Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Pennsylvania was posted on May 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Davis Grove Road Bridge Replacement

Closed
Horsham Township, Montgomery County, PAState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified SBE, VSBE, and DBE firms for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering heavy civil and infrastructure activities including site preparation, asbestos abatement, tunneling, underground piping, asphalt and concrete paving, electrical systems, and telecommunications. Interested firms must provide evidence of certification through the Department of General Services and the Port of Long Beach PlanetBids portal. Bidders are required to hold a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating compliance with DBE Program requirements. Interested parties must contact Lead Estimator Cassandra Shore to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 11 hours ago

DEADLINE

in 4 days
NAICS: 237310
New
Federal
Z--PAVEMENT MARKING-STRIPING
Solicitation # 140A0926Q0037
Solicitation 140A0926Q0037 is a firm-fixed-price requirement for pavement marking and re-striping maintenance services for the Bureau of Indian Affairs Western Navajo Agency Branch of Transportation in Tuba City, Arizona. The scope of work involves applying high-build waterborne traffic paint and thermoplastic markings across various BIA routes, specifically the N15, N16, N20, and N21 series. Key deliverables include over 2.5 million feet of striping, 12 crosswalks, 22 only markings, and 18 arrow/only combinations. The project is 100 percent set aside for Indian Small Business Economic Enterprises under the Buy Indian Act, requiring offerors to self-certify their status using the Indian Economic Enterprise Representation Form. The period of performance is approximately 30 days, with specific dates listed from September 18, 2026, to October 31, 2026. Under Amendment 0001, the response deadline was extended to September 15, 2026, at 3:00 p.m. MDT, and Lynelle Benallie was designated as the new Contracting Officer and primary point of contact. Compliance requirements include adherence to Department of Labor Service Contract Act wage determinations for Coconino, Apache, Gila, and Navajo counties. Invoicing must be processed electronically through the Invoice Processing Platform and approved by the Government COR. Offerors must provide their Unique Entity ID and complete specific blocks of the SF-1449 to be considered.
Navajo Region

POSTED

about 15 hours ago

DEADLINE

in 4 days
NAICS: 237310
New
Federal
Repair A Avenue at Building 300
Solicitation # SP330026Q0247
Solicitation SP330026Q0247 is a request for quotations for a firm-fixed-price purchase order to provide all labor, materials, and equipment necessary to repair and realign A Avenue at Building 300, located at the Defense Distribution Center Susquehanna in New Cumberland, Pennsylvania. The scope of work includes roadway reconstruction with 11-foot wide lanes, concrete curbs, subbase drains, and shoulder stabilization to prevent hillside erosion. Additionally, the project requires the removal and replacement of perimeter chain link and ornamental picket fencing, as well as the guide rail system. Incidental work includes site grading, riprap, seeding, and pavement markings. This acquisition is specifically set aside for SBA Certified Women-Owned Small Business (WOSB) concerns under NAICS code 237310. The government will award the contract to the lowest priced responsive and responsible bidder based on the sum total of all Contract Line Items (CLINs), including base and optional items. Offerors must provide pricing for all CLINs to be considered responsive. Required submission documents include a completed SF 1442, a bid bond of twenty percent, and signed copies of all amendments. The final deadline for electronic submission via the PIEE module is 1:00 PM EDT on September 14, 2026. The project is subject to Davis-Bacon Act labor standards and requires performance and payment bonds via SF 25 and SF 25A. Payment requests and receiving reports must be submitted electronically through Wide Area WorkFlow (WAWF).
DLA Distribution

POSTED

about 15 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The Davis Grove Road Bridge Replacement project in Montgomery County, Pennsylvania, entails the complete removal of the existing bridge and construction of a new structure, encompassing all labor, materials, and equipment necessary for full execution. The work includes detour sign and barricade installation, clearing and grubbing, stream diversion and erosion and sedimentation controls, temporary excavation support, excavation, demolition, reinforcing bar placement, cast-in-place concrete, stone placement, asphalt paving, guide rail installation, and full site restoration. Performance is tied to the project site as defined in the Contract Documents, with commencement occurring no earlier than 30 days after the Effective Date or 60 days after bid opening, whichever comes first. The Contractor must submit a detailed progress schedule within 10 days of the Effective Date and update it with each payment application, aligning all phases with approved milestones. All work must conform to applicable codes, industry standards, and manufacturer specifications, with the Engineer serving as the sole authority for acceptability of materials, substitutions, and performance outcomes. Insurance requirements are stringent, mandating Commercial General Liability coverage of at least $2 million per occurrence, Business Auto Liability of $1 million per accident, a $2 million Umbrella policy, and Workers’ Compensation as legally required, with all policies issued by insurers rated A- or better by A.M. Best. The Owner and Engineer must be named as additional insureds under specified ISO endorsements, and all coverage must be primary and non-contributory. The Contractor bears full responsibility for all inspections, testing, and related costs, including advance 24-hour notification to the Engineer for any work requiring oversight. Subsurface conditions are the Contractor’s risk to assess prior to commencement, with no claims permitted for differing site conditions without strict adherence to reporting protocols. Submittals including shop drawings, samples, test reports, and certificates must be submitted in triplicate printed format, with electronic versions considered supplemental only. Payment procedures, invoicing systems, and formal accounting codes are not specified, and while the contract is structured as a solicitation under NAICS 237310, no CLIN data or estimated value is provided, indicating an undefined contract value. The Engineer retains broad discretion in evaluating compliance, approving changes, and determining final acceptance, with no formal evaluation factors or award methodology documented beyond technical acceptability and professional judgment.

General Info

Replace Davis Grove Road Bridge with full construction, strict compliance, insurance, and engineer-approved procedures.

Agency

Pennsylvania → Montgomery CountyView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Montgomery County, PA, USA

Set-Aside

NONE

Documents

(19)

Section 01 33 00 Submittals Procedures and Requirements

PDFsow

Soil Erosion and Sediment Control Specifications Section 01 57 13

PDFspecifications

Section 01 60 00 - Material and Equipment

PDFspecifications

Horsham Township Contract 23-01182.01 Title Sheet and Cover

PDFcontract-document

Davis Grove Road Bridge Replacement - Table of Contents

PDFother

Construction Facilities and Temporary Controls Section 01 50 00

PDFspecifications

Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf

PDF

Doc 00 01 01 - TITLE SHEET AND COVER.pdf

PDF

Traffic Regulation Section 01 55 26

PDFspecifications

Bid Tabulation.pdf

PDF

Quality Control Section 01 40 00 for Davis Grove Road Bridge Replacement

PDFsow

Bid Document

PDF

Instructions to Bidders - Acronyms Section

PDFinstructions-to-bidders

Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf

PDF

Section 01 70 00 Contract Closeout Procedures

PDFsow

Doc 00 11 13 - ADVERTISEMENT FOR BIDS - Davis Grove Road Bridge Replacement.pdf

PDF

Contract 23-01182.01 Horsham Township Davis Grove Road Bridge Replacement Project Manual

PDFproject-manual

Doc 00 01 10 - TABLE OF CONTENTS.pdf

PDF

Bid Table BT-82QR 1780495399.8978825.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Montgomery County
ContactsNo contacts available
OfficeMontgomery County, PA, USA
Organization / Agency
Pennsylvania → Montgomery County
View Agency Profile
Office AddressMontgomery County, PA, USA
ContactsNo contact information available

Interested Companies (132)

Show more
Marona Construction
Construction Masters Services
Sinking Spring, PA
Schuylkill Tree and Landscaping

See All 132 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Work to be completed under this contract consists of all labor, equipment, and materials to remove the existing bridge and replacing it with a new structure. The scope of work includes, but is not limited to the installation of detour signs and barricades, clearing and grubbing, stream diversion and E&S controls, temporary support of excavation, excavation, demolition, reinforcing bar installation, cast-in-place concrete work, stone placement, asphalt pavement work, installation of guide rail and site restoration.

More opportunities from Pennsylvania → Montgomery County

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS