Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on June 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Defense Supply Center Of Richmond (DSCR) HVAC Packaging Unit Replacement

Closed
SP4703-26-Q-0043Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
Federal
Galley Renovation at USCG Station Lake Tahoe
Solicitation # 30670PR260000032
Solicitation 30670PR260000032 is a firm-fixed-price request for proposal issued by the US Coast Guard Regional Support Team – Southwest for the renovation of a 210 square foot galley at Station Lake Tahoe in California. This project is a total set-aside for small businesses with an estimated magnitude between 25,000 and 100,000 dollars. The scope of work includes the demolition and removal of existing cabinetry, countertops, sinks, griddles, and freezer units, followed by the installation of new commercial-grade cabinetry, stainless-steel countertops, a sink and faucet assembly, a combination griddle/burner unit, and a commercial-grade freezer. The existing refrigerator must be preserved and integrated into the new layout. All plumbing, electrical, and gas work must be performed by licensed professionals in accordance with state and local codes. The contract requires performance to commence within 15 calendar days of award, with a mandatory completion period of 60 calendar days. Award will be based on the lowest priced technically acceptable offer, requiring a reasonable technical approach and complete pricing. Key safety and environmental requirements include compliance with OSHA Lead in Construction Standards due to lead-based paint in the southeast corner and adherence to EPA Section 608 regulations for refrigerant reclamation from the old freezer. Offerors must be registered in SAM.gov and provide a detailed pricing breakdown of materials, personnel, and equipment. Proposals must be submitted via email by September 18, 2026, and include a technical approach addressing all statement of work tasks.
Base ALAMEDA(00031)

POSTED

about 4 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
SLED
ICE 8A - Ft Benning Improvements
Solicitation # 70CMSW25R00000011
This firm-fixed-price task order, issued under an 8(a) Multiple Award Construction Contract (MACC) for the DHS Office of Firearms and Tactical Programs, provides design-build services for life, safety, and operational improvements at Fort Benning, Georgia. The project scope includes a variety of facility enhancements such as installing aluminum awnings, replacing turf at Fiske Range, demolishing and restoring Building 2294, improving gutters and drainage at Building 234, and performing commercial HVAC replacements. Additional work involves general improvements to Building 301 and the DAGr Team facility, including office refreshes, the installation of AV equipment and gear storage lockers, and the reconfiguration of restrooms to include walk-in showers. The estimated magnitude of the project is between 4.0 million and 4.5 million dollars, with a period of performance not to exceed 365 days from the date of award. Award will be based on the lowest total evaluated price, provided the offeror demonstrates a technical understanding of the requirements and possesses the necessary licensed professional resources. The contract is subject to the Davis-Bacon Act, requiring adherence to wage determination GA20260320, including specific federal paid sick leave and minimum wage mandates. Performance and payment bonds are required per FAR 52.228-15. Administrative oversight is managed by the Contracting Officer's Representative, Mr. Joseph Addison, and all payment requests must be submitted electronically via the Invoice Processing Platform with accompanying certified payroll.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 5 days
NAICS: 238220
New
SLED
PIDC Project 3 - Dorm RTU Replacement and SCADA
Solicitation # 872287
This firm-fixed-price task order, issued under an 8(a) MACC IDIQ, involves the replacement and upgrade of Rooftop HVAC Units (RTUs) for the Alpha, Bravo, Charlie, and Delta dorms, as well as a SCADA system upgrade at the Port Isabel Detention Center in Los Fresnos, Texas. The project objective is to replace corroded and obsolete equipment with high-quality, coastal weather-resistant, and durable systems that exceed commercial standards. The scope includes removing existing RTUs, replacing necessary piping, electrical, and ducting, and installing new SCADA software and two chemical feed pumps in compliance with Texas Commission of Environmental Quality standards. The estimated magnitude of the project is between 1.2 million and 1.5 million dollars, with a period of performance of 365 days from the date of award. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates a sound technical approach, appropriate design resources, and a comprehensive quality control and safety program. Key requirements include the submission of a Quality Control Plan, a safety plan, and the designation of a Project Manager with at least five years of relevant federal contracting experience. The contractor must also provide a one-year warranty for installation and craftsmanship and ensure all personnel pass required background checks for site access. Compliance with the Davis-Bacon Act and associated executive orders regarding wages and sick leave is mandatory. All payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 12 days
NAICS: 238220
New
RFQ7593 Smoke Detector Installation
Solicitation # RFQ7593
Management & Training Corporation (MTC) is soliciting bids for a fee-for-service subcontracting opportunity to provide smoke detector installation and fire system services at the Sierra Nevada Job Corps Center in Reno, Nevada. The scope of work requires the replacement of 43 smoke detectors across specific dormitory rooms, including 12 detectors in rooms 11, 15, and 18, 12 detectors in room 19, and 19 detectors in rooms 20 and 21. The contractor must ensure all installed detectors communicate with the fire panel and that all work adheres to NFPA standards and local Authority Having Jurisdiction requirements. Bids must be submitted via email to Tom Williams by 3:00 PM PST on September 18, 2026. To be considered, applicants must provide a completed bid sheet, proof of insurance, and a supplier packet containing a W-9, self-certification form, and acceptance of terms and conditions. This opportunity is open to various small business set-asides, including SDB, WOSB, HUBZone, and Veteran-Owned businesses, under NAICS code 238220. Award decisions will be based on the best value as determined by MTC. The contract mandates compliance with Service Contract Labor Standards and Wage Determination No. 2015-5595 Revision 28 for labor rates in Washoe and Storey counties. Additionally, subcontractors must provide a 12-digit Unique Entity ID and certify their debarment status under FAR 52.209-6 if the subcontract exceeds 30,000 dollars. Strict adherence to government and Department of Labor guidance regarding the protection of sensitive and proprietary information is required.
Sierra Nevada Job Corps Center

POSTED

about 12 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
2026-Clearfield-Bldg E8 Welding HVAC
Solicitation # 2026- Clearfield- Welding Bldg. E8 HVAC Replacement
Management & Training Corporation (MTC) is seeking fixed-price lump sum bids for a subcontracting opportunity to replace a 20hp motor connected to the rooftop HVAC system at the Clearfield Job Corps Center in Clearfield, Utah. The scope of work includes providing all labor, supervision, materials, equipment, and permits necessary for the removal and replacement of the motor, ensuring the system is fully operational upon completion. Deliverables include the successful installation and the provision of startup, testing, and commissioning documentation. All work must comply with federal, state, and local codes, OSHA requirements, and site safety procedures. Bids are due by September 19, 2026, at 3:00 PM MST and must be submitted via email to Patricia Willover and Nelson Dar. To be considered, bidders must conduct a physical site visit, sign the attendance roster, and submit a bid bond guarantee. The submission package must include a signed MTC Bid for Lump Sum Contract form and a detailed cost breakout on company letterhead. Award will be based on overall best value. The project is a small business set-aside and requires contractors to provide a 12-digit Unique Entity ID and a 9-digit Tax ID. Compliance with Davis-Bacon prevailing wage rates for Davis County, Utah, is mandatory. Additionally, the successful contractor must provide performance and payment bonds from a surety company with at least an A- rating within five business days of an Intent to Award letter. Payment will be processed via pay applications using AIA G702 and G703 forms based on a previously submitted Schedule of Values.
Management & Training Corporation

POSTED

about 12 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
CBP7664 Wellness HVAC Compressor Replacement
Solicitation # CBP7664
Management & Training Corporation is seeking bids for a subcontracting opportunity to replace a failed HVAC/refrigeration compressor at the Wellness facility of the Sierra Nevada Job Corps Center in Reno, Nevada. This fixed-price, single lump sum contract requires the contractor to provide all labor, materials, and equipment to execute a five-phase process including preparation, demolition, installation of an OEM-specified compressor, system testing and commissioning, and final closeout. The project must restore full cooling capacity and operational efficiency while adhering to EPA Section 608 regulations for refrigerant recovery. The work must be completed within thirty consecutive business days following the receipt of a written Notice to Proceed. Bids will be evaluated based on overall best value, considering price, quality, and delivery schedule. The estimated price range is between 0 and 25,000 dollars, though bids equal to or greater than 25,000 dollars require a 20 percent bid bond guarantee and subsequent performance and payment bonds from an A-rated surety company. Submission requirements include a bid sheet, proof of insurance, three comparable project references, and a completed supplier packet containing a W-9 and self-certification of business size under FAR 52.219-8. Contractors must comply with Davis-Bacon Act prevailing wage rates for Washoe County and adhere to FAR 52.204-10 reporting if the award reaches 40,000 dollars. Final payment is contingent upon a successful final inspection and the submission of a notice of final completion, certified payroll reports, and operation and maintenance manuals.
Sierra Nevada Job Corps Center

POSTED

about 12 hours ago

DEADLINE

in 11 days
NAICS: 238220
New
This is a subcontracting opportunity to replace a chiller in McKinney, TX.
Solicitation # subcontracting-opportunity-replace-chiller-mckinney-tx
Serrato Corporation is seeking subcontractors to replace a failing air-cooled chiller in Building 214/215 at the North Texas Job Corps Center in McKinney, Texas. The project requires the installation of a like-kind, similar model to the existing 246-ton Carrier unit, including demolition and disposal of the old equipment. The scope of work extends to building automation controls via the installation of a JACE 9000 central integration point with a graphical user interface, the installation of four 3-way control valves, and the replacement of three out of four air handler VFDs. Additionally, the contractor must clean and inspect four air handling units, including blower motors, wheels, coils, and screens. Bids must be submitted by September 18, 2026, and must remain valid for 90 days. Required submission documentation includes manufacturer equipment specifications, Form 1413 for Davis-Bacon Act certified payroll for work exceeding 2,000 dollars, and a Certificate of Liability Insurance naming Serrato Corporation as the holder. Insurance minimums include 1 million dollars for Commercial General Liability and Comprehensive Automobile Liability, and 500,000 dollars for Employers Liability. The contractor is responsible for performing startup and operational tests and providing all warranty information and final job documentation. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB.
Serrato Corporation DBA North Texas Job Corps

POSTED

about 12 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
Main Building 1 Wing 5 – Six Rooftop HVAC Unit Replacement – Glenmont Job Corps Center
Solicitation # S26-010
The Glenmont Job Corps Center is soliciting proposals from qualified, New York State licensed contractors for the replacement and installation of HVAC equipment within Main Building No. 1, Wing 5 (Education Building) in Glenmont, New York. The project involves replacing two 7.5-ton split-system units for the auditorium, one 6-ton rooftop unit for the library and computer lab, and one 12.5-ton rooftop unit for the north and east wing classrooms. Additionally, the scope includes installing four 2-ton ductless mini-split heat pump systems, removing a window air-conditioning unit, and abandoning two 5-ton rooftop units in place. Comprehensive associated work encompasses demolition, roof curbs and penetrations, ductwork, refrigerant and condensate piping, electrical work, controls, structural roof evaluations, and fire alarm and duct smoke detector installations, concluding with testing, balancing, and commissioning. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and Veteran-Owned Small Businesses. The project must be completed within 210 calendar days following the written Notice to Proceed, and the facility will remain operational throughout the construction period. Key deadlines include a pre-proposal site walkthrough on September 10, 2026, with vendor questions due by September 14, 2026. Final proposals must be submitted by September 21, 2026, at 4:00 PM ET. All work must comply with applicable New York State codes, safety regulations, and environmental requirements.
Adams and Associates, Inc.

POSTED

about 12 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The Defense Supply Center Richmond is soliciting a firm-fixed price contract for the demolition and replacement of a 20-ton steam-powered indoor package unit with a new 20-ton indoor package unit featuring a heat pump, in accordance with FAR Part 12 and supplemented by FAR Part 36 requirements. The project, identified by solicitation number SP4703-26-Q-0043, is set aside 100% for small businesses under NAICS code 238220, with a size standard of $19 million. The work must be performed at DSCR’s location at 6090 Strathmore Road, Richmond, VA, with performance to be completed within 90 days after issuance of the Notice to Proceed, and the estimated contract value ranges between $100,000 and $250,000. The contractor is responsible for all materials, labor, equipment, and disposal of demolished materials, including supplying a dumpster and portable bathroom for the duration of the project. All disturbed areas must be restored to their original condition, including detailed concrete repairs, grinding, polishing, and color-matched painting following inspection and approval. The old unit’s refrigerant must be safely recovered into government-provided cylinders and properly documented. The new unit must be properly mounted, connected to existing ductwork, integrated into the current control system, charged with the correct refrigerant amount, subjected to leak testing and evacuation, and labeled with refrigerant type and safety warnings. Commissioning requires a 72-hour notice to DLA personnel, verification of system metrics including pressures, voltages, airflow, and temperatures, thermostat testing, and final performance verification documentation. The contractor must submit an Occupational Safety and Health Plan, updated project schedules, equipment data sheets, a one-year warranty letter, and other closeout documentation. All work must comply with OSHA, EM 385-1-1, NEC, and NFPA standards, and the contractor must maintain a bona fide business within 125 miles of DSCR with at least one full-time employee at the location. Participation requires pre-enrollment in DBIDS for site access, and all personnel must pass NACI or equivalent security vetting. Submissions must be made via email to Benjamin Maxwell at benjamin.maxwell@dla.mil by June 12, 2026, and offerors must be registered in SAM prior to award. Award will be made on a

General Info

Demolition and replacement of 20-ton HVAC unit at DSCR, small business set-aside, 90-day completion.

Agency

Department Of Defense → Dcso Richmond Division #1View Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

Richmond, VA, 23237, USA

Set-Aside

SBA

Documents

(7)

Photo-3.jpg

JPG

Photo-2.jpg

JPG

DSCR-B66C-SOW-PackageUnit HVAC Replacement

PDFsow

Wage Determination VA20260007 for Building Construction in Virginia

PDFwage-determination

Solicitation SP4703-26-Q-0043 HVAC Packaging Unit Replacement

PDFrfq

Q+and+A+Matrix_DSCR+HVAC+Packaging+Unit+Replacement.xlsx

XLSX

Photo-1.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Dcso Richmond Division #1
Contacts2 people available
OfficeRICHMOND, VA, 23237, USA
Organization / Agency
Department Of Defense → Dcso Richmond Division #1
View Agency Profile
Office AddressRICHMOND, VA, 23237, USA
Contacts
Benjamin Maxwell
Robert Moragues Contracting Officer

Full Description

Show more

Combined Synopsis/Solicitation for commercial goods and services IAW FAR part 12.


Defense Supply Center Richmond (DSCR) B66C HVAC Packaging Unit Replacement


This is a solicitation for construction prepared in accordance with the format in FAR Part 36, as supplemented with additional information included in this notice. The solicitation number SP4703-26-Q-0043 is issued as a request for quote (RFQ). The resulting contract will be a firm-fixed price award with a period of performance of 90 days after the Notice to Proceed.


1. OBJECTIVES
Demolish and replace a 20-Ton indoor package unit with a brand new, fully functional, 20-Ton indoor package unit with
a heat pump. The new unit must be integrated into the current unit’s operating system.


2. BACKGROUND
The current steam powered 20-Ton Package unit has been subjected to condensation and leaks overflowing onto the floor.
The excessive amount of water has led to the surrounding area being damaged and repaired multiple times.


3. SPECIFIC REQUIREMENTS
The contractor is responsible for all material, hardware, tools, labor, etc. The contractor shall supply a dumpster and a portable bathroom for the duration of the project. All demolished material shall be disposed of off-site. The areas that were disturbed shall be fixed to restore original condition. All hardware and equipment shall be fully operational after turnover.


The contractor shall:


3.1 Mobilization
• Submit any documentations required to execute this project, i.e. certifications, equipment submittals, project schedule, etc.
• Deliver any equipment that is to be used during the execution of this project, i.e. scaffolds/lifts, safety equipment, tools, etc.


3.2 Site Preparation and Protection
• Install a barrier to isolate the work area to ensure anyone not authorized enters the constructions zone.
• Display signage warning people that authorization and Personal Protective Equipment are required when entering a construction zone.


3.3 HVAC Demolition
• Discharge the current unit refrigerant into cylinders provided by the installation. Once discharged, the refrigerant is to be documented and turned into the installation via the Project Manager.
• Remove the current 20-Ton Steam Package unit in Bay D.
• Cut and cap the steam lines that were powering the current unit.
• Dispose of all the debris off site.


3.4 Flooring Repair
• Inspect the affected area to determine the extent of water erosion and surface deterioration.
• Document existing conditions (photos, measurements, reports, etc.).
• Mechanically grind damaged area to expose sounds substrate and clean the area using an appropriate method i.e. vacuuming, pressure washing, etc.
o Give 48-hour notice to the Project Manager for inspection and approval.
o No harmful chemicals may be used.
• Fill in the removed and eroded sections using appropriate concrete repair material so that the area is level and
smooth to match the adjacent surface.
o Allow adequate cure time per manufacture specification.
• Grind and polish utilizing diamond abrasive to achieve a uniform finish to the surrounding area.
• Apply a sealant and/or protective coating to strengthen the surface.
• Paint the area to match the existing color.
o Contractor is to take a sample to match the color.


3.5 HVAC Installation
• Install a 20-Ton Indoor Package unit with a Heat Pump utilizing proper mounting specifications from the manufacture.
• Install an appropriate size duct to connect to the existing ductwork.
• Install the proper condensation control equipment such as drain pan, drain pump, etc.
• Integrate the new equipment into the current control system to ensure proper operation.
• Charge system with the proper amount of refrigerant as recommended by manufactures specifications
• Perform leak test and evacuate the system before final charge
• Provide necessary labeling for refrigerant type and safety precautions


3.6 Start up and Commissioning
• Start up and commission the system per manufacture guidelines
o Give 72-hour notice to start up and have the Project Manager and other DLA personnel present during start up
• Verify system metric such as pressures, voltages, amperages, airflow and temperatures differentials
• Test thermostats and controls for proper operation
• Provide a final inspection and performance verification report


3.7 Demobilization
• Submit any closeout documentations required i.e. material data sheet, warranty letter, etc. (see below for further details).
• Brief and train our maintenance team on how to properly operate and maintain the new equipment (can be done during start up).
• Remove any equipment, material, debris, tools, etc. from the jobsite ensuring the area is clean and clear of any hazardous material and ready for use.


This acquisition is set-aside for 100% small businesses. The North American Industry Classification System (NAICS) Code is 238220. The small business size standard is $19M. Department of Labor Wage Determination based on location of the service provided (Richmond, VA). Partial proposals will not be accepted.


For an offer to be considered for award, the contractor must own, possess, or otherwise control a bona fide place of business from which mobilization occurs within 125 miles of Defense Supply Center Richmond. A bona fide place of business refers to a location where the offeror regularly maintains an office with at least one full-time employee. The offeror must include the address of this location in its bid.


Award will be made to the lowest priced, technically acceptable (LPTA) offeror that meets the requirements stated in the Statement of Work and the solicitation. Also refer to clauses and provisions included in this notice. Past performance will be considered a part of Technical Acceptability, and the Contracting Officer will pull contractor data from CPARS and SPRS. The contractor must be registered in the System for Award Management (SAM) prior to award. If not already registered in SAM, go to the SAM website www.sam.gov to register prior to submitting your quote.


Acceptable method of quote or inquiries submission is Email to benjamin.maxwell@dla.mil.


A site visit will be held 27MAY26 @1000. See p.46 of SOW for DSCR map for location of DSCR B66C meeting location and parking location. There is a map at the end of the SOW.


In order to attend the site visit interested parties MUST follow the instructions below no less than 5 business days prior to the site visit. This is to allow time for vetting by base security. Plan on arriving at DSCR an hour prior to the site visit time, as the processing time through the visitor center fluctuates. Follow the link below to register through DBIDS, and a QR code should be provided for each visitor. The QR codes MUST be emailed to the Project Manager, Jose Reynoso <Jose.Reynoso@dla.mil.> (Work Cell: (804) 279-2970). The QR code MUST be emailed to the project manager as soon as possible due to the lengthy vetting process of approximately 5 business days. The project manager will also serve as the sponsor for site visit attendees.


A new system was implemented on 3 January 2023 to screen visitors and contractors for installation access at DSCR. The new system is designed to increase efficiencies, enhance the protection of personal information during the vetting process and eliminate the use of hard copy DLA Form 1815s. The new screening system will require visitors and contractors to pre-enroll in DBIDS (Defense Biometric Identification System). To begin the process, visitors and contractors will complete registration through the pre-enrollment website:


https://dbids-global-enroll.dmdc.mil.


Upon entry of their information, visiting personnel will be provided an electronic form to download, which will have an individualized barcode and alpha numeric code. The codes need to be sent to the visiting person’s sponsor. Once in receipt of the barcode, the sponsor will email Security and Emergency Services and provide thebarcode and sponsorship information. Once the visitor/contractor is vetted and approved for installation access, Security & Emergency Services will notify the sponsor that the visitor/contractor can go to the DSCR Visitor Center to obtain his/her pass. At the Visitor Center, the visitor provides the barcode and code provided earlier in the process and completes the credentialing process.


See attached SOW for full requirement details. Parties interested in submitting a quote for this project are advised and expected to have reviewed the entire SOW prior to site visit attendance.


Questions are due on 29MAY26, end of day. Submit questions via email to benjamin.maxwell@dla.mil.


Quotes are due 12JUN26, end of day.


The point of contact (POC) for this requirement is Benjamin Maxwell (benjamin.maxwell@dla.mil).


Reference Attachment 1 - Statement of Work (SOW) for additional work scope and details.


Period of Performance:
90 days from Notice to Proceed



MAGINITUDE OF CONSTRUCTION
36.204 Disclosure of the magnitude of construction projects. | Acquisition.GOV
In accordance with FAR Part 36.204(c), the estimated Magnitude of Construction for this contract is between $100,000 and $250,000.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS