is open to small businesses, including certified service-disabled veteran-owned, minority, and women-owned enterprises. The prime contractor, J.W. Fowler, is actively seeking subcontractor pricing and offering support to M/W/DBE firms regarding bonding, insurance, and equipment procurement to maximize participation.
James W. Fowler Co.

POSTED

about 7 hours ago

DEADLINE

in 17 days
View Details

More opportunities from Department Of Agriculture → Csa East 12 Usda-Fs

Same awarding agency

NAICS: 237310
Federal
Pisgah South Culvert Rehab
Solicitation # 12445226Q0046
Solicitation 12445226Q0046 is a Request for Quotation for the FY26 Pisgah South Ranger District Ditch Culvert Replacements and Road Reconditioning project in the Pisgah National Forest, North Carolina. This project is part of the Hurricane Helene Recovery efforts and involves the removal of 214 ditch relief culverts across more than 42 miles of roadway and the installation of 7,414 linear feet of 24-inch Corrugated Metal Pipe culverts. The scope also includes road rehabilitation, ditch reshaping, and the installation of rip-rap, sediment traps, and headwalls to meet current Forest Service Standards. The project magnitude is estimated between $1,000,000 and $5,000,000, and it is a total small business set-aside under NAICS code 237310. The period of performance is from October 1, 2026, to September 30, 2028, with a total duration of 730 calendar days. Award will be made to the highest technically rated offeror, provided that the price is fair and reasonable and past performance is acceptable or neutral. Quotations must be submitted via email to the designated USDA contacts by the extended deadline of September 14, 2026, at 5:00 PM ET. Proposals must be organized into five volumes, including signed amendments, bid guarantees, a technical approach limited to 15 pages, past performance questionnaires, and the completed Schedule of Items. The contractor is required to provide a competent superintendent on-site and adhere to strict environmental and fire protection policies, as well as Davis-Bacon prevailing wage rates.
Highway, Street, and Bridge Construction

POSTED

11 days ago

DEADLINE

in 2 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS