Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on June 4, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Demolish Multi Vacant Facilities B#504, #720, #728, FAC#638, Osan AB (MATOC Non-Work Plan)

Closed
W90VN6-24-R-0016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

23622

Place of Performance

Osan AB, KR-41, KOR

Set-Aside

NONE

Documents

3

Project Drawings - Site Plans (A-1 to A-5)

PDF, High priority: read this first5 pages · specifications
High

W90VN6-24-R-0016: Demo Multi Vacant Facilities

PDF, High priority: read this first22 pages · rfp
High

SMYU 22-1066 Demo B504, B720, B728, Fac #638 - Submittal Register

PDF, Low prioritysubmittal-register
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → 0906 Aq Co Contracting Bat
Contacts2 people available
OfficeAPO, AP, 96202-0000, USA
Office AddressAPO, AP, 96202-0000, USA

Full Description

Show more
2. PRINCIPLE FEATURES: This project includes the following principle features: DEMOLITION WORK: 2.1.1. B504 2.1.1.1. Demolish/Dispose of building B504 including all building elements such as foundation, slab, floor, wall, column, beam, ceiling, finishes, doors, windows, furniture, applicances, roof, toilet fixture/accessories, insulation, awnings, HVAC & Plumbing systems, fuel, fluids and refrigerant, electrical systems, fire suppression/alarm/mass notification systems, CATV/CCTV/COMM systems, mechanical and electrical equipment etc. and related infrastructure as shown within the project boundary. 2.1.1.2. Demolish/Dispose of outdoor site elements such as sidewalks, concrete pad, convault fuel tank, air conditioners, septic tank, and all other exterior structures that lose their usage after the facility identified in SOW 2.1.1.1. has been demolished. 2.1.1.3. Provide grading work after demolished features are removed and provide grass re-seeding. 2.1.2. B720 & B728 Demolish/Dispose of buildings B720 & B728 including all building elements such as foundation, slab, floor, wall, column, beam, ceiling, finishes, doors, windows, furniture, applicances, roof, toilet fixture/accessories, insulation, awnings, HVAC & Plumbing systems, fuel, fluids and refrigerant, electrical systems, fire suppression/alarm/mass notification systems, CATV/CCTV/COMM systems, mechanical and electrical equipment etc. and related infrastructure as shown within the project boundary. Demolish/Dispose of outdoor site elements such as basketball court, basketball court lighting, sidewalks, parking lot, parking lot lighting, driveways, curbs, pad mounted transformer, concrete pads, sewer manhole, sewer main line and service line, water service line, trash enclosure, mechanical and electrical equipment, convault fuel tank, and all other exterior structures and installations that lose their usage after the buildings identified in SOW 2.1.2.1. have been demolished. Maintain communications line, natural gas main line, overhead primary electric feeder line, stormwater drainage channel, and fire hydrants within the identified project boundary. Provide grading work after demolished features are removed and provide grass re-seeding. 2.1.4. Fac#638 2.1.4.1. Demolish/Dispose of Facility #638 including all facility elements such as convault fuel tank, electric power generator, pad mounted transformer, revetments, concrete pad foundation, fence surrounding the facility, lightpoles, etc. as shown within the project boundary. 2.1.4.2. Demolish/Dispose of outdoor site elements and all other exterior structures that lose their usage after the facility identified in SOW 2.1.3.1. has been demolished. 2.1.4.3. Convert Facility #638 site location to an asphalt concrete parking lot and install a new fence to enclose the existing fence around B622 as shown on the site plan. 2.1.5. General Demo Requirement Terminate, remove, shut off, cut and cap existing underground and overhead utilities such as domestic water, fire water, storm drainage, sewer, fuel, power, communication including associated manholes, handholes, transformers, switches, poles, steelwork, concrete, pavement and finishes as indicated on the drawings. Re-finishes will match with adjacent materials. Existing utilities not included in the demolition work will be protected from damage. Disassemble and collect salvageable materials as listed in Appendix - B and, transport to 51 CES supply yard near B657. Dispose of all demolished construction debris to off base dump site in accordance with KEGS (Korean Environmental Governing Standards). Any damages to existing pavement, utilities, and other property not specified for demolition shall be repaired by the Contractor at no expense to the government. When contaminated soil is encountered during the course of demolition work, report to the Base Environmental Manage Office (51CES/CEIE). Contaminated soil will be excavated and transported to the base land farm based on the disposal criteria of total petroleum hydrocarbons (TPH) level-800 milligrams per kilogram in accordance with the direction from the Base Environmental Management Office. Any exposed soil caused by excavation will be covered if left over night and, only watertight dumpsters are acceptable for use on site. Contractor will take appropriate measures to minimize dust generation during and after construction until the site is reclaimed IAW KEGS 2-3.i, Table 2-7. Segregation and collection of reinforcing bars from demolished reinforced concrete will not be allowed at the job site. Contractor will coordinate with 51CES/CEIE to take a briefing on stormwater and spill response procedure prior to start any site activities. Contractor will segregate light bulbs and ballasts by brand and type. Florescent lights containing mercury shall be disposed IAW USFD Reg. 201-1 and, KEGS. All removed pad-mounted swithches and transformers will be turned in to Osan Transformer Storage Area (B647) to be properly disposed of them IAW USFK Regulation 201-1, KEGS. If it's weeping/leaking, switches/trasformers should be set on drip pan enough to hold remaining liquid. Also ensure regrigerant (Ozone Depleting Substnaces) from chiller or other HVAC system should be properly removed/disposed. Contact/coordinate with 51CES/CEO through COR for demolition of any utilities, for removal of fuel tank and fuel, asbestos control and removal, tree removal, dust controls, performing EMS & Environmental Awareness Training, removal of fire lines or hydrant and for removal of Communication systems and CATV prior to starting work. Scrap metal, including metal structures, metal roofs, metal fuel tanks, metal railings, metal beams, copper pipes and tubing, and HVAC equipment (chillers and boilers etc.), will be collected by the contractor for disposal and sale through the Osan AB Qualified Recycling Program (QRP) in accordance with DOD Instruction 4715.23, which requires the installation's QRP to receive money through the sale of all installation recyclables. The scrap metal will be turned into the location QRP designates on base. The Contractor shall segregate recyclables and inform the QRP Manager through the COR in the Environmental Office at DSN 784-5819 or 0505-784-5819, when the segregated scrap metal excluding construction debris is ready for removal. Contractor will implement stormwater Best Management Practices (BMP) for the Demolition Sites including stormwater inlet protection, perimeter controls (silt fence), vehicle tracking, erosion control and final stabilization.

More opportunities from Department Of Defense → 0906 Aq Co Contracting Bat

Same awarding agency

NAICS: 325120
New
Federal
Propane Gas Delivery to Osan Air Base
Solicitation # W90VN627Q1CQ7
Solicitation W90VN6-27-Q-1CQ7 is a single-award requirements contract for the delivery of full 50 kg propane tanks to designated facilities at Osan Air Base. The contract follows a five-year period of performance, consisting of a 12-month base period and four 12-month option years, with an estimated annual quantity of 1,440 tanks. The contractor is responsible for providing all vehicles, equipment, labor, and supervision necessary to perform the work, which is generally conducted Monday through Friday between 0730 and 1600 Korea Standard Time. This is a firm-fixed-price contract with an economic price adjustment clause allowing for price modifications if the applicable index moves by plus or minus 10 percent after the initial six months. To be eligible, offerors must possess valid Republic of Korea business licenses, including Korea LPG Business Registration and hazardous materials transport certifications, and must submit all pricing in Korean Won. Award is based on a two-factor evaluation of technical capability and price; technical capability is rated as acceptable or unacceptable based on licensing and a minimum of one relevant contract reference from the past five years. Only technically acceptable quotes will be considered, with the award going to the responsible offeror providing the best value. Performance requires strict adherence to ROK safety regulations and EM 385-1-1 safety and occupational health standards, with the government reserving the right to perform spot checks on deliveries.
Industrial Gas Manufacturing

POSTED

1 day ago

DEADLINE

in about 15 hours
View Details
NAICS: 332999
New
Federal
ACTIVE VEHICLE BARRIERS AND ASSOCIATED CONTROL SYSTEM AT OSAN AIR BASE
Solicitation # W90VN626QA017
Solicitation W90VN626QA017 is a commercial acquisition conducted under the Logistic Cost Sharing program for the purchase, installation, and integration of DoD Anti-Ram Listed Active Vehicle Barrier (AVB) systems and associated Access Control Point (ACP) control systems at the Morin and Main Gates of Osan Air Base, Republic of Korea. The contractor is responsible for a turn-key scope of work including the demolition and disposal of existing barriers, all necessary civil, electrical, and foundation site work, and the complete installation and power integration of new equipment. A critical component of the project involves complex Programmable Logic Controller (PLC) reprogramming to synchronize operations across gatehouses, overwatch booths, vehicle inspection centers, and traffic lights to ensure fail-safe security functionality during both normal operations and power-loss conditions. Technical requirements specify that equipment must be listed on the DoD Anti-Ram Vehicle Barriers List, with H30/P1 rated barriers required for the Morin Gate and M50/P1 or M50/P2 rated barriers for the Main Gate. Performance standards mandate a powered deployment time of 1.5 seconds or less and a power-loss deployment time of 5 seconds or less. The government will award a firm-fixed-price contract based on the lowest-priced, technically acceptable offer with an acceptable past performance rating. Quotes must be submitted electronically via the PIEE Solicitation Module in four separate volumes, including a redacted technical volume and a price volume in Excel format. Following multiple amendments, the final response deadline is November 4, 2026, with an estimated delivery date of July 30, 2027.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

3 days ago

DEADLINE

in 6 days
View Details
NAICS: 561790
New
Federal
Cleaning of Food Service Exhaust Fans and Ducts for Dining Facilities in USAG Yongsan-Casey.
Solicitation # W90VN827RA001
Solicitation W90VN827RA001 seeks a contractor to provide non-personal cleaning services for kitchen exhaust systems, including hoods, ducts, and rooftop exhaust fans, for 33 dining facilities under the jurisdiction of USAG Yongsan-Casey in South Korea. The primary objective is to mitigate fire hazards caused by grease accumulation, with all work required to comply with NFPA 96 and Army Regulation 420-1. The contract is structured as a firm-fixed-price agreement with a total potential duration not to exceed 66 months, consisting of a base period, three option years, and a phase-out period. Services are generally performed monthly, with the exception of the Koryosan DFAC, which requires semi-annual cleaning. Award will be based on best value, evaluating technical capability, past performance, and price. Technical evaluation specifically requires offerors to possess a valid ROK Government business license, a Hygiene Management Permission License, and an Annual Hygiene Training Certificate for 2026. Proposals must be submitted via the PIEE Solicitation app in three separate volumes, with strict page limits for technical and past performance sections and a prohibition on pricing data within the technical proposal. The government maintains a high quality standard, allowing no more than one defect per year, with a requirement for remediation within 24 hours of notification.
Other Services to Buildings and Dwellings

POSTED

6 days ago

DEADLINE

in about 11 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS