This Solicitation opportunity from Florida was posted on May 6, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract involves upgrading the Runway 25R Safety Area (RSA) overrun at Daytona Beach International Airport to address safety concerns identified during a Part 139 inspection. The existing RSA, which extends 1,000 feet from the runway threshold and spans 500 feet in width, has surface variations that may not comply with FAA Advisory Circular standards. The primary goal is to regrade and improve the RSA to meet Standard Operating Procedures, thereby enhancing safety for air operations on the airport’s main air carrier runway, Runway 7L-25R. The project scope requires the contractor to supply all necessary materials, labor, and incidentals, and to complete construction in accordance with safety and traffic maintenance requirements, including final cleanup and documentation.
Funding for the project ranges between five and fifteen million dollars, with a response deadline of May 30, 2024. The contract is managed by the Florida-based airport authority, with Inga Fegley serving as the primary contact. The contractor is responsible for providing performance and payment bonds, ensuring safety during construction, and delivering a fully functional, compliant RSA upgrade that aligns with the airport’s safety standards. The project aims to improve the safety infrastructure to support reliable and secure air operations at Daytona Beach International Airport.
XLSX, High priority: read this firstbid-price-sheet
HighAI Summary for 24-B-129IF Bid Pricing Sheet for Daytona Beach International Airport Runway 25R RSA Construction: This document is Exhibit G, a Bid Pricing Sheet for project 24-B-129IF at Daytona Beach International Airport involving Runway 25R Runway Safety Area Construction. It lists pay items with descriptions, units, quantities, and placeholders for unit prices and extensions. The sheet is intended for bidders to fill in pricing for various construction tasks such as quality control, seeding, excavation, pavement removal, pipe installation, and structures. The total extension amount is currently zero, indicating no prices have been entered yet.
XLS
XLS, High priority: read this firstprime-subcontractor-form
HighAI Summary for Contract C-1974 Prime/Subcontractor Form: This document is the Prime/Subcontractor Form for Contract No. C-1974, associated with ITB No. 24-B-129IF. It requires bidders to list all subcontractors proposed for the project, including company names, addresses, dollar values, and percentages of work performed. The form emphasizes that failure to complete and return it will result in a non-responsive bid. The prime contractor is responsible for ensuring subcontractors hold appropriate licenses and must obtain approval for any changes during the project. The form includes instructions for completing dollar values assigned to each contractor, ensuring totals match the Total Base Bid and sum to 100%. This form is critical for bid submission compliance and subcontractor disclosure.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Daytona Beach International Airport Runway 25R RSA Construction IFB 24-B-129IF: This Invitation for Bid (IFB) 24-B-129IF, released May 6, 2024, solicits bids for the construction of the Runway 25R Runway Safety Area (RSA) at Daytona Beach International Airport. The project addresses safety concerns identified during an FAA Part 139 inspection by updating RSA grading to meet FAA standards. The contract includes furnishing materials, labor, and all work to complete the project, funded by FAA and FDOT grants. Key dates include a non-mandatory pre-bid meeting on May 8, 2024, a question deadline of May 16, 2024, and bid submission deadline of May 30, 2024. The estimated construction cost is $6,528,980 with a total contract time of 243 days. Bids must be submitted electronically via the County's eProcurement Portal.
PDF
PDF, High priority: read this firstbid-documents
HighAI Summary for Exhibit A - Bid Documents for Daytona Beach International Airport Runway Safety Area Construction: This document, titled Exhibit A - Bid Documents, is part of the solicitation for the Daytona Beach International Airport Runway 25R Runway Safety Area Construction project. It includes a detailed bid checklist outlining all required forms and certifications bidders must submit to be considered responsive, such as bid proposals, bid bonds, certifications regarding debarment and scrutinized companies, insurance proof, and compliance with FDOT DBE and Equal Opportunity requirements. The document also provides important notices about bid bond requirements, scrutinized company certifications under Florida statutes, and instructions for using the FDOT Equal Opportunity Compliance (EOC) system. Failure to submit any required documents may result in a non-responsive bid. The document is essential for bidders to prepare compliant bids for this federal and state-involved construction contract.
PDF
PDF, High priority: read this firstinsurance-requirements
HighAI Summary for Exhibit C - Insurance Requirements 24-B-129IF: This document, Exhibit C for contract 24-B-129IF, details the insurance requirements the contractor must maintain during the agreement term. It specifies types and minimum limits for Workers Compensation, Commercial General Liability, Auto Liability, Excess Liability, and Installation Floater insurance. Key provisions include waiver of subrogation, additional insured status for the County and FDOT, primary and non-contributory coverage, and notification requirements for policy changes or cancellations. The document also addresses subcontractor insurance obligations, claims-made policy retroactive dates, and prohibits self-insurance and risk retention groups. Cancellation notice procedures and certificate holder information are provided. The document ensures comprehensive risk management compliance for the County of Volusia and related entities.
PDF
PDF, High priority: read this firstfederal-contract-provisions
HighAI Summary for Exhibit H - Federal Contract Provisions: This document titled 'Exhibit H - Federal Contract Provisions' outlines mandatory compliance requirements for contractors engaged in federally assisted construction work. It includes provisions related to Equal Employment Opportunity, prohibiting discrimination based on race, color, religion, sex, sexual orientation, gender identity, or national origin. The document references Executive Order 11246 and details contractor obligations such as affirmative action, posting notices, and cooperation with labor unions. It also covers enforcement measures including contract cancellation or suspension for noncompliance. The provisions extend to subcontractors and vendors, ensuring broad applicability. The document is essential for contractors to understand their legal and regulatory responsibilities under federal grants and cooperative agreements.
PDF
PDF, High priority: read this firstprocedure
HighAI Summary for Exhibit I - Sales Tax Exemption Procedures for Volusia County Construction Projects: This document outlines the sales tax exemption procedures for construction management projects for the County of Volusia, Florida. It includes background on the County's Consumer's Certificate of Exemption, definitions of key terms such as Construction Change Order and Purchase Order, and a detailed flow of documents process from requisition origination to direct payment to vendors. The document also specifies responsibilities of the County and the Prime Contractor to ensure compliance with Florida Administrative Code Rule 12A-1.094 and proper processing of tax-exempt purchases. It includes a sample sales tax savings computation and a requisition form template for materials and supplies for construction projects.
PDF
PDF, High priority: read this firstcontract-provisions
HighAI Summary for Exhibit L - FAA Contract Provisions: This document, titled Exhibit L - Federal Aviation Administration (FAA) Contract Provisions, outlines key contract clauses and requirements for contractors working on FAA projects. It includes provisions on access to records and reports for audit purposes, mandatory affirmative action for equal employment opportunity with specific minority and female participation goals, and notification requirements for subcontract awards. The document also details the Buy American Preference requirements under Title 49 USC § 50101, Executive Order 14005, and the Bipartisan Infrastructure Law (BABA), specifying conditions for waivers and definitions of construction materials and manufactured products. The provisions emphasize compliance with federal laws to ensure domestic sourcing and equal opportunity in contract performance.
PDF
PDF, High priority: read this firstconstruction-plans
HighAI Summary for Runway 25R RSA Improvements Construction Plans - Daytona Beach International Airport: This document contains the construction plans for the Runway 25R RSA Improvements project at Daytona Beach International Airport, Florida. Prepared by Engineers & Planners (Avcon, Inc.) in April 2024, it includes an index of detailed drawings such as general construction notes, site plans, safety and phasing plans, demolition plans, geometry plans, typical sections and details, and storm survey and runway plans. The plans also provide specific application details for sediment control measures like straw bale drop inlet sediment filters, general notes on erosion control, and construction requirements to ensure site stabilization and compliance with permit requirements. The document is critical for guiding construction activities and ensuring environmental protection during the project.
PDF
PDF, High priority: read this firsttechnical-specifications
HighAI Summary for Runway 25R RSA Improvements Technical Specifications April 2024: This document contains the issued-for-construction technical specifications for the Runway 25R RSA Improvements project at Daytona Beach International Airport, Florida, dated April 2024. It includes detailed proposal documents, FAA provisions, general and special provisions, and technical specifications covering quality control, environmental controls, construction methods, materials, and safety requirements. The document also provides a comprehensive bid schedule with pay items and quantities for various construction tasks such as pavement removal, excavation, asphalt paving, fencing, and drainage structures. Reference FAA specifications and geotechnical reports are included by reference. This document is critical for contractors preparing bids and executing the construction contract.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Volusia County Construction Contract ITB No. 24-B-129IF: This document is a construction contract between the County of Volusia and a contractor for the Daytona Beach International Airport Runway 25R Runway Safety Area Construction project. It references ITB No. 24-B-129IF and includes detailed articles covering contract documents, permits, contractor services, compensation, personnel, insurance, dispute resolution, termination, liability, government compliance, and miscellaneous provisions. The contract incorporates multiple exhibits such as general conditions, special conditions, bid documents, construction plans, technical specifications, and federal requirements. The document outlines the contractor's responsibilities, compliance with permits, and authority for contracting, emphasizing safety and adherence to local conditions. This contract is a formal agreement intended to govern the execution and completion of the specified construction work.
PDF
PDF, Low priorityspecial-conditions
LowAI Summary for Exhibit K - Special Conditions FAA FDOT Grant Project: This document, titled Exhibit K - Special Conditions, pertains to a Federal Aviation Administration (FAA) and Florida Department of Transportation (FDOT) grant funded project. It specifies that the anticipated construction work is scheduled to begin around April 2025. Bidders are required to hold their pricing through at least April 2025. The document outlines special conditions related to the project timeline and pricing commitments.
PDF
PDF, Low prioritypayment-performance-bond
LowAI Summary for Payment and Performance Bond for Daytona Beach International Airport Runway Safety Area Construction: This document is a Payment and Performance Bond for the Daytona Beach International Airport Runway 25R Runway Safety Area Construction project under County Contract No. C1974. It complies with Section 255.05 of the Florida Statutes and binds the Contractor and Surety to the County of Volusia for payment and performance obligations. The bond ensures the Contractor will perform the contract, make payments to claimants, indemnify the Owner for losses due to Contractor default, and guarantee the work and materials for the contractually specified period. It includes provisions for changes to the contract and legal requirements for claim actions. The document requires signatures and seals from the Contractor, Surety, and witnesses.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
The Runway 25R Runway Safety Area (RSA) overrun at Daytona Beach International airport is 1,000 feet long beginning at the runway threshold and extends 500 feet wide, or 250 feet on each side of the runway centerline. During the airport's Part 139 inspection the Runway 25R RSA overrun was identified as having a possible safety concern (or discrepancy or deficiency). The inspection identified surface variations that may not be consistent with the FAA Advisory Circular(s). The objective of the PROJECT is to update the RSA grading to meet to meet Standard Operating Procedure (SOP) and to enhance the safety of air operations at Daytona Beach International Airport. Runway 7L-25R is the airport's primary air carrier runway. The Contractor scope of work includes the construction of all of the above as required and included in the construction contract. Generally, the Contractor will furnish all materials, labor, incidentals, and supplies required to construct the project and deliver the same to the Owner, ready for use. The Contractor will provide performance and payment bonds; all work required to maintain traffic and meet the construction safety requirements; final clean-up and restoration; and all paperwork that is required.