Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

DEEPSTEP ROAD PUMP STATION AND FORCEMAN

Active
PE-75050-NONST-2026-000000058State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

All bidders must hold a valid State of Georgia Utility Contractor License and employ a certified Utility Manager to oversee all work. The project is divided into two divisions: Division One requires the construction of a water line extension featuring a 100-foot jack and bore installation of an 8-inch water line, relocation of one 8-inch water meter into a new vault, installation of a second 8-inch water meter in a new vault, along with associated gate valves and a fire hydrant, to be completed within 60 calendar days. Division Two involves building a raw sewage pump station including a precast wetwell, submersible pumps, road grading, rocky placement, fencing, water service, approximately 5,500 linear feet of 6-inch sewer force main and gravity sewer, and a connection manhole, with a completion deadline of 180 calendar days. Proposals must be submitted using the provided form, with prices stated in both words and figures for the entire scope of work. Each bid must include a Bid Bond in favor of the City of Sandersville, Georgia, equal to at least 5% of the total lump sum bid, guaranteeing that the bidder will enter into a contract and provide Performance and Payment Bonds each equal to 100% of the contract value if awarded. Failure to execute the contract or supply the required bonds within 10 days of notification will result in forfeiture of the Bid Bond as liquidated damages. The solicitation, titled DEEPSTEP ROAD PUMP STATION AND FORCEMAN with number PE-75050-NONST-2026-000000058, was posted on July 30, 2026, and bids are due by August 27, 2026, at 7:00 PM. The work is located in Georgia and managed by the City of Sandersville through point of contact Mandy Soares.

General Info

Bid for Georgia water line and sewage pump station work requiring licensed contractor, certified manager, bid bond, and performance bonds.

Agency

Georgia → City of SandersvilleView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(1)

26043 Advertisement for Bids - Deepstep Road Pump Station and Forcemain

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Sandersville
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → City of Sandersville
View Agency Profile
Office AddressN/A

Full Description

Show more
All Bidders must have a State of Georgia Utility Contractor License and must employ a state ¿Utility Manager¿ certificate holder who will have oversight of all the work. The work to be done consists of furnishing all materials, equipment and labor for the construction of: Division One: Construction of a water line extension including a 100 LF Jack & Bore installation of 8-inch water line, relocation of one 8-inch water meter in new vault and installation of one 8-inch water meter in a new vault to include gate valves and fire hydrant. Time of completion for Division One is 60 calendar days. Division Two: Construction of a raw sewage pump station site including precast wetwell, submersible pumps, road grading, rocking, fencing, water service and approximately 5,500 L.F. of 6-inch sewer force main and gravity sewer and connection manhole.
Time of completion for Division One is 180 calendar days. Proposals for the complete work in one general contract shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. All proposals shall be accompanied by a Bid Bond drawn in favor of the City of Sandersville, Georgia, in the amount of at least 5% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the City of Sandersville, Georgia. Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the City of Sandersville, Georgia as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Federal
LOCHAB Borehole Drilling Services
Solicitation # 19KE5026Q0082
The American Embassy Nairobi, under the Department of State, is soliciting proposals for borehole drilling services at the LOCHAB construction site in the Runda Area of Nairobi. This firm fixed price contract, identified as solicitation 19KE5026Q0082, involves drilling a 360-meter deep borehole, installing steel casings and screens, performing physical and chemical development, and conducting aquifer testing. The scope also includes the procurement and installation of a Grundfos SP17-27 pump with a 15KW-20HP motor and a logic control panel. The estimated contract value ranges from 25,000 to 100,000 USD. Award will be granted to the lowest priced, acceptable, and responsible quoter who meets all pass/fail gates, including SAM registration and technical qualifications. The selected contractor must begin performance within five calendar days of the award and complete all work within 30 construction days. Key requirements include providing an English-speaking on-site supervisor, maintaining a permanent business address in Kenya, and holding certifications from the National Contraction Authority, National Environmental Management Authority, and Water Resources management. Financial obligations include a bank guaranty of 20 percent of the contract price during performance and 10 percent during the guaranty period, as well as Defense Base Act insurance for employees. Invoicing must be submitted electronically via the my ILMS portal, with payments made in local currency via Electronic Funds Transfer within 30 days of a proper invoice. Proposals must be submitted electronically to nairobigsofp@state.gov by the deadline of August 19, 2026.
American Embassy Nairobi

POSTED

about 19 hours ago

DEADLINE

in 14 minutes
View Details
NAICS: 237110
New
Federal
Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems, Caserma Miotto, Longare, Vicenza, Italy.
Solicitation # W912PF26RA011
This construction project at the Miotto Military Installation in Longare, Vicenza, Italy, is a Design-Bid-Build effort to remediate critical failures in the stormwater and sanitary sewer systems to achieve environmental compliance and mitigate flood risks. The scope requires comprehensive repairs, upsizing, and decoupling of cross-connected sewer lines to ensure independent discharge pathways, along with extensive site restoration driven by recent storm damage including soil erosion and landslide vulnerabilities. Key work includes installing a new underground TOC pipe to directly connect to the Bisatto River using established rights-of-way, constructing a stormwater lamination tank beneath a municipal sports field in accordance with Italian Genio Civile regulations, and replacing the field’s surface with synthetic turf over the tank. Additional features involve integrating natural stormwater management elements such as sedimentation tanks, retention ponds, and weir walls to slow and control runoff before discharge. The project includes optional scope items for asbestos pipe removal, landslide area stabilization, and sedimentation pond installation, each as separately priced line items. All work must adhere to U.S. Department of Defense Unified Facilities Criteria including UFC 1-200-01 for building standards, UFC 1-200-02 for sustainable design, and UFC 3-560-01 and UFC 3-600-01 for electrical safety and fire protection, while also complying with CSI MasterFormat and UFGS specification frameworks. Construction must follow a strict five-day work week with weekends and holidays excluded, and traffic on internal roads must remain accessible at all times with alternate one-way flows and sensor-equipped traffic lights. The contract has an estimated performance period of approximately three years, with phase one requiring all external works to commence and complete between September 2026 and September 2027 as mandated by local Italian authorities. Submission of detailed documentation is mandatory, including a visual review report, clash detection report, record model with as-built drawings, and a professionally sealed specification cover sheet. All technical data must be fully legible and consistent with manufacturer documentation, and system sensors and thermostats must be accurately reflected on as-built records. Quality assurance requires the contractor to maintain a Design Quality Control plan meeting professional engineering standards, while the government retains the right to audit submittals without relieving the contractor of responsibility for contract compliance. Final acceptance is contingent upon certification and testing as required by Italian law, with revisions to submitted data needing completion within 30 calendar days. Compliance with stringent security protocols includes restricted information disclosure,
0414 Aq Hq Contract Augmented

POSTED

about 19 hours ago

DEADLINE

in 8 days
View Details

More opportunities from Georgia → City of Sandersville

Same awarding agency