Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on September 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DCY-148-26-0001, Martha K. Glaze RYDC Interior & Plumbing Renovations

Closed
DCY-148-26-0001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a total small business set-aside solicitation for a single firm fixed price contract. The scope of work involves a comprehensive interior modernization of Building 262, as well as associated buildings 261 and 263. Key deliverables include replacing corridor and classroom flooring with composite modular materials and carpet tiles, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces with new paint and signage. Technical upgrades include the installation of raised flooring with integrated electrical distribution for classrooms, replacing variable air volume (VAV) systems, upgrading lighting controls, and replacing ceiling fans. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. Award will be based on a best suited then negotiate methodology, evaluating past performance, corporate relevant experience, and price. Contractors are required to provide payment and performance bonds, and bidders must furnish a bid guarantee of 20 percent of the bid price or 3 million dollars. All work must comply with ADA accessibility guidelines and FLETC safety and hazardous waste management plans. Personnel are subject to background checks and security clearances, including FBI fingerprinting, to ensure the confidentiality of government records.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in 24 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. The project follows a fire sprinkler discharge and requires the restoration of the first, second, and third floors, including dormitory rooms, offices, and conference rooms. The scope of work encompasses architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, and necessary electrical and plumbing repairs, including vanity and cabinet replacement. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within 15 days thereafter. This is an SBA set-aside opportunity for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Award will be based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit and provide a detailed cost breakdown, a 90-day bid guarantee, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act, requiring adherence to specific wage determinations and paid sick leave mandates. Compliance with NFPA-101 life safety codes, ADA, OSHA, and EPA regulations is mandatory, and the contractor must provide a one-year guarantee of workmanship.
Grafton Job Corps

POSTED

about 2 hours ago

DEADLINE

in 11 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, including sixteen residential rooms and bathrooms, mechanical rooms, and various common areas and utility rooms. The scope of work involves drywall installation, joint finishing, painting, and the temporary removal and re-installation of HVAC equipment. The contractor is responsible for all labor, materials, equipment, and supervision, as well as final testing of mechanical, plumbing, electrical, fire/life-safety, and security systems. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100. Proposing contractors must provide itemized pricing, a detailed work plan addressing occupied-building protection, and evidence of relevant experience. Award requirements include a minimum one-year workmanship warranty and the provision of payment and performance bonding for the full project value, along with liability and worker's compensation insurance, within ten days of award. Proposals must remain firm for at least 60 calendar days from submission.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 14 days

AI Contract Overview

Show more

The Georgia State Financing and Investment Commission is soliciting electronic bids on behalf of the Georgia Department of Juvenile Justice for the Martha K. Glaze RYDC Interior and Plumbing Renovation project in Hampton, Georgia. The scope of work involves the removal and replacement of main plumbing lines, the demolition and reconstruction of selected CMU walls, doors, and frames, and the replacement of gypsum board ceilings and light fixtures within housing units. Additionally, the project requires modifying the building layout to create a shower hub by removing existing youth cells and constructing new walls, doors, frames, and lighting. All work must be performed in accordance with the SCAR Small Construction and Renovation Project Manual GSFIC-AD-180. Bids must be submitted exclusively through the e-Builder Project Management system by 2:00 P.M. on October 20, 2026. A mandatory pre-bid conference and site tour will be held on October 1, 2026, at 10:00 a.m. at the facility; failure to attend will result in automatic disqualification. Other critical deadlines include October 5 for substitutions and October 9 for requests for information. Required submission documents include the Bid Verification and Statement of Qualifications. Bidders are prohibited from communicating with any state employees other than the contracting officer, Mendi Boddie, until a bidder is selected.

General Info

Bids for Martha K. Glaze RYDC plumbing and interior renovations due October 20, 2026.

Documents

2
PDF, High priority: read this first1 page · itb
High
PDF, High priority: read this first12 pages · user-guide
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia State Financing and Investment Commi
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Notice is hereby given that the Georgia State Financing and Investment Commission (GSFIC) will accept electronic bids on behalf of the Georgia Department of Juvenile Justice (Owner) for the project entitled Martha K. Glaze RYDC Interior & Plumbing Renovation in strict conformity with bidding and contract documents. Brief Description of Project Scope: The renovation at the Martha K. Glaze RYDC will include the removal and replacement of the main plumbing lines throughout the facility (as shown on drawings), removing and reconstructing selected CMU walls along with doors and frames. New doors and frames shall be provided per the specifications provided. Project also includes the demolition of gypsum board ceiling and associated light fixtures within the housing units. New gypsum board ceiling is to be installed along with new light fixtures. The building layout will be modified to develop a shower hub in place of selected youth cells. CMU walls and associated doors and frames will be demolished, and new walls, doors and frames will be constructed per the new shower layout shown on drawings. New light fixtures to be installed in shower hub. GSFIC will use the e-Builder Project Management system to receive, review and store contractor bids and supporting documents. Additional information on this process and a link to the project site is provided below in the Invitation to Bid document and the e-Builder Registration & Bid Submittal User Guide.

More opportunities from Georgia State Financing and Investment Commi

Same awarding agency

NAICS: 236220
New
SLED
TCSG-443-CM Manufacturing & Diesel Lab Reno Chattahoochee Technical College
Solicitation # TCSG-443-CM
The Georgia State Financing and Investment Commission, acting on behalf of the Technical College System of Georgia, is soliciting Construction Management at Risk services for Project No. TCSG-443. The project involves the renovation of Building C at the Chattahoochee Technical College Bartow County campus in Acworth, Georgia. The scope of work includes approximately 28,300 square feet of renovations to the Industrial Maintenance and Diesel Equipment Technology Labs, along with the addition of 1,866 square feet of new space. The primary objective is to modernize the 35-year-old facility to incorporate current technology and expanded student space, with a preliminary estimated construction cost of 7,032,440 dollars. Eligible firms must hold a State of Georgia General Contractor's License, maintain a current asset-to-liability ratio of 1:0 or higher, and have an Experience Modification Rating of 1:2 or less. Insurance requirements include Commercial General Liability coverage of 1,000,000 dollars per occurrence and 2,000,000 dollars general aggregate, as well as a commercial umbrella liability policy of at least 5,000 dollars. Award selection is based on the highest total score, combining a Fee Proposal Score and a Qualifications/Interview Score, the latter of which evaluates project team experience, project approach, and overall impression. Submissions must be provided as a single PDF file not exceeding 50 pages and must include specific certification forms and disclosure statements.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 25 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS