Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New York was posted on March 20, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DBE/Subcontractor Opportunities- Viaduct and Bridge Rehab Project Frederick Douglass Greater Rochester International Airport

Closed
2120287State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Cabot Tower Signal Mast Replacement, Signal Hill National Historic Site
Solicitation # 5P468-26-0234/A
Parks Canada Agency is soliciting bids for the removal and in-kind replacement of the 6m wooden signal mast and associated rooftop equipment repairs at the Cabot Tower, located within the Signal Hill National Historic Site in St. John's, Newfoundland and Labrador. The project requires the contractor to remove the existing mast, measure it, and install an identical replacement to ensure existing equipment can be reattached. All work must comply with the National Parks Act, the 2025 National Building Code of Canada, and provincial occupational health and safety laws. The project is scheduled to be completed no later than March 31, 2027, with work specifically timed for the off-season when the tower is closed to the public. The contract will be awarded based on a weighted evaluation consisting of 90 percent price and 10 percent for an Indigenous Participation Plan, which must include firm guarantees for Indigenous labor and business involvement. Bids must be submitted via email to [email hidden] or by fax to [phone hidden], with a final closing deadline of November 3, 2026. Submissions must be divided into two separate volumes for qualifications and pricing. Key operational requirements include maintaining a Health and Safety Plan on-site, providing security personnel after hours, and adhering to strict staging limitations due to the restricted space at the historic site.
Parks Canada Agency

POSTED

about 21 hours ago

DEADLINE

in 5 days
NAICS: 238120
New
International
Provision of Structural Repairs and Planned Maintenance to Blackpool Tower Winter 2026/7 and Summer 2027
Solicitation # ocds-h6vhtk-078f6c
Blackpool Borough Council is seeking a qualified Remedial Works Supplier to provide structural repairs and planned maintenance for Blackpool Tower, with an estimated total value of 4,000,000 GBP including VAT. The project is divided into three phases: a Winter Works package from November 2026 to March 2027 during operational closure, a Summer Works package from April 2027 to November 2027 during the operating season, and ongoing ad-hoc maintenance beyond November 2027 based on annual surveys. The initial period of performance runs from November 30, 2026, to November 29, 2027, with a possible one-year extension to November 29, 2028. The contract is an open competition with award criteria weighted at 50 percent Quality, 40 percent Price, and 10 percent Social Value. Mandatory requirements include IRATA level 3 qualified supervisors, IRATA level 1 or 2 technicians, and project managers who are Chartered Members of the Institution of Civil Engineers or Institution of Structural Engineers. Suppliers must maintain insurance coverage of 10 million GBP for Employer's Liability and Public Liability, and 5 million GBP for Professional Indemnity. All work must adhere to strict technical and safety standards, including BS EN 1090 Execution Class 3 for steel structures, CDM 2015, and the Work at Height Regulations 2005. The deadline for tender submissions is November 20, 2026.
Blackpool Borough Council

POSTED

1 day ago

DEADLINE

in 21 days

AI Contract Overview

Show more

Cold Spring Construction Co. is preparing to bid on the Monroe County Project Number BP0304-25, PIN 1982.03, which involves the rehabilitation of viaducts and bridges at the Frederick Douglass Greater Rochester International Airport in Monroe County. The project is scheduled for completion within 200 calendar days from the issuance of the Notice to Proceed, with the bid deadline set for April 3, 2025. The scope of work encompasses a wide range of construction activities, including excavation, paving, structural concrete, steel work, protective coatings, bridge joint systems, drainage, signage, and traffic control, with specific opportunities available for Disadvantaged Business Enterprises (DBEs) in various categories. All subcontractors must be registered with the NYSDOL Bureau of Public Works prior to bidding or starting work, ensuring compliance with prevailing wage laws. Plans and specifications are accessible for free download, and additional project information can be obtained from Brett J. Bottone, Vice President of Engineering at Cold Spring Construction. The project covers multiple counties across New York State and involves a contract size estimated between five and fifteen million dollars. While there is no set-aside for Service-Disabled Veteran-Owned businesses, there is a 5% subcontracting goal for disadvantaged-owned firms. This opportunity is part of the New York Subcontract Opportunities program, and interested parties can find further details and respond via the provided online link.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew York Subcontract Opportunities
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Cold Spring Construction Co. intends to bid on Monroe County Project Number BP0304-25, PIN 1982.03, which will be let on April 3, 2025.  This contract provides for Viaduct and Bridge Rehabilitation Project Frederick Douglass Greater Rochester International Airport, in Monroe County.  It is scheduled for completion 200 calendar days from Notice to Proceed. Full plan and specifications for the project are available for free download at the link as follows: https://coldspringconstruction.sharefile.com/d-s69ec44b6a89a4824aed3cfb2c05104a3 Electronic files of plans and proposals can also be made available for download from Cold Spring Construction.  Requests for download and/or further information concerning the project may be obtained from Brett J. Bottone, Vice President - Engineering at +1 (555) 000-0000 or via email at contact@example.gov.  Available DBE scopes for this project: ·        Trench, Culvert and Structure Excavation ·        Hot Mix Asphalt (HMA) Pavements ·        Tack Coat ·        Cold Milling ·        Sawcutting ·        Structural Concrete ·        Reinforcing Steel for Concrete Structures ·        Protective Coatings and Graffiti Removal ·        Structural Steel ·        Bridge Bearings ·        Modular Expansion Joint Systems ·        Bridge Joint Systems ·        Structural Steel Painting – Shop Applied ·        Bridge Drainage System ·        Structural Slab Reconstruction Preparation ·        Structural Concrete Removal ·        Removal & Replacement of Structural Concrete ·        Specialized Overlays for Structural Slabs ·        Structural Lifting Operations ·        Miscellaneous Structural Reconstruction ·        Guide Railing ·        Fences ·        Sidewalks, Driveways, and Bicycle Paths ·        Work Zone Traffic Control ·        Survey Operations, Row Markers & Permanent Survey Markers ·        Engineer’s Office and Laboratory Building ·        Reflectorized Pavement Marking Paint ·        Epoxy Reflectorized Pavement Markings ·        Paints ·        Reinforcing Steel ·        Bearings and Expansion Plates ·        Pavement Marking Materials ·        Temporary Traffic Control Devices ·        Trucking – Loose Materials, Fuel Delivery  All Subcontractors must register, and maintain registration, in accordance with the NYSDOL Bureau of Public Works Labor Law 220-I – Contractor Registry, prior to bidding on a public work project or commencing work on a private covered project that is subject to NYSDOL prevailing wage labor law.  Registry information is available on the NYSDOL website link below:             https://dol.ny.gov/contractor-and-subcontractor-landing Service-Disabled Veteran-Owned Set Aside: No Disadvantaged Owned Sub-Contracting Goal: 5% Due date:04/03/2025 Contract term: 200 Days from Notice to Proceed County(ies): All NYS counties Location: Frederick Douglass Greater Rochester International Airport, Monroe County This is a subcontract opportunity issued by Cold Spring Construction Company

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS