DEMOLITION OF 364 THORINGTON ROAD

Active
CP 2603State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation CP 2603, titled Demolition of 364 Thorington Road, involves the comprehensive removal of all residential structures and site improvements at the specified location in Montgomery, Alabama. The scope of work includes the demolition of buildings, foundations, slabs, and utilities, as well as the removal of designated vegetation. The contractor is responsible for the legal disposal of all debris and hazardous materials, as well as backfilling and compacting excavations. Final site requirements include grading for positive drainage and seeding for erosion control, while ensuring that existing perimeter walls, paved roads, and curbs remain protected and intact. This project is issued by the City of Montgomery, Alabama, with the response deadline set for September 29, 2026. The primary point of contact for this solicitation is City Operations Program Manager Walter Bush. Interested parties can find further details and submission guidelines through the official procurement portal.

General Info

City of Montgomery solicitation for demolition at 364 Thorington Road by September 29, 2026.

Agency

Alabama → PIPE-InspectionsView Agency

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

AL, USA

Set-Aside

NONE

Documents

(1)

Demolition of 364 Thorington Road - Notice to Contractors

PDFifb

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyAlabama → PIPE-Inspections
Contacts1 person available
OfficeMontgomery, AL, 36104, USA
Organization / Agency
Alabama → PIPE-Inspections
View Agency Profile
Office AddressMontgomery, AL, 36104, USA
Contacts
Walter BushCity Operations Program Manager

Interested Companies (3)

Show more
Travis McNeal
Hope hull, AL
Adelphi Services Group
Atlanta, GA
Florida Surety Bonds
Maitland, FL

Full Description

Show more
The work consists of the comprehensive demolition and removal of all existing residential structures and associated site improvements within the project limits at 364 Thorington Road, including buildings, foundations, footings, slabs, conjoining sidewalks, mechanical and electrical equipment, designated utilities, and other improvements indicated for removal. The Contractor shall disconnect, terminate, cap, abandon, or remove existing utilities as indicated; remove designated trees, stumps, brush, shrubs, hedges, and other vegetation necessary to complete the demolition and final grading; legally remove and dispose of all demolition debris and hazardous materials; and backfill and compact all excavations and voids resulting from demolition. Upon completion, all disturbed areas shall be graded to provide positive drainage and a smooth, stable surface suitable for commercial mowing and shall be seeded for erosion control. The existing perimeter concrete fence/wall, existing paved roads, and existing curbs shall remain and shall be protected from damage throughout all demolition and site restoration activities .

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
DEMOLITION OF 3019 FAIRWEST PLACE
Solicitation # CP 2507
This solicitation, identified as CP 2507, involves the complete demolition and removal of the existing building and site improvements located at 3019 Fairwest Place in Montgomery, Alabama. The scope of work requires the contractor to demolish the structure down to the building pad, encompassing all architectural, structural, mechanical, electrical, and plumbing systems, as well as concrete slabs, sidewalks, and fencing. The project includes the disconnection and capping of all utilities in coordination with relevant agencies, the removal of the water meter, and the protection of services to adjacent properties. All hazardous materials, refrigerants, and debris must be disposed of in strict accordance with EPA, state, and local regulations, with debris removed from the site daily. Following the demolition, the contractor is responsible for backfilling and grading the site to ensure positive drainage and stabilization for mowing. The project also mandates the installation and maintenance of erosion and sediment control measures throughout the construction process. All work must comply with applicable codes and permitting requirements, maintaining coordination with governing authorities and utility providers. Interested parties must submit their responses by the deadline of September 29, 2026, at 5:00 PM. The project is managed by the Alabama agency PIPE-Inspections, with Walter Bush serving as the primary point of contact.
PIPE-Inspections

POSTED

about 13 hours ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS